CN202124817U - Awning for concrete road surface construction - Google Patents
Awning for concrete road surface construction Download PDFInfo
- Publication number
- CN202124817U CN202124817U CN2011201889306U CN201120188930U CN202124817U CN 202124817 U CN202124817 U CN 202124817U CN 2011201889306 U CN2011201889306 U CN 2011201889306U CN 201120188930 U CN201120188930 U CN 201120188930U CN 202124817 U CN202124817 U CN 202124817U
- Authority
- CN
- China
- Prior art keywords
- road surface
- construction
- awning
- frame
- concrete road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model discloses an awning for concrete road surface construction, which comprises two bottom beams, idler wheels, an awning frame and tarpaulin. The lower portion of each bottom beam is in pivot connection with a plurality of idler wheels, two ends of the awning frame are respectively fixed on two bottom beams, and the awning frame is in an arc shape. The tarpaulin is bridged on the awning frame and made of waterproof and non-transparent materials, and the width between two bottom beams is larger than that of a road surface. The awning for the concrete road surface construction has the advantages of being simple in structure, convenient to move and capable of avoiding rain and sun better during the concrete road surface construction, guaranteeing construction quality of the concrete road surface, avoiding waste caused by reconstruction, guaranteeing construction schedules and reducing engineering cost.
Description
Technical field
The utility model relates to a kind of screening rain, sunshade, and particularly a kind of cement pavement construction is with hiding rain, sunshade.
Background technology
At present; In construction of cement concrete road surface, run into the situation of raining suddenly through regular meeting, when just smooth intact road surface does not also reach initial setting strength and do not acquire a certain degree; If by rain drop erosion; The surface will produce pitted skin with undisguised, if pitted skin, undisguisedly seriously will remove this part road surface and build again, causes bigger economic loss.
In addition, when construction of cement concrete road surface, if the overabundant words of sunshine; The road surfaces moisture short time after smooth will be evaporated, and causes the surface to produce large-area shrinkage crack, causes the construction disease; The serious examination of can't handing over brings hidden danger also for normal in the future the use.
Summary of the invention
The purpose of the utility model be for solve in construction of cement concrete road surface meet suddenly rain wash away road surface and just smooth intact road surface by the very fast a kind of cement pavement construction that produces the problem of shrinkage crack and provide of strong illumination surface moisture evaporation with hiding rain, sunshade.
The utility model is made up of bottom girder, roller, frame and tarpaulin; Be provided with two foundation beams, the bottom of every foundation beam is articulated with several rollers, the two ends of frame be separately fixed at two foundation beams above; Frame is an arc; Tarpaulin is set up on frame, and tarpaulin is processed by waterproof, opaque material, and the width between the two foundation beams is greater than the width on road surface.
The operating principle of the utility model:
The utility model is across being located on the firm smooth intact cement concrete pavement; If rain suddenly during construction; Rain drop erosion will scatter the both sides on road surface on fluid-tight tarpaulin, rainwater can directly not be washed on the just smooth road surface, and road surfaces just can not produced undisguised and pitted skin by rain drop erosion; When sunlight is relatively more sufficient; Shift the utility model onto just smooth intact road surface place, sunlight just can direct irradiation at just smooth road surfaces, the moisture on just smooth road surface produces shrinkage crack with regard to not evaporating at short notice.
The beneficial effect of the utility model is:
Simple in structure, conveniently moving is during construction of cement concrete road surface; Can hide rain, sunshade preferably; Stopped cement pavement and when construction, met rain suddenly and just smooth intact road surfaces is washed away and the undisguised and pitted skin that produces by water, when sunny, can keep the sun off not can direct irradiation on the road surface of just having constructed, the generation of having stopped shrinkage crack; Guaranteed the construction quality of cement concrete pavement; Stop the generation of rejection and waste phenomenon, guaranteed the progress of construction, reduced engineering cost.
Description of drawings
Fig. 1 is the utility model schematic perspective view.
1, bottom girder 2, roller 3, frame 4, tarpaulin.
The specific embodiment
See also shown in Figure 1: the utility model is made up of bottom girder 1, roller 2, frame 3 and tarpaulin 4; Be provided with two foundation beams 1, the bottom of every foundation beam 1 is articulated with five rollers 2, the two ends of frame 3 be separately fixed at two foundation beams 1 above; Frame 3 is an arc; Tarpaulin 4 is set up on frame 3, and tarpaulin 4 is processed by waterproof, opaque material, and the width between the two foundation beams 1 is greater than the width on road surface.
Claims (3)
1. a cement pavement construction is with hiding rain, sunshade; It is characterized in that: form by bottom girder, roller, frame and tarpaulin; Be provided with two foundation beams, the bottom of every foundation beam is articulated with several rollers, the two ends of frame be separately fixed at two foundation beams above; Tarpaulin is set up on frame, and the width between the two foundation beams is greater than the width on road surface.
2. cement pavement according to claim 1 construction is characterized in that with hiding rain, sunshade: described frame is an arc.
3. cement pavement construction according to claim 1 is with hiding rain, sunshade, and it is characterized in that: described tarpaulin is processed by waterproof, opaque material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201889306U CN202124817U (en) | 2011-06-08 | 2011-06-08 | Awning for concrete road surface construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201889306U CN202124817U (en) | 2011-06-08 | 2011-06-08 | Awning for concrete road surface construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202124817U true CN202124817U (en) | 2012-01-25 |
Family
ID=45487889
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201889306U Expired - Fee Related CN202124817U (en) | 2011-06-08 | 2011-06-08 | Awning for concrete road surface construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202124817U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060860A (en) * | 2014-06-30 | 2014-09-24 | 中铁七局集团第一工程有限公司 | Sectional telescopic rainproof shed and application method for prefabricating concrete T beam |
CN106758640A (en) * | 2016-11-09 | 2017-05-31 | 中铁局集团天津建设工程有限公司 | A kind of town road and its construction method |
CN107780327A (en) * | 2017-12-07 | 2018-03-09 | 辽宁科技大学 | Road maintenance assembled dual control road prevention cover |
CN109024147A (en) * | 2018-08-02 | 2018-12-18 | 中国冶集团有限公司 | Shoal water source comprehensive cyclic utilization system and its construction method |
CN111424510A (en) * | 2020-04-16 | 2020-07-17 | 四川永晖建筑工程有限公司 | Asphalt pavement construction device in rain and construction method thereof |
-
2011
- 2011-06-08 CN CN2011201889306U patent/CN202124817U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060860A (en) * | 2014-06-30 | 2014-09-24 | 中铁七局集团第一工程有限公司 | Sectional telescopic rainproof shed and application method for prefabricating concrete T beam |
CN106758640A (en) * | 2016-11-09 | 2017-05-31 | 中铁局集团天津建设工程有限公司 | A kind of town road and its construction method |
CN106758640B (en) * | 2016-11-09 | 2020-10-20 | 中铁一局集团天津建设工程有限公司 | Municipal road and construction method thereof |
CN107780327A (en) * | 2017-12-07 | 2018-03-09 | 辽宁科技大学 | Road maintenance assembled dual control road prevention cover |
CN109024147A (en) * | 2018-08-02 | 2018-12-18 | 中国冶集团有限公司 | Shoal water source comprehensive cyclic utilization system and its construction method |
CN109024147B (en) * | 2018-08-02 | 2020-10-20 | 中国一冶集团有限公司 | Comprehensive recycling system for sandbar water source and construction method thereof |
CN111424510A (en) * | 2020-04-16 | 2020-07-17 | 四川永晖建筑工程有限公司 | Asphalt pavement construction device in rain and construction method thereof |
CN111424510B (en) * | 2020-04-16 | 2021-08-06 | 四川永晖建筑工程有限公司 | Asphalt pavement construction device in rain and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202124817U (en) | Awning for concrete road surface construction | |
CN104320067B (en) | Automatic dirt and snow removing equipment for roof solar cell panel | |
CN105821949A (en) | Sponge city complex | |
CN206385742U (en) | Remove the snow structure on a kind of glass sunlight house roof | |
CN209686208U (en) | A kind of undisguised material sponge permeable terrace curing means | |
CN204225375U (en) | A kind of roof garden structure | |
CN203373918U (en) | Waterproofing work construction structure of pseudo-classic architecture roof cornice | |
CN204552255U (en) | Integral movable type rain-proof shelter | |
CN202830689U (en) | Curb with drainage function | |
CN106498823A (en) | A kind of ecological, environmental protective water-permeable brick | |
CN203961344U (en) | Seat automatic cleaning type bus shelter | |
CN203233767U (en) | Fence green belt | |
CN207110273U (en) | A kind of glass pumice base roof drainage flow guide system | |
CN206184508U (en) | Fitment is with high -efficient breaker of condensate water clod | |
CN206650617U (en) | A kind of venetian blind type photovoltaic cell group | |
CN206319224U (en) | A kind of ecological, environmental protective water-permeable brick | |
CN205242240U (en) | Multi -functional solar energy shelter bridge | |
CN203867027U (en) | Sunshine roof structure | |
CN205475647U (en) | Rain water grate | |
CN104675185A (en) | Integrated movable rainproof shed | |
CN205617184U (en) | Outdoor ceramic tile caulking strips that permeates water | |
CN214648744U (en) | Novel steel rain-proof structure | |
CN203049410U (en) | Novel paver sunshade with gantry-type structure | |
CN104746909A (en) | Green energy saving sports stand | |
CN215056579U (en) | Energy-saving door and window for green building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120125 Termination date: 20120608 |