CN202108051U - Pile clamp for pile hitting and pulling equipment - Google Patents

Pile clamp for pile hitting and pulling equipment Download PDF

Info

Publication number
CN202108051U
CN202108051U CN2011201416868U CN201120141686U CN202108051U CN 202108051 U CN202108051 U CN 202108051U CN 2011201416868 U CN2011201416868 U CN 2011201416868U CN 201120141686 U CN201120141686 U CN 201120141686U CN 202108051 U CN202108051 U CN 202108051U
Authority
CN
China
Prior art keywords
pile
bar
projection
back segment
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201416868U
Other languages
Chinese (zh)
Inventor
曹斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tai'an Hengda Machinery Co., Ltd.
Original Assignee
曹斌
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 曹斌 filed Critical 曹斌
Priority to CN2011201416868U priority Critical patent/CN202108051U/en
Application granted granted Critical
Publication of CN202108051U publication Critical patent/CN202108051U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a pile clamp used for pile hitting and pulling equipment such as a vibration pile hammer or an impact pile hammer and the like. The pile clamp comprises an oil cylinder body, a piston with a sealing piece, a guide sleeve, a piston rod and a clamp seat, wherein the clamp seat is a cylindrical piece with an opening at the lower part, an installation hole is arranged at one side of the clamp seat, the oil cylinder body is arranged in the installation hole by the guide sleeve, the piston is arranged in the oil cylinder body and is connected with the piston rod, the piston rod extends out from the interior of the guide sleeve and consists of a front-section rod and a rear-section rod, the front-section rod is connected with the rear-section rod by a connector, and a gap exists at the connecting part between the front-section rod and the rear-section rod. The pile clamp has the advantages that the structure is reasonable, the abrasion of a sealing piece can be reduced remarkably, and the service life of an oil cylinder can be prolonged.

Description

A kind of pile holder tool of beating pile pulling equipment
Technical field
The utility model relates to a kind of pile holder tool that vibrohammer or impact pile monkey etc. are beaten pile pulling equipment that is used for.
Background technology
The structure of the pile holder tool oil cylinder that present domestic pile monkey uses is with common oil cylinder, and piston rod is a monolithic.The major defect of such pattern is that the vertical force when playing pile pulling acts directly on the piston rod, and what piston rod was frequent vibrates because of stressed, and the sealing part abrasion of oil cylinder is very fast, and phenomenons such as leakage of oil just can appear in oil cylinder behind the sealing part abrasion, reduce the application life of oil cylinder; In addition, frequent vibration also can the time cylinder body, fairlead, piston rod be prone to pulled, thereby influenced the operate as normal of pile monkey.
Summary of the invention
The utility model provides a kind of rational in infrastructure in order to overcome above-mentioned defective, can significantly reduce sealing part abrasion, prolongs the pile holder tool of the pile pulling equipment of beating in oil cylinder life-span.
The technical scheme that the utility model adopts is: a kind of pile holder tool of beating pile pulling equipment, comprise piston, fairlead, piston rod and the clamping fixture seat of cylinder body, band seal, and described clamping fixture seat is the columnar member of bottom band opening; Side at clamping fixture seat is provided with installing hole; Fairlead is installed in the installing hole, and cylinder body is connected and is installed in the outside of installing hole with fairlead, and piston is arranged in the cylinder body; Piston is connected with piston rod; Piston rod stretches out from fairlead inside, and described piston rod is made up of leading portion bar and back segment bar, and the leading portion bar is connected with the back segment bar through connector; Seal is arranged between back segment bar and the fairlead, and the junction of leading portion bar and back segment bar is provided with gap .
Described leading portion rod rear end is provided with groove, and the front end of back segment bar is provided with and the corresponding projection of said groove, and the projection of back segment bar extend in the groove of leading portion bar, and projection is connected through bearing pin with groove, is provided with the gap between projection and the groove.
Described leading portion rod rear end is provided with projection, and the front end of back segment bar is provided with and said projection corresponding grooves, and the projection of leading portion bar extend in the groove of back segment bar, is connected through bearing pin between projection and the groove, is provided with the gap between projection and the groove.
Because piston rod is arranged to the leading portion bar to the utility model and back segment bar two parts are formed; The leading portion bar is connected through connector with the back segment bar, and is provided with the gap at leading portion bar and back segment bar junction, and pile monkey is being beaten or during pile pulling; The power of vertical direction is cushioned by gap between the two when leading portion bar and back segment bar greatly; The back segment bar that is piston rod is unsteady with respect to the leading portion bar, and the back segment bar does not directly bear vertical force, has reduced frequent vibration.The seal that is provided with on the back segment bar has reduced the degree of wear to a great extent, has improved application lifes such as cylinder body, fairlead.
Description of drawings
Fig. 1 is the sketch map of the utility model.
The specific embodiment
Combine accompanying drawing that the utility model is further described, Fig. 1 is a kind of embodiment of the utility model at present, comprises a kind of pile holder tool of beating pile pulling equipment; Comprise piston, fairlead 16, piston rod and the clamping fixture seat 11 of cylinder body 12, band seal 20, described clamping fixture seat 11 is the columnar member of bottom band opening, is provided with installing hole in a side of clamping fixture seat 11; Fairlead 16 is installed in the installing hole; Cylinder body 12 and fairlead 16 are connected and are installed in the outside of installing hole, and piston is arranged in the cylinder body 12, and piston is connected with piston rod; Piston rod stretches out from fairlead 16 inside, and its front end is used for the folder stake.Described piston rod is made up of leading portion bar 18 and back segment bar 15; Leading portion bar 18 is connected with back segment bar 15 through connector; Seal 20 is arranged between back segment bar 15 and the fairlead 16, and the junction of leading portion bar 18 and back segment bar 15 is provided with gap .
The rear end of leading portion bar 18 is provided with groove in the present embodiment; The front end of back segment bar 15 is provided with and the corresponding projection of said groove; The projection of back segment bar 15 extend in the groove of leading portion bar 18; Be provided with the gap between the front end of projection and the groove, projection is connected through vertically disposed bearing pin with groove.
The leading portion bar 18 and the back segment bar 15 of the utility model also can oppositely assemble with the foregoing description; Promptly be provided with projection in leading portion bar 18 rear ends; The front end of back segment bar 15 is provided with and said projection corresponding grooves; The projection of leading portion bar 18 extend in the groove of back segment bar 15, is provided with the gap between the front end of projection and the groove, is connected through vertically disposed bearing pin between projection and the groove.
The utlity model has rational in infrastructurely, can significantly reduce sealing part abrasion, prolong the characteristics in oil cylinder life-span.

Claims (3)

1. pile holder tool of beating pile pulling equipment comprises piston, fairlead, piston rod and the clamping fixture seat of cylinder body, band seal, and described clamping fixture seat is the columnar member of bottom band opening; Side at clamping fixture seat is provided with installing hole; Fairlead is installed in the installing hole, and cylinder body is connected and is installed in the outside of installing hole with fairlead, and piston is arranged in the cylinder body; Piston is connected with piston rod; Piston rod stretches out from fairlead inside, it is characterized in that: described piston rod is made up of leading portion bar and back segment bar, and the leading portion bar is connected with the back segment bar through connector; Seal is arranged between back segment bar and the fairlead, and the junction of leading portion bar and back segment bar is provided with gap .
2. the pile holder tool of beating pile pulling equipment according to claim 1; It is characterized in that: described leading portion rod rear end is provided with groove; The front end of back segment bar is provided with and the corresponding projection of said groove; The projection of back segment bar extend in the groove of leading portion bar, and projection is connected through bearing pin with groove, is provided with the gap between projection and the groove.
3. the pile holder tool of beating pile pulling equipment according to claim 1; It is characterized in that: described leading portion rod rear end is provided with projection; The front end of back segment bar is provided with and said projection corresponding grooves; The projection of leading portion bar extend in the groove of back segment bar, is connected through bearing pin between projection and the groove, is provided with the gap between projection and the groove.
CN2011201416868U 2011-05-06 2011-05-06 Pile clamp for pile hitting and pulling equipment Expired - Lifetime CN202108051U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201416868U CN202108051U (en) 2011-05-06 2011-05-06 Pile clamp for pile hitting and pulling equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201416868U CN202108051U (en) 2011-05-06 2011-05-06 Pile clamp for pile hitting and pulling equipment

Publications (1)

Publication Number Publication Date
CN202108051U true CN202108051U (en) 2012-01-11

Family

ID=45433489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201416868U Expired - Lifetime CN202108051U (en) 2011-05-06 2011-05-06 Pile clamp for pile hitting and pulling equipment

Country Status (1)

Country Link
CN (1) CN202108051U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603354A (en) * 2013-11-18 2014-02-26 天津瑞德海洋石油工程有限公司 Hydraulic eccentric pickaxe
CN104790396A (en) * 2015-04-15 2015-07-22 大连大金马基础建设有限公司 Movable plate type pile holder
CN105951828A (en) * 2016-06-23 2016-09-21 广东力源液压机械有限公司 Pile gripper assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103603354A (en) * 2013-11-18 2014-02-26 天津瑞德海洋石油工程有限公司 Hydraulic eccentric pickaxe
CN104790396A (en) * 2015-04-15 2015-07-22 大连大金马基础建设有限公司 Movable plate type pile holder
CN105951828A (en) * 2016-06-23 2016-09-21 广东力源液压机械有限公司 Pile gripper assembly
CN105951828B (en) * 2016-06-23 2017-12-26 广东力源液压机械有限公司 A kind of pile chuck assembly

Similar Documents

Publication Publication Date Title
CN202108051U (en) Pile clamp for pile hitting and pulling equipment
CN204098422U (en) A kind of mounting mounting structure of stone material
CN101975642B (en) Double-station cast tube airtight machine
CN210509797U (en) Oil cylinder for pile machine
CN102852899A (en) Vertical oil cylinder
CN202741319U (en) Pneumatic reciprocating vibrator
CN202195170U (en) Automobile pipeline supercharging fixing mechanism
CN202195171U (en) High strength pipe hoop for suspension system
CN203374557U (en) Rapid oil hydraulic cylinder
CN203335522U (en) Stainless steel minitype cylinder
CN202718967U (en) Double buffering self-adjustment positioning hydraulic oil cylinder
CN203189867U (en) Valve rod
CN202901120U (en) Double-oil-taking mechanism of brake master cylinder
CN201862700U (en) Bilateral expansion device for pipe member
CN202660070U (en) Wired laterally-inclined cable guiding device for direction well
CN203924062U (en) Impact stake fixture
CN202374080U (en) Support used for ground mounting of motor
CN204300217U (en) A kind of follow-on automobile absorber
CN203655909U (en) Upper bearing seat component of high speed power main shaft
CN202023571U (en) Supporting-arm propulsion cylinder for machine-mounted anchor rod machine
CN201166257Y (en) Guide wheel of rubber curtain seal dry type coal gas cabinet leveling device
CN202716219U (en) Jig for oil seal assembly
CN201896582U (en) Bit-free tail pipe of drill bit arranged on high-air-pressure downhole impactor with valve
CN104120719B (en) Impact stake fixture
CN102383739A (en) Large-caliber spiral drill pipe for deep hole drill

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180709

Address after: 271000 steel market in Daiyue District, Tai'an, Shandong

Patentee after: Tai'an Hengda Machinery Co., Ltd.

Address before: 271000 Jinshan Road, Tai'an, Shandong Province, No. 30

Patentee before: Cao Bin

CX01 Expiry of patent term

Granted publication date: 20120111

CX01 Expiry of patent term