CN202090069U - System for replacing new positive electrodes during production process of electrolytic aluminum - Google Patents

System for replacing new positive electrodes during production process of electrolytic aluminum Download PDF

Info

Publication number
CN202090069U
CN202090069U CN2011200926878U CN201120092687U CN202090069U CN 202090069 U CN202090069 U CN 202090069U CN 2011200926878 U CN2011200926878 U CN 2011200926878U CN 201120092687 U CN201120092687 U CN 201120092687U CN 202090069 U CN202090069 U CN 202090069U
Authority
CN
China
Prior art keywords
platform
measure
replacing
positive electrodes
production process
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200926878U
Other languages
Chinese (zh)
Inventor
岳洪生
张春雷
谭雪军
张久生
刘显君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS Co Ltd
Original Assignee
CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS Co Ltd filed Critical CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS Co Ltd
Priority to CN2011200926878U priority Critical patent/CN202090069U/en
Application granted granted Critical
Publication of CN202090069U publication Critical patent/CN202090069U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses a system for replacing new positive electrodes during a production process of electrolytic aluminum, which comprises a datum platform, a weighing sensor, a damping platform, a measure and control instrument, a signal transmitting device, a signal receiving device and a hydraulic lifting trolley. A guide block is arranged under the datum platform, the guide block is inserted in a guide groove arranged on a datum platform base and located on the damping platform through the weighing sensor, and a buffer spring, the measure and control instrument and the signal transmitting device are arranged under the damping platform. The datum platform base, the buffer spring, the measure and control instrument and the signal transmitting device are arranged on a lifting frame of the hydraulic lifting trolley. The signal receiving device is arranged on a crown block. The system for replacing the new positive electrodes during the production process of electrolytic aluminum performs measurement, locking, storage and displaying of data and outputs relative control signals through various instruments and meters, achieves automatic control of replacing the positive electrodes, is reasonable in structure and convenient to use, can improve efficiency of replacing the positive electrodes, guarantees error of horizontal height between bottom surfaces of an old positive electrode and a new positive electrode not to exceed +/-5mm and achieves accurate replacement of the old positive electrode and the new positive electrode in fixed height mode.

Description

A kind of Aluminum Electrolysis Production process that is used for more renews the anodic system
Technical field:
The utility model relates to a kind of supplementary unit of Aluminum Electrolysis Production process, particularly relates to a kind of Aluminum Electrolysis Production process that is used for and more renews the anodic system.
Background technology:
At present, a plurality of conductive anodes that hang in the Aluminum Electrolysis Production process and be immersed in the electrolytic aluminium liquid require its bottom surface and the electrolyzer bottom surface of conduct conduction negative pole to keep certain equal height, reach each anode institute power consumption stream uniformity.The anode bottom surface constantly consumes during work, and volume-diminished is to a certain degree will more renewing anode, after processing requirement is changed, the level height error of old, new anode bottom surface is no more than ± 5mm, and overproof then energy consumption increases, and efficient reduces, electrolyzer shortening in work-ing life increases production cost.Existing new anodic replacing method has several: (1) artificial setting-out, dipstick metering, and its error is big, and efficient is low; (2) anode is placed on the fixed reference platform measures,, easily present heeling condition after being placed on the fixed reference platform, make measured height and vertical height that bigger error be arranged, changing the influence of anode precision greatly because old anode shape is irregular; (3) with " U " type framework two groups of correlation phototubes of height are installed, with light as unsettled simulation reference platform face, though guaranteed the measurement of anode under the suspention plumbness, but framework is subjected to old anode hyperthermia radiation after strain, the light angle that causes launching obviously changes, another factor is that light enters the generation refraction of hyperthermia radiation district, and these all can cause bigger error to simulation reference platform height.In addition, above-mentioned (1) kind method needs operation at the scene, and Working environment is more abominable; The used reference platform of above-mentioned (2) kind method is a fixed, and is many for quantity, and it is great inconvenience that layout dispersive electrolyzer implements to change the anodic operation.
The utility model content:
The utility model is at the deficiencies in the prior art, provide a kind of Aluminum Electrolysis Production process that is used for more to renew the anodic system, this novel texture is reasonable, easy to use, can improve and change anodic efficient, after changing anode, can guarantee old, the level height error of new anode bottom surface is no more than ± 5mm, technical problem to be solved in the utility model is to adopt removable reference platform, by the measurement of various instrument implementation data is set, locking, storage, demonstration and the relevant control signal of output, realize changing anodic automatization control, the technical scheme of being taked is as follows, the utility model comprises reference platform, it is characterized in that also comprising LOAD CELLS, damped platform, measure and control instrument and signal transmitting and receiving device and hydraulic lift truck, the reference platform below is provided with orienting lug, this orienting lug is inserted in the guide path on the reference platform seat, and be seated on the damped platform through a LOAD CELLS, be arranged with buffer spring and measure and control instrument and sender unit at damped platform, the reference platform seat, buffer spring and measure and control instrument and sender unit place on the lifting support of hydraulic lift truck, and signal receiving device then places on the overhead traveling crane.
Action principle of the present utility model is as follows:
Hang the height of electrolyzer according to old anode, determine a difference of altitude by reference platform of the present utility model, new anode just can be determined the anodic hoisting height that makes new advances according to this difference of altitude more also by reference platform of the present utility model.Promptly when the anode bottom surface presses the reference platform table top, LOAD CELLS and measure and control instrument are when measurement reaches certain value to pressure (adjustable), instrument output node signal, transmit wirelessly through the radio station, the anode height-finding system measures, locks, stores, shows and export relevant control signal according to this signal to the anode bottom surface of suspention with the relative height of reference platform, comprise that control overhead traveling crane hoisting appliance is out of service, realize the fixed high accurate replacing of old, new anode.
Compared with prior art, the utlity model has following advantage:
The utility model is as analog platform, the measuring accuracy height, and speed is fast; adopt thermal insulation protection, not thermal radiation influence of measuring accuracy, simple to operate; working stability is reliable; and rational in infrastructure, easy to use, can improve and change anodic efficient; after changing anode; the level height error that can guarantee old, new anode bottom surface is no more than ± 5mm, and measurement, locking, storage, demonstration and the relevant control signal of output by various instrument implementation data are set realize changing anodic automatization control.
Description of drawings:
Accompanying drawing 1 is the utility model structural representation,
Accompanying drawing 2 is anode lifting synoptic diagram,
Embodiment:
The utility model comprises reference platform 6; LOAD CELLS 7; damped platform 8; measure and control instrument and sender unit 3; signal receiving device 11 and hydraulic lift truck 1; reference platform 6 belows are provided with orienting lug 5; this orienting lug is inserted in the guide path on the reference platform seat; and be seated on the damped platform 8 through LOAD CELLS 7; because anode 12 is from pressing weighing platform to the final downward cushion stroke that has five centimeters approximately out of service; for protecting LOAD CELLS and platform structure can not cause damage because of being subjected to excessive impact; under damped platform, be provided with damped platform 8; adopt buffer spring 9 controls; weighing platform goes downwards to anode and stops; after leaving, anode returns to original position; buffer spring 9 and measure and control instrument and sender unit 3 are positioned at reference platform seat 4; and place on the lifting support 2 of hydraulic lift truck; 11 of signal receiving devices place on the overhead traveling crane 10; the utility model can run to the place suitable apart from electrolyzer easily; make and change the anodic lifting, improve and change anodic efficient apart from the shortest.

Claims (1)

1. one kind is used for the Aluminum Electrolysis Production process and more renews the anodic system, comprise reference platform, it is characterized in that also comprising LOAD CELLS, damped platform, measure and control instrument and signal transmitting and receiving device and hydraulic lift truck, the reference platform below is provided with orienting lug, this orienting lug is inserted in the guide path on the reference platform seat, and be seated on the damped platform through a LOAD CELLS, be arranged with buffer spring and measure and control instrument and sender unit at damped platform, the reference platform seat, buffer spring and measure and control instrument and sender unit place on the lifting support of hydraulic lift truck, and signal receiving device then places on the overhead traveling crane.
CN2011200926878U 2011-03-27 2011-03-27 System for replacing new positive electrodes during production process of electrolytic aluminum Expired - Fee Related CN202090069U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200926878U CN202090069U (en) 2011-03-27 2011-03-27 System for replacing new positive electrodes during production process of electrolytic aluminum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200926878U CN202090069U (en) 2011-03-27 2011-03-27 System for replacing new positive electrodes during production process of electrolytic aluminum

Publications (1)

Publication Number Publication Date
CN202090069U true CN202090069U (en) 2011-12-28

Family

ID=45365150

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200926878U Expired - Fee Related CN202090069U (en) 2011-03-27 2011-03-27 System for replacing new positive electrodes during production process of electrolytic aluminum

Country Status (1)

Country Link
CN (1) CN202090069U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104089742A (en) * 2014-07-14 2014-10-08 北京航空航天大学 Weighing sensor fast switching device
CN105177625A (en) * 2015-09-02 2015-12-23 广西南宁凡成电子科技有限公司 Method for replacing anode of electrolytic bath
CN105256333A (en) * 2015-11-23 2016-01-20 株洲天桥起重机股份有限公司 Anode replacement system for aluminum electrolysis production

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104089742A (en) * 2014-07-14 2014-10-08 北京航空航天大学 Weighing sensor fast switching device
CN105177625A (en) * 2015-09-02 2015-12-23 广西南宁凡成电子科技有限公司 Method for replacing anode of electrolytic bath
CN105177625B (en) * 2015-09-02 2017-07-07 广西南宁凡成电子科技有限公司 A kind of method that electrolytic cell changes anode
CN105256333A (en) * 2015-11-23 2016-01-20 株洲天桥起重机股份有限公司 Anode replacement system for aluminum electrolysis production
CN105256333B (en) * 2015-11-23 2017-09-22 株洲天桥起重机股份有限公司 A kind of anode change system for aluminum electrolysis
CN105256333B9 (en) * 2015-11-23 2022-07-26 株洲天桥起重机股份有限公司 Anode replacing system for aluminum electrolysis production

Similar Documents

Publication Publication Date Title
CN205049110U (en) Double anode height finding positioner based on laser rangefinder technique
CN105177625B (en) A kind of method that electrolytic cell changes anode
CN104034595B (en) Fresh mortar slurry is without the determinator of lateral spacing bearing capacity and assay method
CN202090069U (en) System for replacing new positive electrodes during production process of electrolytic aluminum
CN104567641A (en) Middle and small span bridge deflection measuring device
CN105441980A (en) Online monitoring device for anode current distribution of aluminum electrolysis cell and monitoring method of online monitoring device
CN204151431U (en) A kind of bus installs whippy structure anodic current measuring apparatus
CN108728868A (en) On-line measurement hearth and bottom and two horizontal devices and measurement method
CN202304750U (en) Measuring device for positioning pin and axle center by utilizing total station
CN102400184B (en) Method for realizing accurate replacement of electrode of aluminum electrolytic cell
CN202347106U (en) Anode height positioning device
CN205940872U (en) Centrobaric calculating device of counter weight
CN211425327U (en) Terrace roughness measuring tool
CN112483072A (en) Pumping unit polished rod indicator diagram testing device, system and testing method
CN204714919U (en) Aluminum cell anodic current distribution on-Line Monitor Device
CN103673954A (en) Polar plate pile height measuring device of lead-acid storage battery
CN205262431U (en) Bridge girders displacement monitoring devices
CN211346705U (en) Automatic height measurement compensating device for anode and replacing device thereof
CN201382808Y (en) Weighing device for movable charging bucket
CN204255490U (en) A kind of electronic scales on-line proving device
CN202329753U (en) Device for measuring height of aluminum liquid
CN211978042U (en) Water level monitoring device for hydraulic engineering
CN210508258U (en) Hanging ruler for assisting in leveling of suspended ceiling framework
CN201169642Y (en) Electrolyte tank anode large bus bar position indicating device
CN203364821U (en) Four-angle level gauge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS CO., LTD.

Document name: Notification to Pay the Fees

DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: CHENGDE CITY DEVELOPMENT ZONE SHENGFANG ELECTRONICS CO., LTD.

Document name: Notification of Termination of Patent Right

DD01 Delivery of document by public notice
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20170327

CF01 Termination of patent right due to non-payment of annual fee