CN202094579U - Lead hanging point equipment used for steel pipe tower - Google Patents

Lead hanging point equipment used for steel pipe tower Download PDF

Info

Publication number
CN202094579U
CN202094579U CN 201020690341 CN201020690341U CN202094579U CN 202094579 U CN202094579 U CN 202094579U CN 201020690341 CN201020690341 CN 201020690341 CN 201020690341 U CN201020690341 U CN 201020690341U CN 202094579 U CN202094579 U CN 202094579U
Authority
CN
China
Prior art keywords
plate
ring flat
lead
lead hanging
cover plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201020690341
Other languages
Chinese (zh)
Inventor
李永双
夏波
施菁华
刘慎之
李龙
肖立群
陈治
王虎长
王勇
韩大刚
刘伟
马志坚
黄金龙
董建尧
包永忠
王学明
彭结兵
王启明
张宏志
陈冰野
袁青云
舒爱强
胡建民
李霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
China Power Engineering Consulting Group Corp
Original Assignee
State Grid Corp of China SGCC
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
North China Electric Power Design Institute of China Power Engineering Consulting Group Corp
China Power Engineering Consulting Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Northwest Electric Power Design Institute of China Power Engineering Consulting Group, Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group, China Power Engineering Consulting Group East China Electric Power Design Institute Co Ltd, China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp, Northeast Electric Power Design Institute of China Power Engineering Consulting Group, North China Electric Power Design Institute of China Power Engineering Consulting Group Corp, China Power Engineering Consulting Group Corp filed Critical State Grid Corp of China SGCC
Priority to CN 201020690341 priority Critical patent/CN202094579U/en
Application granted granted Critical
Publication of CN202094579U publication Critical patent/CN202094579U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Insulators (AREA)

Abstract

The utility model relates to lead hanging point equipment used for a steel pipe tower, comprising a cylindrical lead cross-arm main plate, and a first annular plate and a second annular plate which are respectively sleeved on the lead cross-arm main plate in a welding manner. The first annular plate and the second annular plate are separated by a certain interval; the first annular plate is provided with a lead hanging aperture and a recess is arranged at a side edge of the first annular plate; a bolt aperture is arranged on the second annular plate; a cover plate is cooperatively connected with the second annular plate; the cover plate also comprises a lead hanging aperture and a bolt aperture which are arranged on the cover plate; the bolt aperture on the cover plate corresponds to the bolt aperture on the second annular plate; the second annular plate is connected with the cover plate through the bolt aperture by a bolt; and the lead hanging aperture on the cover plate is opposite to a recess on the second annular plate. According to the utility model, the lead hanging point equipment can satisfy the requirement of wire hardware of a steel pipe tower of ac extra-high voltage and extension resistance; the lead hanging point equipment is connected with a lead cross-arm in a reliable manner; and construction, installation and maintenance are convenient.

Description

A kind of lead hanging point equipment that is used for steel tube tower
Technical field
The relevant a kind of power transmission tower lead hanging point equipment of the utility model refers to the lead hanging point equipment that uses on the AC extra high voltage circuit strain insulator steel tube tower especially.
Background technology
Ultra-high voltage AC transmission is meant the ac transmission engineering and the correlation technique of 1000kV and above electric pressure.Characteristics such as the UHV transmission technology has at a distance, big capacity, low-loss and economy.Though the UHV transmission technology has above advantage,, iron tower of power transmission line all there is very high requirement because the electric pressure of ultra high voltage is very high.
In recent years, the construction of voltage levels transmission line is in full swing, and along with the raising of electric pressure, steel tube tower has obtained unprecedented application in ultrahigh voltage alternating current transmission lines.Adopt double loop AC extra high voltage transmission of electricity can reduce the quantity of required use iron tower, minimizing takies land resource, and the electric energy loss when reducing long distance power transmission can be satisfied the wilderness demand of central and east regional economic development to electric power resource simultaneously.Adopt double loop AC extra high voltage transmission of electricity imperative.
Owing to adopt the circuit of double loop AC extra high voltage transmission of electricity mostly to be basic routing line, therefore the iron tower in AC extra high voltage transmission line is in case because fault or external force is destroyed or tower takes place, the influence that is caused is very serious and abominable, so the AC extra high voltage transmission of electricity has proposed stricter requirement to the transmission facility on the transmission line.Wherein, strain tower need satisfy the electric clearance requirement of AC extra high voltage transmission of electricity, further, strain tower also will bear the load and the transmission pressure tension force in the horizontal direction of vertical direction, and bear waving of lead under severe weather conditions, so the AC extra high voltage transmission of electricity is more harsh to the requirement of strain tower.
AC extra high voltage lead hanging point of the prior art is difficult to satisfy for safety, the convenient requirement of installing, overhauling.Therefore, need a kind of being used for to satisfy the requirement of lead gold utensil, the lead hanging point form that reliably is connected and is convenient to install and overhauls with the lead cross-arm on the AC extra high voltage circuit strain insulator steel tube tower.
The utility model content
A purpose of the present utility model is to provide a kind of lead hanging point that is used for AC extra high voltage strain insulator steel tube tower.
The utility model has been described a kind of lead hanging point equipment that is used for steel tube tower, it is characterized in that, described lead hanging point equipment comprises: cylindrical conductor cross-arm master material; Mode with welding is socketed in first ring flat-plate and second ring flat-plate on the described lead cross-arm master material respectively, and described first ring flat-plate and second ring flat-plate separate with a determining deviation; Wherein said first ring flat-plate is provided with the lead hanging hole and is provided with recess at the one lateral edges, and second ring flat-plate is provided with bolt hole; And the cover plate that is connected with described second ring flat-plate, described cover plate also comprises lead hanging hole and bolt hole disposed thereon, bolt hole on the described cover plate is connected with bolt by bolt hole with described cover plate with corresponding and described second ring flat-plate of bolt hole on described second ring flat-plate, and the lead hanging hole on its cover plate is aimed at the recess on second ring flat-plate.
Preferably, described second ring flat-plate is identical with described cover sheet thickness.
Preferably, described lead hanging point also comprises: be arranged on the floor of putting more energy on the described cover plate.
Preferred the, be welded on described first ring flat-plate and/or second ring flat-plate and/or be welded on one or more floors of putting more energy into that radially are provided with along ring flat-plate between first ring flat-plate and second ring flat-plate.
An advantage of the present utility model is that this lead hanging point form can satisfy the requirement of AC extra high voltage strain insulator steel tube tower lead gold utensil, and reliably is connected with the lead cross-arm, construction and installation, maintenance facility.
Description of drawings
Fig. 1 is the front view that shows the lead hanging point;
Fig. 2 is the cutaway view of Fig. 1 A-A along the line;
Fig. 3 is Fig. 1 B-B along the line but does not comprise cover plate cutaway view partly;
Fig. 4 is the front view of cover plate;
Fig. 5 is the cutaway view of Fig. 1 B-B along the line.
Embodiment
Below in conjunction with the accompanying drawing among the utility model embodiment, the technical scheme among the utility model embodiment is clearly and completely described, obviously, described embodiment only is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those skilled in the art are not making the every other execution mode that is obtained under the creative work prerequisite or are being equal to replacement, all in the scope of the utility model protection.
For realizing above-mentioned utility model purpose, the utility model has adopted following technical scheme:
Fig. 1 is the front view that shows the lead hanging point, and wherein ring flat-plate 1 and ring flat-plate 2 are socketed on the cylindrical conductor cross-arm master material 15 in the mode of welding respectively, and wherein ring flat- plate 1 and 2 is spaced from each other certain spacing.Radially weld the floor 4,5,6,7,8,9 of putting more energy at ring flat-plate upper edge ring flat-plate, the put more energy into shape and the position of floor of each shown in Fig. 1 is exemplary, and the floor of putting more energy into can carry out different settings according to stressed needs.
Fig. 2 is the cutaway view of Fig. 1 A-A along the line, wherein is provided with lead hanging hole 13 at ring flat-plate 1, and this lead hanging hole 13 axially connects described ring flat-plate 1, can be according to stressed needs at the diverse location setting of ring flat-plate 1 floor of putting more energy into.
Fig. 3 is Fig. 1 B-B along the line but does not comprise cover plate cutaway view partly, wherein radially be provided with recess 16 on ring flat-plate 2.Simultaneously, bolt hole 10 is set on ring flat-plate 2.Similarly, can the floor of putting more energy into be set according to stressed needs on ring flat-plate 2.
Fig. 4 shows the front view of cover plate, wherein cover plate 3 be provided with Fig. 3 in ring flat-plate 2 on the corresponding bolt hole 11 of bolt hole 10.Cover plate 3 can with ring flat-plate 2 uniform thickness.Also be provided with lead hanging hole 16 on the cover plate 3.
Fig. 5 is the cutaway view of Fig. 1 B-B along the line.Wherein show the view that ring flat-plate 2 is connected with cover plate 3.Ring flat-plate 2 and cover plate 3 are connected with bolt 12 by bolt hole 10,11, and the recess on the ring flat-plate 2 18 is aimed at the lead hanging hole 16 on the cover plate 3.Because having the cover plate 3 of lead hanging hole 16 is to be connected with ring flat-plate 2 by bolt 10, therefore, when carrying out the installation of steel tube tower lead, can be after the lead of the lead hanging hole 13 by ring flat-plate 1 be installed, lead to the lead hanging hole 16 by cover plate 3 is installed, and then cover plate 3 is connected on the ring flat-plate 2 again, can satisfy the requirement of AC extra high voltage strain insulator steel tube tower lead gold utensil thus, and reliably be connected with the lead cross-arm, construction and installation, maintenance are convenient.
More than be exemplary by bolt to being connected of carrying out of ring flat-plate 2 and cover plate 3, it is any removably to being connected all in spirit and scope of the present utility model that ring flat-plate 2 and cover plate 3 carry out that those skilled in the art adopt.
Further, can on cover plate 3, can add the floor 17 of putting more energy into according to requirement of strength.
The floor 4,5,6,7,8 and 9 of putting more energy into can merge according to structure needs and corresponding connecting plate.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the utility model.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined herein General Principle can realize under the situation that does not break away from spirit or scope of the present utility model in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, and the utility model is only limited by claims.

Claims (4)

1. a lead hanging point equipment that is used for steel tube tower is characterized in that, described lead hanging point equipment comprises:
Cylindrical conductor cross-arm master material;
Mode with welding is socketed in first ring flat-plate and second ring flat-plate on the described lead cross-arm master material respectively, and described first ring flat-plate and second ring flat-plate separate with a determining deviation; Wherein said first ring flat-plate is provided with the lead hanging hole and is provided with recess at the one lateral edges, and second ring flat-plate is provided with bolt hole; And
The cover plate that is connected with described second ring flat-plate, described cover plate also comprises lead hanging hole and bolt hole disposed thereon, bolt hole on the described cover plate is connected with bolt by bolt hole with described cover plate with corresponding and described second ring flat-plate of bolt hole on described second ring flat-plate, and the lead hanging hole on its cover plate is aimed at the recess on second ring flat-plate.
2. the lead hanging point equipment that is used for steel tube tower according to claim 1 is characterized in that described second ring flat-plate is identical with described cover sheet thickness.
3. the lead hanging point equipment that is used for steel tube tower according to claim 1 is characterized in that described lead hanging point also comprises:
Be arranged on the floor of putting more energy on the described cover plate.
4. the lead hanging point equipment that is used for steel tube tower according to claim 1, it is characterized in that, be welded on described first ring flat-plate and/or second ring flat-plate and/or be welded on one or more floors of putting more energy into that radially are provided with along ring flat-plate between first ring flat-plate and second ring flat-plate.
CN 201020690341 2010-12-30 2010-12-30 Lead hanging point equipment used for steel pipe tower Expired - Lifetime CN202094579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201020690341 CN202094579U (en) 2010-12-30 2010-12-30 Lead hanging point equipment used for steel pipe tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201020690341 CN202094579U (en) 2010-12-30 2010-12-30 Lead hanging point equipment used for steel pipe tower

Publications (1)

Publication Number Publication Date
CN202094579U true CN202094579U (en) 2011-12-28

Family

ID=45369622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201020690341 Expired - Lifetime CN202094579U (en) 2010-12-30 2010-12-30 Lead hanging point equipment used for steel pipe tower

Country Status (1)

Country Link
CN (1) CN202094579U (en)

Similar Documents

Publication Publication Date Title
CN202090661U (en) Alternating-current extra-high voltage one-tower double-circuit linear tower
CN202258577U (en) Six-linked 550 KN large-tonnage insulator suspension metal fittings string used for extra-high voltage DC large crossing
CN208078602U (en) A kind of high-tension cable upper boom bottom protection pipe
CN201635465U (en) Extra-high voltage electric transmission line terminal high tower
CN201438396U (en) Double I-shaped and V-shaped strain insulator strings for ultra-high voltage substation
CN202094579U (en) Lead hanging point equipment used for steel pipe tower
CN203690018U (en) Minus or plus 800 kV extra-high voltage DC line sectional type composite insulator conducting wire suspension string
CN202090658U (en) Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN202172131U (en) Conductive connection board for leading-out wire of electric power grounding net
CN204691378U (en) End fixing piece for composite cross arm
CN201690183U (en) Serial yoke plate for 1150-kilovolt compact type 12-bundle leads
CN204947531U (en) A kind of three become two connects gold utensil and uses the insulator string of this connection gold utensil
CN105846380A (en) Connection structure for suspension strain insulator string
CN2914433Y (en) Duplex hanging string of extra high voltage transmission line
CN201498953U (en) Ultra-high voltage tension tower conducting wire hanging point system
CN207588375U (en) A kind of detachable branched cable hanging head hook structure
CN202081693U (en) Straight steel pipe rod of extra-high voltage DC grounding electrode line
CN202090655U (en) Inserting plate for joint connection of steel tube tower, steel tube tower and joint thereof
CN202090662U (en) Alternating current extra-high voltage same-tower and dual-loop strain tower
CN202358820U (en) Lifting tool for steel truss structure
CN205453043U (en) Strain insulator -string connecting device dangles
CN204057672U (en) A kind of combined material suspender
CN204947527U (en) A kind of iron tower of power transmission line cable bearer
CN201256271Y (en) Dual change tri-connection board for tri-connection strain insulator-string
CN205453056U (en) Strain insulator -string connection structure dangles

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: CHINA POWER ENGINEERING CONSULTING (GROUP) CORPORATION

Patentee after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING GROUP

Patentee after: Co., Ltd of Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee after: Co., Ltd of Huabei Power Design Inst., China Power Engineering Consulting Group

Patentee after: Co., Ltd of Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee after: NORTHWEST ELECTRIC POWER DESIGN INSTITUTE CO., LTD. OF CHINA POWER ENGINEERING CONSULTING GROUP

Patentee after: China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: China Power Engineering Consulting Group Corporation

Patentee before: North China Electric Power Design Institute of China Power Engineering Consulting Group Corporation

Patentee before: Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee before: Huabei Power Design Inst., China Power Engineering Consulting Group

Patentee before: Central Southern China Electric Power Design Institute, China Power Engineering Consulting Group Cor

Patentee before: Northwest Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Patentee before: Southwest Electric Power Design Institute of China Power Engineering Consulting Group Corporation

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20111228