CN202102573U - Disaster monitoring and early warning system - Google Patents

Disaster monitoring and early warning system Download PDF

Info

Publication number
CN202102573U
CN202102573U CN2011202173083U CN201120217308U CN202102573U CN 202102573 U CN202102573 U CN 202102573U CN 2011202173083 U CN2011202173083 U CN 2011202173083U CN 201120217308 U CN201120217308 U CN 201120217308U CN 202102573 U CN202102573 U CN 202102573U
Authority
CN
China
Prior art keywords
data
module
electrically connected
submodule
early warning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202173083U
Other languages
Chinese (zh)
Inventor
李胜
郑强
张宗旗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUIZHOU EAST CENTURY TECHNOLOGY CO LTD
Original Assignee
GUIZHOU DONGFANG SHIJI SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUIZHOU DONGFANG SHIJI SCIENCE AND TECHNOLOGY Co Ltd filed Critical GUIZHOU DONGFANG SHIJI SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN2011202173083U priority Critical patent/CN202102573U/en
Application granted granted Critical
Publication of CN202102573U publication Critical patent/CN202102573U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a disaster monitoring and early warning system which comprises a sensor module, a data acquisition module, a data processing module, a database module, a data dissemination module, a data transceiving terminal module and other servers. The disaster monitoring and early warning system solves the problems of simplex function, incompatibility, overlapping investment and waste of various precious resources in various monitoring and early warning systems and provides a point-to-point personalized information distribution mode. The disaster monitoring and early warning system also solves the problem of former alarm information distribution regardless of grades and ages and further solves the problem that an end user cannot send out the rescue information accurately, such as the geographical location after receiving the early warning information at present.

Description

A kind of disaster monitoring and early-warning system
Technical field
The utility model relates to automatic monitoring and warning field, especially handles to the monitoring and warning of various disasteies.
Background technology
Disaster mainly contains meteorological disaster, earthquake disaster, geologic hazard, Oceanic disasters, biological epidemics and Forset and glassland fire etc.; Present various disaster monitoring and early-warning system major part is all independent mutually; Incompatible mutually, be not incorporated into a total system platform, be unfavorable for the integration and the issue of early warning information; And cause overlapping investment, waste various precious resources; It is popular issue that current various early warning information all adopts broadcast type; Disaster is divided flood, geology, fire and man-made disaster etc., the early warning information that the user need not have nothing to do with him, and the broadcast message of current employing sends no matter whether the user needs; All send early warning information; No matter the other side's age, post etc. can both receive, cause public's fear, confusion etc. easily, be unfavorable for disaster prevention and control; Adopt at present the broadcast message issue also to have in real time shortcomings such as feedback information; Such as: after some people receives early warning information; Should withdraw immediately, but owing to handicapped or other odjective causes need rescue, can not feed back rescue information immediately can only be through situation such as the residing position of instrument word picture, environment such as mobile phone or phones; Wait for rescue, cause problems such as rescue delay easily.
Summary of the invention
The technical matters that the utility model will solve: provide a kind of disaster monitoring and early-warning system to solve:
1) problems such as the wasting of resources independently brought separately of current various monitor and early warning system;
2) the early warning information broadcast type issue that exists at present, problem that can not personalized point-to-point issue;
3) after the terminal user receives early warning information at present, can not feed back the problem of assistance messages such as accurate geographic location when needing rescue immediately.
The utility model technical scheme:
A kind of disaster monitoring and early-warning system comprises:
Sensor assembly is electrically connected with data acquisition module;
Data acquisition module is electrically connected with data processing module;
Data processing module is electrically connected with DBM;
DBM is electrically connected with the data issuing module;
The data issuing module is electrically connected with the data transceiver terminal module;
The data transceiver terminal module.
The data transceiver terminal module is electrically connected with data acquisition module.
Data acquisition module is electrically connected with other server.
Sensor assembly comprises liquid level sensor, flow sensor, pressure transducer, temperature sensor, data transceiver terminal module, other can obtain the website and the server of data message.
Data processing module comprises:
The statistical study submodule is electrically connected with data acquisition module;
The GIS submodule is electrically connected with the forecast analysis submodule;
The GPS submodule is electrically connected with the forecast analysis submodule;
The forecast analysis submodule is electrically connected with statistical study submodule and DBM.
The data issuing module comprises:
Early warning response submodule is electrically connected with DBM;
The user data submodule is electrically connected with DBM;
The outer bevel module is electrically connected with DBM;
The inquiry submodule is electrically connected with DBM.
The beneficial effect of the utility model:
Utilize website and server that various types of sensors such as liquid level sensor, flow sensor, pressure transducer, temperature sensor, data transceiver terminal module and other can obtain data message etc. can integrated informations such as various disasters such as flood, geology, fire and man-made disaster be delivered to data acquisition module; Solved current various monitor and alarm system function singleness problem; Compatible current various monitor and early warning systems; Be integrated into a total system platform; Solved between each system incompatiblely mutually, problems such as various precious resources are wasted in overlapping investment.
Utilize data acquisition module, numeral such as various data messages that the pick-up transducers module is delivered to such as temperature, pressure, flow or analog quantity information gather classification, and deliver to data processing module and carry out data processing; Simultaneously, automatic and other servers networkings (like the server of departments such as hospital, rescue, fire-fighting) of acquisition subsystem are delivered to other servers automatically with relevant information, have realized and other associated server networking, realize information unified platform sharing functionality.
Utilize function of statistic analysis, forecast analysis function, GIS map tool and the gps satellite position system function of data processing module; Handle through aggregation of data, statistical study, forecast analysis, combination GIS submodule and GPS submodule carry out interpretation of result, draw information such as time, estimation range, disaster grade, carry out prediction.Contents such as prediction are delivered to DBM stores; Realize the real-time processing of field data information.
The data issuing module can provide point-to-point personalized service, but subregion, branch crowd issue when releasing news.As through range of receiving such as qualification crowd, ages; The early warning information broadcast type that has solved present existence is issued the variety of issue that is brought; Early warning information is only issued the people who wants; Can not produce junk information, can send out the information of demands of different according to the characteristics of different crowd, solved present monitoring and early warning can only broadcast type can not ptp services problem.
Utilize data transceiver terminal module such as mobile phone and computer etc.; Can receive the various early warning information that the data issuing module is sent out; Utilize manually-operated to can be used as sensor simultaneously field data is fed back to data acquisition module, rescue software on the transceiver terminal, the flip flop equipment of seeking survival of a versatility of design through being installed in; Can automatically the information of seeking survival such as the geographic position of asking the survivor to belong to, surrounding enviroment be fed back automatically and be sent to back-end server; By the rear end platform comprehensively ask the survivor personal information such as age, sex, whether medical history etc. is arranged, generate rescue party's case automatically and issue relevant rescue facility, be convenient to provide relief; Solved the open transmission of present warning message, in time feedback user rescue information etc. is to rescue problem such as make troubles.
Description of drawings:
Fig. 1 is the utility model functional block diagram;
Fig. 2 is the utility model data processing function module frame chart;
Fig. 3 is the utility model data issuing functional block diagram.
Embodiment:
Monitoring early-warning system comprises sensor assembly, data acquisition module, other server, data processing module, DBM, data issuing module and data transceiver terminal module etc.
Utilize sensor assembly, comprise that on-the-spot various sensor such as liquid level sensor, flow sensor, pressure transducer, temperature sensor, data transceiver terminal module and other can obtain website and server of data message etc.Sensor is installed in place that need to measure relevant information, such as will measure water level the time, liquid level sensor is installed in dam; When measuring temperature, temperature sensor is installed in the position that needs the key monitoring temperature; Sensor assembly mainly is responsible for detecting various site environment data messages, collecting various weathers, environmental data;
With these data messages, be connected communication through wireless GPRS between sensor assembly and the data acquisition system (DAS), the detected data message of sensor assembly is delivered to data acquisition module.
Utilize data acquisition module, be responsible for numeral such as various data messages that the pick-up transducers module delivers to such as temperature, pressure, flow or analog quantity information and gather classification, and deliver to data processing module and carry out data processing; Simultaneously, automatic and other servers networkings (like the server of departments such as hospital, rescue, fire-fighting) of acquisition subsystem are delivered to other servers automatically with relevant information; Be connected through lead between data acquisition module and the data handling system and carry out data communication.Data acquisition module can be made up of hardware such as industrial computer and servers.
Other servers: comprise relevant departments' data servers such as hospital, rescue, fire-fighting, the data message of acquisition subsystem is delivered to associated server simultaneously to make things convenient for data sharing, raises the efficiency.Carry out communication through wireless connections such as lead or GPRS between data acquisition module and other servers.
Utilize data processing module, comprise statistical study submodule, forecast analysis submodule, GIS submodule, GPS submodule; The statistical study submodule is responsible for accomplishing the statistics and the calculating of basic real time data, produces real-time early warning information; Predicting subsystem is predicted following disaster according to real-time and historical data; All relevant geographic elements of the integrated prewarning area of GIS submodule and attribute are that total system provides geographical information platform; The GPS submodule is accomplished the location of portable terminal, for system provides moving target relevant position system; Handle through aggregation of data, statistical study, forecast analysis, combination GIS submodule and GPS submodule carry out interpretation of result, draw information such as time, estimation range, disaster grade, carry out prediction.Contents such as prediction are delivered to DBM stores; LAN is connected and carries out data communication between data processing module and the DBM, because native system deal with data amount is big, so data processing module mainly is installed on the server.
Utilize the data issuing module, carry out the information issue according to the data processing module result, personalized point-to-point issue is carried out according to predefined scope in the scope of release, such as dividing the scope of release according to the age, divides scope of release etc. according to position; Disaster is divided flood, geology, fire and man-made disaster etc.; The early warning information that the user need not have nothing to do with him; For this reason can be automatically or customize the early warning content of his present needs according to prevailing circumstances; Early warning information is only issued the people who wants, can not produce junk information, can send out the information of demands of different according to the characteristics of different crowd; The data issuing module is connected through GPRS with the data transceiver terminal module carries out data communication.
The data issuing module comprises early warning response submodule, user data submodule, outer bevel module and inquiry submodule; Early warning response submodule real-time estimate and the development of tracking the condition of a disaster, and remind the terminal user to draw attention; The user data submodule is used for the process user personal information, realizes ptp services; The completion of outer bevel module is connected and information sharing with other emergency processing unit; The inquiry submodule provides inquiries such as emergency processing mechanism information, emergency management and rescue information, emergency routines inquiry, peripheral the condition of a disaster.
Receive the various information of issue subsystem issue through the data transceiver terminal module; And in difficulty or in emergency circumstances, the setting button on can trigger data transceiver terminal module, sending needs relief information, or it is coming to prenotice disaster; The data transceiver terminal module also can be used as the part of sensor assembly; Import various abnormal informations by the individual and send to data acquisition module; Such as some natural signs, current variation, geology variation etc.; Be beneficial to systematic analysis, judge the prediction disaster, the data transceiver terminal module comprises equipment such as mobile phone, various computer, phone; It and data acquisition module adopt the GPRS wireless connections to carry out data communication.
Disaster information divides different brackets, and when serious situation occurring, system watches with sound, vibration, the multiple mode force users of high light, and lifesaving method, evacuation route, rescue contact method etc. are provided.After disaster took place, the user can send through the data transceiver terminal module and comprise rescue informations such as phone, note, network, so that rescue in real time.
Through the utility model, can existing all kinds disaster relief prognoses system be incorporated into a platform, concentrate and gather, concentrate issue, can avoid the various wastings of resources.Adopt the data transceiver terminal module, realized the closed loop control on terminal and backstage, can implement convenient the rescue, improved take precautions against natural calamities, the efficient of the disaster relief.

Claims (2)

1. disaster monitoring and early-warning system comprises:
Sensor assembly is electrically connected with data acquisition module;
Data acquisition module is electrically connected with data processing module;
Data processing module is electrically connected with DBM;
DBM is electrically connected with the data issuing module;
The data issuing module is electrically connected with the data transceiver terminal module;
The data transceiver terminal module.
2. according to the said a kind of disaster monitoring and early-warning system of claim 1, it is characterized in that: the data transceiver terminal module is electrically connected with data acquisition module.
3. according to the said a kind of disaster monitoring and early-warning system of claim 1, it is characterized in that: data acquisition module is electrically connected with other server.
4. according to the said a kind of disaster monitoring and early-warning system of claim 1, it is characterized in that: sensor assembly comprises liquid level sensor, flow sensor, pressure transducer, temperature sensor, data transceiver terminal module, other can obtain the website and the server of data message.
5. according to the said a kind of disaster monitoring and early-warning system of claim 1, it is characterized in that: data processing module comprises:
The statistical study submodule is electrically connected with data acquisition module;
The GIS submodule is electrically connected with the forecast analysis submodule;
The GPS submodule is electrically connected with the forecast analysis submodule;
The forecast analysis submodule is electrically connected with statistical study submodule and DBM.
6. according to the said a kind of disaster monitoring and early-warning system of claim 1, it is characterized in that: the data issuing module comprises:
Early warning response submodule is electrically connected with DBM;
The user data submodule is electrically connected with DBM;
The outer bevel module is electrically connected with DBM;
The inquiry submodule is electrically connected with DBM.
CN2011202173083U 2011-06-24 2011-06-24 Disaster monitoring and early warning system Expired - Lifetime CN202102573U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202173083U CN202102573U (en) 2011-06-24 2011-06-24 Disaster monitoring and early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202173083U CN202102573U (en) 2011-06-24 2011-06-24 Disaster monitoring and early warning system

Publications (1)

Publication Number Publication Date
CN202102573U true CN202102573U (en) 2012-01-04

Family

ID=45388577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202173083U Expired - Lifetime CN202102573U (en) 2011-06-24 2011-06-24 Disaster monitoring and early warning system

Country Status (1)

Country Link
CN (1) CN202102573U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103985227A (en) * 2014-06-05 2014-08-13 重庆誉鸣科技有限公司 Mountain torrent disaster prewarning and prediction system
CN104881961A (en) * 2015-06-19 2015-09-02 陈毅然 Global earthquake geomagnetic anomaly big data monitoring and early warning system based on mobile Internet, and monitoring and early warning method
CN106408881A (en) * 2016-09-30 2017-02-15 防城港市水利水电勘测设计院 Flood prevention communication device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103985227A (en) * 2014-06-05 2014-08-13 重庆誉鸣科技有限公司 Mountain torrent disaster prewarning and prediction system
CN104881961A (en) * 2015-06-19 2015-09-02 陈毅然 Global earthquake geomagnetic anomaly big data monitoring and early warning system based on mobile Internet, and monitoring and early warning method
CN104881961B (en) * 2015-06-19 2017-07-28 陈毅然 Global earthquakes magnetic anomaly big data monitoring and warning system and monitoring and pre-alarming method based on mobile Internet
CN106408881A (en) * 2016-09-30 2017-02-15 防城港市水利水电勘测设计院 Flood prevention communication device

Similar Documents

Publication Publication Date Title
CN102289915A (en) Disaster monitoring and pre-warning system
EP2805316B1 (en) Emergency messaging system and method of responding to an emergency
US20230079231A1 (en) Response system with emergency response equipment locator
US10178537B2 (en) Emergency messaging system and method of responding to an emergency
US9743265B2 (en) System and method for providing individualized tsunami notifications with the aid of a digital computer
US20070273499A1 (en) Real-time multi-component web based travel safety system and method
RU2008115055A (en) METHOD AND SYSTEM FOR DETERMINING A GEOGRAPHIC LOCATION
US20140243036A1 (en) System and method for emergency response
CN101620649A (en) Real-time monitoring method for human health based on network communication
CN101972535A (en) Comprehensive fire control system and method for simulative neural network
CN201725034U (en) Gun position terminal, gun position system and gun with gun position terminal
WO2021083096A1 (en) System for positioning position of alarm-giving person for command center, and use method thereof
CN108593098A (en) A kind of noise detection system based on cloud computing
CN202102573U (en) Disaster monitoring and early warning system
CN105225423A (en) Calamity danger event method for early warning and calamity danger event early warning system
US9037108B1 (en) Emergency assistance for mobile communication device user
CN103454648A (en) Alarming rescuing system based on Beidou system and Android cell phone platform
CA2776802C (en) Human security and survival system
CN1947654A (en) Method for report of life-information, and device therefor
Osebor et al. Experimental simulation-based performance evaluation of an SMS-based emergency geolocation notification system
US20060270383A1 (en) Low bandwidth asynchronous remote-use data capture and telecommunications system and apparatus
CN105049285A (en) Monitoring system and monitoring method for modular data center refrigeration
CN105510944A (en) BeiDou positioning terminal information collector and system
CN201897865U (en) Wireless early warning system module capable of realizing early warning to natural disasters
JP2010087683A (en) Safety confirmation system and monitoring center apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIZHOU EAST CENTURY TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: GUIZHOU DONGFANG SHIJI SCIENCE AND TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: 550008 building, 5 building, Jinyang knowledge Industrial Park, hi tech Zone, Guiyang, Guizhou

Patentee after: GUIZHOU EAST CENTURY TECHNOLOGY Co.,Ltd.

Address before: 550002 Guizhou city of Guiyang province Baoshan kaini Road No. 64 building 7 floor

Patentee before: Guizhou East Century Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: Disaster monitoring and early warning system and method for establishing disaster monitoring and early warning system

Effective date of registration: 20150618

Granted publication date: 20120104

Pledgee: Bank of Guiyang Limited by Share Ltd. high tech branch

Pledgor: GUIZHOU EAST CENTURY TECHNOLOGY Co.,Ltd.

Registration number: 2015990000484

PLDC Enforcement, change and cancellation of contracts on pledge of patent right or utility model
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20120104

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230828

Granted publication date: 20120104

Pledgee: Bank of Guiyang Limited by Share Ltd. high tech branch

Pledgor: GUIZHOU EAST CENTURY TECHNOLOGY Co.,Ltd.

Registration number: 2015990000484