CN202102282U - Monitoring and controlling device for cooler of transformer - Google Patents

Monitoring and controlling device for cooler of transformer Download PDF

Info

Publication number
CN202102282U
CN202102282U CN201120002206XU CN201120002206U CN202102282U CN 202102282 U CN202102282 U CN 202102282U CN 201120002206X U CN201120002206X U CN 201120002206XU CN 201120002206 U CN201120002206 U CN 201120002206U CN 202102282 U CN202102282 U CN 202102282U
Authority
CN
China
Prior art keywords
transformer
monitoring
pce
processing
cooler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120002206XU
Other languages
Chinese (zh)
Inventor
陈安伟
朱松林
董国伦
张劲
何云良
乐全明
刘岩
刘黎
何文林
汪卫国
赵勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Co
Zhejiang Electric Power Test and Research Insititute
Jinhua Electric Power Bureau
Original Assignee
NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
Zhejiang Electric Power Co
Zhejiang Electric Power Test and Research Insititute
Jinhua Electric Power Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd, Zhejiang Electric Power Co, Zhejiang Electric Power Test and Research Insititute, Jinhua Electric Power Bureau filed Critical NINGBO LIGONG ONLINE MONITORING TECHNOLOGY Co Ltd
Priority to CN201120002206XU priority Critical patent/CN202102282U/en
Application granted granted Critical
Publication of CN202102282U publication Critical patent/CN202102282U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a monitoring and controlling device for a cooler of a transformer, which comprises a processing control unit and a measurement sensor. The processing control unit is connected with the measurement sensor by the aid of an RS 485 interface, the measurement sensor is connected with the cooler, and the processing control unit is in communication connection with a main intelligent electronic device for monitoring the transformer by the aid of a 100-megabit Ethernet. Start and stop of elements of a cooling system are controlled automatically by the aid of an embedded processor and a PLC (programmable logic controller). The processing control unit which adopts the redundancy design of automatic switching of double PLCs effectively solves the problem of system failure caused by faults or dead halt of the single PLC. The monitoring and controlling device can monitor running states of the cooler based on the IEC61850 protocol and set parameters thereof locally or by the aid of a network.

Description

Transformer cooler monitoring and control device
Technical field
The utility model relates to a kind of transformer cooler monitoring and control device.
Background technology
The automatic control of traditional high-power transformer cooling system is that the employing relay switch is main electrical control circuit, and cooling system is prone to frequent starting, and relay switch is prone to wear out, corrodes and breaks down, and can't be used for dispatching automation communication.Propelling along with State Grid Corporation of China's intelligent substation construction; Traditional transformer cooler monitoring and control device can not satisfy the objective requirement of intelligent substation management and development; Substitute present implementation with monitoring of intelligentized transformer cooler and control device, for the reliability service of transformer provides safety guarantee.
The utility model content
The utility model technical matters to be solved provides a kind of transformer cooler monitoring and control device; Overcome the easy frequent starting of cooling system in the prior art; Relay switch is prone to wear out, corrodes and breaks down, and can't satisfy the defective of intelligent substation management.
For solving the problems of the technologies described above; The utility model provides a kind of transformer cooler monitoring and control device, it is characterized in that, comprises processing and control element (PCE); Said processing and control element (PCE) connects sensor through the RS485 interface; Said sensor connects said refrigeratory and transformer, and said processing and control element (PCE) connects said refrigeratory through drive circuit unit, and said processing and control element (PCE) is connected communication through 100 m ethernet with transformer monitoring master intelligent electronic device.
Further, said processing and control element (PCE) also through the switching value signal wire, connects on-the-spot switching value signal transducer.
Further, said Ethernet is an optical networking, the optical fiber communication stipulations are IEC61850.
Most preferred, said processing and control element (PCE) is the redundancy structure of flush bonding processor and two PLC automatic switchover operations.
The utility model is gathered all cooling system signals of transformer; And they are monitored in real time; Be transformed to the digital quantity signal that PLC discerns through the oily gentle load current analog quantity that will gather, adopt the software programming of PLC steering logic, realize automatic control the cooling system element start and stop.Processing and control element (PCE) adopts the automatically switch Redundancy Design of operation of two PLC, the risk problem that the system that brings because of PLC fault or deadlock that has overcome effectively that the irredundant design of single PLC exists can't move.The utility model can local or through network realize based on the refrigeratory running state monitoring of IEC61850 stipulations with carry out the parameter setting.
Description of drawings
Further specify below in conjunction with accompanying drawing and embodiment technical scheme the utility model.
Fig. 1 is that the transformer cooler control device of the utility model is formed synoptic diagram.
Embodiment
The utility model device is mainly monitored fan and by parameters such as the electric current of Oil pump electrical machinery and driving power, top oil temperature, loads, and goes out the cooling effectiveness of winding focus and cooling system according to transformer thermal load model assessment.The hardware principle block diagram is as shown in Figure 1; Its core devices processing and control element (PCE) is selected the Power PC processor MPC8247 of dominant frequency 600MHz for use; Operation Linux embedded OS on it; Last 50 on-the-spot switching value inputs, 10 the switching value output ports of having of MPC8247, the fault of additional device, operating state signal are through these 50 on-the-spot switching value input port input MPC8247.Processing and control element (PCE) adopts the automatically switch Redundancy Design of operation of two PLC, the system's operation risk that brings because of single PLC fault or deadlock that has overcome that the irredundant design of single PLC exists.Processing and control element (PCE) connects the sensor or the instrument of refrigeratory on the spot through the RS485ModBus interface; Gather parameters such as transformer top oil temperature and load current; According to IEEE C57.91-1995/IEC354 guide rule calculating transformer hot spot temperature of winding, and coupling system software carries out data processing, and processing and control element (PCE) is also through the switching value signal wire; Connect on-the-spot switching value signal transducer, gather fault, the operating state signal of additional device.According to the state and the assessment result that monitor, the fan and the oil pump of cooling unit are controlled through the automatic or manual switch unit.The automatic or manual switch unit is the driving circuit of refrigeratory, has manual, automatic, long-range three kinds of methods of operation, can realize remote monitoring operation and failure message, carry out parameter setting and setting state on the spot and through network.The state estimation of cooling system with cooling effectiveness RTH (thermal resistance) as characteristic parameter.During normal condition, RTH is a constant, when RTH increases and surpass warning value, can judge that fault has taken place cooling system.
Processing and control element (PCE) inserts transformer station's process layer network, and carries out data encapsulation to the state and the data based IEC61850 stipulations of assessment result that monitor, communicates by letter with transformer monitoring master IED through 100,000,000 fiber optic Ethernets.Transformer monitoring master IED adopts IEC61850-8-1 (the operation power of band safety is selected control) stipulations to accomplish the Long-distance Control to device.
The interval time that processing and control element (PCE) can be provided with according to the user; Send a message to transformer monitoring master IED; Message format is " trouble location, fault mode (internal discharge type), degree of risk (representing with percentage), an equipment state ", and " degree of risk " every increase 5% increases sends message once.Real-time/historical data application system unified management that the message that transformer monitoring master IED receives is included the PI of Utilities Electric Co. in can be given full play to the efficient data of PI system and store and the complicated calculations advantage.
It should be noted last that; Above embodiment is only unrestricted in order to the technical scheme of explanation the utility model; Although with reference to preferred embodiment the utility model is specified, those of ordinary skill in the art should be appreciated that and can make amendment or be equal to replacement the technical scheme of the utility model; And not breaking away from the spirit and the scope of the utility model technical scheme, it all should be encompassed in the middle of the claim scope of the utility model.

Claims (4)

1. a transformer cooler is monitored and control device; It is characterized in that; Comprise processing and control element (PCE), said processing and control element (PCE) connects sensor through the RS485 interface, and said sensor connects said refrigeratory and transformer; Said processing and control element (PCE) connects said refrigeratory through driving circuit, and said processing and control element (PCE) is connected communication through 100 m ethernet with transformer monitoring master intelligent electronic device.
2. transformer cooler monitoring according to claim 1 and control device is characterized in that said processing and control element (PCE) also through the switching value signal wire, connects on-the-spot switching value signal transducer.
3. transformer cooler monitoring according to claim 1 and 2 and control device is characterized in that said Ethernet is an optical networking.
4. transformer cooler monitoring according to claim 3 and control device is characterized in that, said processing and control element (PCE) is the redundancy structure of flush bonding processor and two PLC automatic switchover operations.
CN201120002206XU 2011-01-06 2011-01-06 Monitoring and controlling device for cooler of transformer Expired - Fee Related CN202102282U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120002206XU CN202102282U (en) 2011-01-06 2011-01-06 Monitoring and controlling device for cooler of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120002206XU CN202102282U (en) 2011-01-06 2011-01-06 Monitoring and controlling device for cooler of transformer

Publications (1)

Publication Number Publication Date
CN202102282U true CN202102282U (en) 2012-01-04

Family

ID=45388286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120002206XU Expired - Fee Related CN202102282U (en) 2011-01-06 2011-01-06 Monitoring and controlling device for cooler of transformer

Country Status (1)

Country Link
CN (1) CN202102282U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592784A (en) * 2012-02-20 2012-07-18 四川电力科学研究院 Cooling control integrated access device based on of distributed network for intelligent substation
CN102722193A (en) * 2012-06-25 2012-10-10 甘景福 Method for slowing down aging of solid insulation of oil-paper insulating transformer
CN106527214A (en) * 2015-09-14 2017-03-22 四方特变电工智能电气有限公司 Dual-configuration method of intelligent electronic controller of transformer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102592784A (en) * 2012-02-20 2012-07-18 四川电力科学研究院 Cooling control integrated access device based on of distributed network for intelligent substation
CN102722193A (en) * 2012-06-25 2012-10-10 甘景福 Method for slowing down aging of solid insulation of oil-paper insulating transformer
CN102722193B (en) * 2012-06-25 2014-02-19 甘景福 Method for slowing down aging of solid insulation of oil-paper insulating transformer
CN106527214A (en) * 2015-09-14 2017-03-22 四方特变电工智能电气有限公司 Dual-configuration method of intelligent electronic controller of transformer
CN106527214B (en) * 2015-09-14 2019-02-01 四方特变电工智能电气有限公司 Intelligent transformer type electronic controller duplicate system retrofit method

Similar Documents

Publication Publication Date Title
CN202205070U (en) Intelligent transformer cooling control device
CN104682214A (en) Intelligent power supply control box
CN104991510A (en) One-in-service-one-standby water pump variable frequency electric control system and control method
CN201215632Y (en) Temperature control instrument for dry transformer
CN204028639U (en) A kind of coalcutter control system
CN202102282U (en) Monitoring and controlling device for cooler of transformer
CN105487006A (en) Power distribution switch machinery characteristic on-line monitoring system and monitoring method
CN101651366A (en) Network type electric black box
CN203733567U (en) Transformer air cooling control cabinet
CN101950169A (en) Pumping unit controller, control method and system
CN214151471U (en) Intelligent management and control system for ventilator
CN204302686U (en) Intelligent transformer type electronic controller
CN102570588A (en) Automatic power transfer switch controller and control method thereof
CN208937967U (en) A kind of novel main transformer cooling intelligent control system of hydroelectric station based on fault diagnosis
CN201576204U (en) Coal mine pump house drainage redundant controller based on industrial Ethernet ring network
CN204515467U (en) Powerhouse of hydropower station seepage sump drainage control system
CN101750985B (en) Remote temperature sensing and monitoring system and method for 0.4kV low voltage switch
CN110473724A (en) A kind of automatic three-phase control system of medium voltage electricity switch
CN205375224U (en) Dry -type transformer intelligence temperature controller based on CAN bus
CN105275632A (en) Unattended control system for oil rig power pack
CN204902129U (en) Data center cold source cooperative control system
CN211628062U (en) Remote switch device of urban rail train on-line detection power supply
CN104777745B (en) A kind of redundancy control circuit and redundancy control system
CN204790497U (en) It is equipped with pump variable frequency electrical system to use one
CN203350708U (en) High-voltage frequency converter "one-driving-two" control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120104

Termination date: 20160106