CN202119860U - Current transformer polarity testing box - Google Patents

Current transformer polarity testing box Download PDF

Info

Publication number
CN202119860U
CN202119860U CN 201120222002 CN201120222002U CN202119860U CN 202119860 U CN202119860 U CN 202119860U CN 201120222002 CN201120222002 CN 201120222002 CN 201120222002 U CN201120222002 U CN 201120222002U CN 202119860 U CN202119860 U CN 202119860U
Authority
CN
China
Prior art keywords
phase
current transformer
test
polarity
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120222002
Other languages
Chinese (zh)
Inventor
杜彦巍
罗卫东
山春风
王军克
谷双奎
叶俊海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Shijiazhuang Power Supply Co Ltd
State Grid Corp of China SGCC
Original Assignee
Shijiazhuang Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Power Supply Co Ltd filed Critical Shijiazhuang Power Supply Co Ltd
Priority to CN 201120222002 priority Critical patent/CN202119860U/en
Application granted granted Critical
Publication of CN202119860U publication Critical patent/CN202119860U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

本实用新型涉及一种电流互感器极性测试箱。其包括一个箱体,在箱体上装配有一排二次接线端子,在一排二次接线端子下设有与二次接线端子对应连接的一排极性测试专用指针表,在一排极性测试专用指针表下设置有与极性测试专用指针表对应连接的可调电阻,在箱体上设置有A、B、C三相一次接线端子,在A、B、C三相一次接线端子下设有对应A、B、C三相一次接线端子的A、B、C三相相别切断开关,在A、B、C三相相别切断开关下设有试验按钮,在箱体内设置有A、B、C三相一次接线端子、A、B、C三相相别切断开关以及试验按钮配套的电源。本实用新型可实现三相同时测试,现场无需携带试验线、材料、仪器等设备,集成度高。

Figure 201120222002

The utility model relates to a polarity test box for a current transformer. It consists of a box body, on which a row of secondary wiring terminals is assembled. Under the row of secondary wiring terminals, there is a row of special pointer meters for polarity testing correspondingly connected to the secondary wiring terminals. There is an adjustable resistor connected to the special pointer meter for polarity test under the special pointer meter for testing. There are three-phase primary terminals of A, B, and C on the box body. There are A, B, and C three-phase cut-off switches corresponding to the A, B, and C three-phase primary terminals. There are test buttons under the A, B, and C three-phase cut-off switches, and there is an A in the box. , B, C three-phase primary terminal, A, B, C three-phase cut-off switch and test button matching power supply. The utility model can realize simultaneous testing of three phases, without carrying test lines, materials, instruments and other equipment on site, and has a high degree of integration.

Figure 201120222002

Description

一种电流互感器极性测试箱A current transformer polarity test box

技术领域 technical field

本实用新型涉及一种电流互感器极性测试箱。 The utility model relates to a polarity test box for a current transformer.

背景技术 Background technique

传统的电流互感器极性测试通过一块干电池,外接试验线接至电流互感器一次侧,二次侧接指针表,手动的点击电池正负极来实现极性测试。该种试验方法接线繁琐无序,工作现场较混乱,人员不集中。手动点击电池正负极,容易产生电火花,对试验人员造成伤害,减少电池的和指针表的使用寿命。而且一次只能校验一个回路,一次接线也只能分相测试,不符合现场标准化工作要求。 The traditional current transformer polarity test uses a dry battery, the external test line is connected to the primary side of the current transformer, the secondary side is connected to the pointer meter, and the polarity test is realized by manually clicking the positive and negative poles of the battery. The wiring of this test method is cumbersome and disorderly, the work site is chaotic, and the personnel are not concentrated. Manually click the positive and negative poles of the battery, which is easy to generate electric sparks, which will cause harm to the test personnel and reduce the service life of the battery and the pointer watch. Moreover, only one loop can be verified at a time, and one wiring can only be tested separately, which does not meet the requirements of on-site standardized work.

实用新型内容 Utility model content

本实用新型的目的就在于提供一种电流互感器极性测试箱,其可实现三相同时测试,通过调节可调电阻而防止损坏电流互感器极性测试专用指针表,通过试验按钮来操作电流瞬间通断,现场无需携带试验线、材料、仪器等设备,集成度高,可通过专用绝缘杆接至电流互感器一次侧。电池可充电,坚固美观,操作简便,换相工作可在试验箱处即可完成。 The purpose of this utility model is to provide a current transformer polarity test box, which can realize simultaneous testing of three phases, prevent damage to the special pointer meter for current transformer polarity testing by adjusting the adjustable resistance, and operate the current transformer through the test button Instant on and off, no need to carry test lines, materials, instruments and other equipment on site, with high integration, it can be connected to the primary side of the current transformer through a special insulating rod. The battery is rechargeable, sturdy and beautiful, easy to operate, and the phase change can be completed at the test box.

本实用新型的技术方案为:本实用新型包括一个箱体,在箱体上装配有一排二次接线端子,在一排二次接线端子下设有与二次接线端子对应连接的一排极性测试专用指针表,在一排极性测试专用指针表下设置有与极性测试专用指针表对应连接的可调电阻,在箱体上设置有A、B、C三相一次接线端子,在A、B、C三相一次接线端子下设有对应A、B、C三相一次接线端子的A、B、C三相相别切断开关,在A、B、C三相相别切断开关下设有试验按钮,在箱体内设置有A、B、C三相一次接线端子、A、B、C三相相别切断开关以及试验按钮配套的电源。 The technical scheme of the utility model is: the utility model comprises a box body, a row of secondary connecting terminals is assembled on the box body, and a row of polarity terminals correspondingly connected with the secondary connecting terminals is arranged under the row of secondary connecting terminals. Special pointer meter for testing, under a row of special pointer meters for polarity test, there is an adjustable resistance correspondingly connected to the special pointer meter for polarity test, and three-phase primary terminals of A, B, and C are arranged on the box body, and in A , B, C three-phase primary connection terminals are equipped with A, B, C three-phase phase-specific cut-off switches corresponding to A, B, C three-phase primary connection terminals, and A, B, C three-phase phase-specific cut-off switches are set There is a test button, and the box is equipped with A, B, C three-phase primary terminals, A, B, C three-phase phase cut-off switches and a power supply for the test button.

本实用新型可在箱体上设置用来放置接线的接线槽。所述电源为可充电设备,并外接有用于外接电源的外接插头。 In the utility model, a wiring slot for placing wiring can be arranged on the box body. The power supply is a rechargeable device, and is externally connected with an external plug for external power supply.

本电流互感器极性测试箱可实现A、B、C三相同时测试,通过调节可调电阻防止电流过大而损坏电流互感器极性测试专用指针表。一次接线端子通过引线接至电流互感器一次侧,二次接线端子通过引线接至电流互感器二次线圈,通过试验按钮来操作电流瞬间通断,以指针表正反起来验证电流互感器二次接线的极性正确性。 The current transformer polarity test box can realize simultaneous testing of A, B, and C three phases, and prevent the special pointer meter of current transformer polarity test from being damaged by excessive current by adjusting the adjustable resistance. The primary terminal is connected to the primary side of the current transformer through the lead wire, and the secondary terminal is connected to the secondary coil of the current transformer through the lead wire. The current is momentarily switched on and off through the test button, and the current transformer secondary is verified by the positive and negative of the pointer meter. Correct polarity of wiring.

本实用新型的有益效果为:本实用新型能够实现三相同时测试,通过调节可调电阻而防止损坏电流互感器极性测试专用指针表,通过试验按钮来操作电流瞬间通断,现场无需携带试验线、材料、仪器等设备,集成度高,可通过专用绝缘杆接至电流互感器一次侧。电池可充电,坚固美观,操作简便,换相工作可在试验箱处即可完成。 The beneficial effects of the utility model are: the utility model can realize simultaneous testing of three phases, prevent damage to the special pointer meter for polarity testing of the current transformer by adjusting the adjustable resistance, operate the current on and off instantaneously through the test button, and do not need to carry the test on site Wires, materials, instruments and other equipment are highly integrated and can be connected to the primary side of the current transformer through a special insulating rod. The battery is rechargeable, sturdy and beautiful, easy to operate, and the phase change can be completed at the test box.

附图说明 Description of drawings

图1为本实用新型实施例所述电流互感器极性测试箱正面图; Fig. 1 is the front view of the current transformer polarity test box described in the embodiment of the present invention;

图2为本实用新型实施例所述电流互感器极性测试箱背面接线示意图; Fig. 2 is a schematic diagram of the wiring on the back of the polarity test box of the current transformer described in the embodiment of the present invention;

图3为本实用新型实施例所述电流互感器极性测试箱现场使用接线示意图。 Fig. 3 is a schematic diagram of on-site wiring of the current transformer polarity test box described in the embodiment of the present invention.

图中1试验线槽,2二次接线端子,3一次接线端子,4极性测试专用指针表,5可调电阻,6相别切断开关,7为试验按钮,8为电源,9为外接插头。 In the figure, 1 is the test wire slot, 2 is the secondary terminal, 3 is the primary terminal, 4 is the special pointer meter for polarity test, 5 is the adjustable resistance, 6 is the cut-off switch for each phase, 7 is the test button, 8 is the power supply, and 9 is the external plug .

具体实施方式 Detailed ways

如附图1、2所示本实用新型实施例包括一个箱体10,在箱体10上装配有一排二次接线端子2,在一排二次接线端子2下设有与二次接线端子对应连接的一排极性测试专用指针表4,在一排极性测试专用指针表4下设置有与极性测试专用指针表对应连接的可调电阻5,在箱体上设置有A、B、C三相一次接线端子3,在A、B、C三相一次接线端子3下设有对应A、B、C三相一次接线端子的A、B、C三相相别切断开关6,在A、B、C三相相别切断开关下设有试验按钮7,在箱体内设置有A、B、C三相一次接线端子、A、B、C三相相别切断开关以及试验按钮配套的电源8,本实施例中电源8为充电电池,其配接有外接电源的外接插头9。在箱体正面前部上设置有用来放置接线的接线槽。本电流互感器极性测试箱可实现A、B、C三相同时测试,通过调节可调电阻防止电流过大而损坏电流互感器极性测试专用指针表。标号3通过引线接至电流互感器一次侧,标号2通过引线接至电流互感器二次线圈,通过标号7试验按钮来操作电流瞬间通断,以指针表正反起来验证电流互感器二次接线的极性正确性。 As shown in the accompanying drawings 1 and 2, the utility model embodiment includes a box body 10, on which a row of secondary connection terminals 2 is assembled, and a row of secondary connection terminals 2 is provided with a box corresponding to the secondary connection terminal. A row of special pointer meters 4 for polarity testing is connected, and an adjustable resistor 5 correspondingly connected to the special pointer meter for polarity testing is arranged under the row of special pointer meters 4 for polarity testing, and A, B, C three-phase primary connection terminal 3, under the A, B, C three-phase primary connection terminal 3 is provided with A, B, C three-phase phase cut-off switch 6 corresponding to A, B, C three-phase primary connection terminal, in A There is a test button 7 under the three-phase cut-off switches of , B, and C, and the three-phase primary terminals of A, B, and C, the three-phase cut-off switches of A, B, and C, and the supporting power supply for the test buttons are arranged in the box. 8. In this embodiment, the power source 8 is a rechargeable battery, which is connected with an external plug 9 for an external power source. A wiring groove for placing wiring is arranged on the front front of the box body. The current transformer polarity test box can realize simultaneous testing of A, B, and C three phases, and prevent the special pointer meter of current transformer polarity test from being damaged by excessive current by adjusting the adjustable resistance. Label 3 is connected to the primary side of the current transformer through the lead wire, label 2 is connected to the secondary coil of the current transformer through the lead wire, and the current switch is operated by the test button of label 7, and the secondary wiring of the current transformer is verified by the positive and negative of the pointer meter polarity correctness.

如图3所示在现场使用时,通过一次接线端子3与电流互感器一次侧连接,对应相别如图3所示A相,B相,C相。电流互感器二次接线侧接至二次端子上2,对应相别如图所示。相别切断开关6是切断电池8与一次接线的。如切断开关打到导通档,A、B、C三相分别是电池正负极相接,通过试验按钮7来实现三相同时极性测试的功能。  电流互感器二次侧的接线接至新型电流互感器极性测试箱的二次端子上2,二次端子2通过其内部接线与可调电阻5和专用指针表4相互连接。在试验按钮7通断过程中,指针表4会正起或反起,从而实现电流互感器的极性测试。通过调节可调电阻5来控制瞬间电流,防止电流过大而烧坏指针表。 When used in the field as shown in Figure 3, it is connected to the primary side of the current transformer through the primary terminal 3, and the corresponding phases are A phase, B phase, and C phase as shown in Figure 3 . The secondary wiring side of the current transformer is connected to the secondary terminal 2, and the corresponding phases are shown in the figure. The phase cut-off switch 6 is to cut off the battery 8 and the primary wiring. If the cut-off switch is turned on, the three phases A, B, and C are respectively connected to the positive and negative poles of the battery, and the test button 7 is used to realize the function of testing the polarity of the three phases at the same time. The wiring on the secondary side of the current transformer is connected to the secondary terminal 2 of the new current transformer polarity test box, and the secondary terminal 2 is connected to the adjustable resistor 5 and the special pointer meter 4 through its internal wiring. During the on-off process of the test button 7, the pointer meter 4 will be turned up or down, so as to realize the polarity test of the current transformer. The instantaneous current is controlled by adjusting the adjustable resistor 5 to prevent the pointer meter from being burnt due to excessive current.

Claims (3)

1. current transformer polarity test case; It is characterized in that: comprise a casing; On casing, be equipped with row's secondary connection terminal; Have the corresponding row's polarity test dedicated pointer table that connects at row's secondary connection terminal with the secondary connection terminal; Be arranged with the adjustable resistance with the corresponding connection of polarity test dedicated pointer table at row's polarity test dedicated pointer table, casing is provided with A, B, C three-phase primary connection terminal, has the separate cut-out switch of A, B, C three-phase of corresponding A, B, C three-phase primary connection terminal at A, B, C three-phase primary connection terminal; Have test button at A, B, the separate cut-out switch of C three-phase, in casing, be provided with A, B, C three-phase primary connection terminal, A, B, the separate cut-out switch of C three-phase and the supporting power supply of test button.
2. a kind of current transformer polarity test case according to claim 1 is characterized in that: on casing, be provided with and be used for placing the connecting groove of wiring.
3. a kind of current transformer polarity test case according to claim 1, it is characterized in that: said power supply is a rechargeable devices, and is connected to the external plug that is used for external power supply.
CN 201120222002 2011-06-28 2011-06-28 Current transformer polarity testing box Expired - Fee Related CN202119860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120222002 CN202119860U (en) 2011-06-28 2011-06-28 Current transformer polarity testing box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120222002 CN202119860U (en) 2011-06-28 2011-06-28 Current transformer polarity testing box

Publications (1)

Publication Number Publication Date
CN202119860U true CN202119860U (en) 2012-01-18

Family

ID=45460914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120222002 Expired - Fee Related CN202119860U (en) 2011-06-28 2011-06-28 Current transformer polarity testing box

Country Status (1)

Country Link
CN (1) CN202119860U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103884958A (en) * 2014-04-16 2014-06-25 国家电网公司 A current transformer polarity tester
CN104502792A (en) * 2014-12-11 2015-04-08 国家电网公司 Polarity tester for current transformer
CN104698228A (en) * 2015-03-17 2015-06-10 杨军峰 Wiring terminal of escalator comprehensive detector
CN105044547A (en) * 2015-07-31 2015-11-11 国网山东沂源县供电公司 Current transformer polarity tester
CN105527538A (en) * 2014-09-30 2016-04-27 国家电网公司 Polarity test device of current transformer
CN105929352A (en) * 2016-05-13 2016-09-07 国网山东省电力公司枣庄供电公司 Combined-type current transformer testing device
CN106124922A (en) * 2016-06-07 2016-11-16 国网山东省电力公司经济技术研究院 A kind of three-phase adjustable polarity test table
CN106680645A (en) * 2015-11-10 2017-05-17 国网辽宁省电力有限公司本溪供电公司 Current transformer polarity test device
CN115389984A (en) * 2022-08-15 2022-11-25 国网天津市电力公司 Mutual inductor polarity identification device and identification method based on non-oscillation over-damping characteristic

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103884958A (en) * 2014-04-16 2014-06-25 国家电网公司 A current transformer polarity tester
CN105527538A (en) * 2014-09-30 2016-04-27 国家电网公司 Polarity test device of current transformer
CN104502792A (en) * 2014-12-11 2015-04-08 国家电网公司 Polarity tester for current transformer
CN104698228A (en) * 2015-03-17 2015-06-10 杨军峰 Wiring terminal of escalator comprehensive detector
CN104698228B (en) * 2015-03-17 2017-11-14 邳州高新区新能源技术研究院有限公司 Escalator comprehensive detector binding post
CN105044547A (en) * 2015-07-31 2015-11-11 国网山东沂源县供电公司 Current transformer polarity tester
CN106680645A (en) * 2015-11-10 2017-05-17 国网辽宁省电力有限公司本溪供电公司 Current transformer polarity test device
CN105929352A (en) * 2016-05-13 2016-09-07 国网山东省电力公司枣庄供电公司 Combined-type current transformer testing device
CN106124922A (en) * 2016-06-07 2016-11-16 国网山东省电力公司经济技术研究院 A kind of three-phase adjustable polarity test table
CN115389984A (en) * 2022-08-15 2022-11-25 国网天津市电力公司 Mutual inductor polarity identification device and identification method based on non-oscillation over-damping characteristic

Similar Documents

Publication Publication Date Title
CN202119860U (en) Current transformer polarity testing box
CN203133226U (en) Polarity testing instrument for current transformer
CN204731360U (en) A kind of current transformer polarity rapid verification instrument
CN103326311B (en) Portable DC monitoring and protecting device
CN202649451U (en) Portable current transformer polarity calibration instrument
CN204241579U (en) Portable type current transformer on-site calibrator
CN202903927U (en) Complete-set comprehensive test bench
CN206208991U (en) A kind of direct-current resistance tester for transformer
CN203798953U (en) Temperature controller contact on-off tester
CN204595042U (en) A kind of three-phase electric energy metering device wire locating clip
CN203117360U (en) Current transformer polar tester
CN204028239U (en) A kind of multichannel distribute-electricity transformer district outlet line loss detector
CN203909209U (en) High-low voltage current voltage transformer polarity tester
CN204228882U (en) A kind of winding polarity test checking apparatus of electric power mutual-inductor
CN203422468U (en) Electric energy meter maintenance tool
CN203398828U (en) Timing charging case
CN204256100U (en) Instrument for testing polarity of current transformer
CN107741551A (en) 110kV polarity testing device of current transformer
CN205067660U (en) Modular appearance is put to current transformer polarity point
CN205091394U (en) Portable electrically conductive shoes test device
CN205720514U (en) Minitype CT polarity tester
CN203745541U (en) Power line direct current phase detecting device
CN204989306U (en) Three -phase equilibrium automatic regulating apparatus
CN103680268A (en) Research experimental box of volt-ampere characteristics of linear resistance and nonlinear resistance
CN202503202U (en) Debugging apparatus for relay protection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: SHIJIAZHUANG POWER SUPPLY COMPANY

Effective date: 20130410

Owner name: HEBEI ELECTRIC POWER CORPORATION SHIJIAZHUANG POWE

Effective date: 20130410

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 050091 SHIJIAZHUANG, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130410

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Hebei Electric Power Corporation

Patentee after: Shijiazhuang Power Supply Co.,Ltd.

Address before: 050091 Shijiazhuang power supply company, Hebei, Shijiazhuang Province

Patentee before: Shijiazhuang Power Supply Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120118