CN202087537U - Steel pipe sorting and collecting device - Google Patents

Steel pipe sorting and collecting device Download PDF

Info

Publication number
CN202087537U
CN202087537U CN2011201581475U CN201120158147U CN202087537U CN 202087537 U CN202087537 U CN 202087537U CN 2011201581475 U CN2011201581475 U CN 2011201581475U CN 201120158147 U CN201120158147 U CN 201120158147U CN 202087537 U CN202087537 U CN 202087537U
Authority
CN
China
Prior art keywords
swing arm
steel pipe
charging basket
oblique
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201581475U
Other languages
Chinese (zh)
Inventor
赵金锋
姚发宏
吕庆功
李亚欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Original Assignee
Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinomet Technologies Co Ltd University Of Science & Technology Beijing filed Critical Sinomet Technologies Co Ltd University Of Science & Technology Beijing
Priority to CN2011201581475U priority Critical patent/CN202087537U/en
Application granted granted Critical
Publication of CN202087537U publication Critical patent/CN202087537U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Combined Means For Separation Of Solids (AREA)

Abstract

The utility model provides a steel pipe sorting and collecting device which comprises a first material basket, a second basket, an oblique swing arm (1), a polyurethane layer (2), a hydraulic oil cylinder (3), an ejector head (4), a stopper (5) and an oil cylinder clamp ring (6), wherein the ejector head (4) and the oblique swing arm (1) are in sliding contact with each other; the oblique swing arm (1) is driven by the hydraulic oil cylinder (3) to move up and down; the hydraulic oil cylinder (3) is connected with the oblique swing arm (1) in a sliding manner through the ejector head (4); and the polyurethane layer (2) is coated on the upper side of the swing arm. When a qualified steel pipe passes through, the oblique swing arm (1) that is arranged on the first material basket is closed, and the steel pipe is collected in the second material basket through the transition of the oblique swing arm (1); and when a unqualified steel pipe passes through, the oblique swing arm (1) is open, the steel pipe is directly collected in the first material basket. The oil cylinder is adopted to drive the oblique swing arm to open or close the material baskets with the effects of flexibility and rapidness; the number of parts required for replacement and maintenance in the whole device is reduced; the reliability of the device is improved; and the maintenance cost is reduced.

Description

A kind of steel pipe separation and collection device
Technical field
The utility model relates to steel pipe separation and collection device commonly used on a kind of seamless steel tube production chain, belongs to the steel pipe's production field.
Background technology
On seamless steel pipe heat-treatment production line, pipe machining production line and the finishing production line a lot of detections and process equipment are arranged, steel pipe will carry out qualified and sorting substandard product behind these equipment of process, particularly will collect, roll off the production line defective work, this just need be provided with the separation and collection charging basket on production line.Each producer adopts driven by motor sprocket wheel, driving-chain and power transmission shaft to drive oblique swing arm open closed when adopting oblique arm formula sorting charging basket more at present, this mode complex structure, and equipment processing and installation difficulty, maintenance workload is big.
Summary of the invention
For addressing the above problem, the utility model provides a kind of steel pipe separation and collection device, is used on steel pipe heat-treatment production line, pipe machining production line and the finishing production line.This installs mainly by first charging basket, second charging basket, and tiltedly swing arm 1, layer of polyurethane 2, hydraulic jack 3, with the top 4 of oblique swing arm sliding-contact, oil cylinder fixedly snap ring 6 and block 5 etc. is partly formed.The tiltedly rise of swing arm 1, fall action and driven by hydraulic jack 3, hydraulic jack 3 is slidingly connected with oblique swing arm 1 by coming directly towards 4.This installs online layout, and tiltedly swing arm 1 falls by manually or automatically controlling to rise, and needs the steel pipe of sorting to enter corresponding charging basket.
Its working method is: steel pipe is transported to by cold bed or sloping skid etc. before the separation and collection device, and in the time of need entering the collection of first charging basket, hydraulic jack rises, and tiltedly swing arm 1 is opened about 35 ° under the driving of hydraulic jack 3, and steel pipe rolls into first charging basket; When steel pipe need enter the collection of second charging basket, hydraulic jack 3 was in the decline state, and tiltedly swing arm 1 falls, and kept certain slope (about 2 °), made the first charging basket closure, and steel pipe rolls into second charging basket by oblique swing arm.Tiltedly swing arm 1 upside studs with layer of polyurethane 2, collides with to prevent steel pipe.Can layer of polyurethane 2 be installed equally at oblique swing arm 1 downside, scratch steel pipe above the steel pipe in the uphill process to prevent that oblique swing arm 1 from riding over.
Qualified steel pipe by the time, oblique swing arm 1 closure on first charging basket, the transition of steel pipe by oblique swing arm 1 enters second charging basket and collects; When defective steel pipe passed through, tiltedly swing arm 1 was opened, and steel pipe directly enters first charging basket and collects.After the first charging basket collection is full, the bundled lifting of steel pipe, oblique swing arm 1 back that contact is risen drives oblique swing arm 1 and opens with wide-angle more, top 4 on swing arm and the hydraulic jack 3 breaks away from, treat that steel pipe leaves the swing arm 1 of retreading and falls automatically above the oil cylinder top 4 of rise, hydraulic jack 3 descends the first charging basket closure then.
Compare with traditional separation and collection device, the utlity model has simple and practical, easy to operate.Adopt the hydraulic oil cylinder driving oblique arm to realize the folding of charging basket, flexible movements are rapid, the parts that need to change maintenance in the whole device seldom, the equipment dependability height, maintenance cost is low.Equipment is simple in addition, helps the I﹠M of equipment, reduces equipment investment.
Description of drawings
Fig. 1 is a side view of the present utility model.
Fig. 2 is a vertical view of the present utility model.
Among the figure: the oblique swing arm of 1-; The 2-layer of polyurethane; The 3-hydraulic jack; The 4-top; The 5-block; The 6-oil cylinder is snap ring fixedly.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is further described.
With reference to accompanying drawing 1 and Fig. 2, steel pipe separation and collection device is mainly by first charging basket, second charging basket, and tiltedly swing arm 1, layer of polyurethane 2, hydraulic jack 3, with the top 4 of oblique swing arm sliding-contact, oil cylinder fixedly snap ring 6 and block 5 etc. is partly formed.The tiltedly rise of swing arm 1, fall action and driven by hydraulic jack 3, hydraulic jack 3 is slidingly connected with oblique swing arm 1 by coming directly towards 4.This installs online layout, and tiltedly swing arm 1 falls by manually or automatically controlling to rise, and needs the steel pipe of sorting to enter corresponding charging basket.
Its working method is: steel pipe is transported to by cold bed or sloping skid etc. before the separation and collection device, and in the time of need entering the collection of first charging basket, hydraulic jack rises, and tiltedly swing arm 1 is opened about 35 ° under the driving of hydraulic jack 3, and steel pipe rolls into first charging basket; When steel pipe need enter the collection of second charging basket, hydraulic jack 3 was in the decline state, and tiltedly swing arm 1 falls, and kept certain slope (about 2 °), made the first charging basket closure, and steel pipe rolls into second charging basket by oblique swing arm.The swing arm upside studs with layer of polyurethane 2, collides with to prevent steel pipe.Can layer of polyurethane 2 be installed equally at oblique swing arm downside, scratch steel pipe above the steel pipe in the uphill process to prevent that oblique swing arm 1 from riding over.
Qualified steel pipe by the time, oblique swing arm 1 closure on first charging basket, the transition of steel pipe by oblique swing arm 1 enters second charging basket and collects; When defective steel pipe passed through, tiltedly swing arm 1 was opened, and steel pipe directly enters first charging basket and collects.Behind the full steel pipe of the first charging basket collection, the workshop crane hangs out charging basket with steel pipe.Tiltedly swing arm 1 drives by oil cylinder 3 and can only be opened to about 35 °, and steel pipe hangs out charging basket needs swing arm to open more wide-angle, and swing arm this moment continues to rise need be by the strength of crane.The steel pipe that rises continues to rise after contacting oblique swing arm, tiltedly swing arm separates with the top on driving oil cylinder, (about 80 °) just can not exert an influence to the steel pipe handling after oblique swing arm is opened to certain angle, at the afterbody of swing arm block are set, to prevent that oblique swing arm open angle is above 80 °.After steel pipe rises to certain altitude and breaks away from oblique swing arm 1, because tiltedly swing arm is risen angle less than 90 °, can rely on self gravitation to fall back to above the oil cylinder of rise, hydraulic jack 3 descends then, and swing arm falls, the first charging basket closure.Usually be arranged on pipe production line finished product collection section, realize the separation and collection of qualified and defective steel pipe.This device form that also can take first charging basket to be equipped with oblique swing arm is arranged on steel pipe machining production line top and detects and the process equipment back simultaneously, realizes that defective steel pipe collects with regard to underground cable.

Claims (6)

1. steel pipe separation and collection device, comprise: first charging basket, second charging basket, it is characterized in that: also be provided with fixedly snap ring (6) of oblique swing arm (1), layer of polyurethane (2), hydraulic jack (3), top (4), block (5), oil cylinder, top (4) and tiltedly swing arm (1) sliding-contact, fall action and are driven by hydraulic jack (3) at the tiltedly rise of swing arm (1).
2. steel pipe separation and collection device according to claim 1 is characterized in that: hydraulic jack (3) is slidingly connected by top (4) and oblique swing arm (1).
3. steel pipe separation and collection device according to claim 1 is characterized in that: tiltedly the upside of swing arm (1) studs with layer of polyurethane (2).
4. steel pipe separation and collection device according to claim 1 is characterized in that: qualified steel pipe by the time, oblique swing arm (1) closure on first charging basket, the transition of steel pipe by oblique swing arm (1) enters second charging basket and collects; When defective steel pipe passed through, tiltedly swing arm (1) was opened, and steel pipe directly enters first charging basket and collects.
5. steel pipe separation and collection device according to claim 1 is characterized in that: rise and fall connecting material and punishment in advance of realization first charging basket by controlling oblique swing arm (1), tiltedly the angle of swing arm swing is about 35 °.
6. steel pipe separation and collection device according to claim 1, it is characterized in that: after the first charging basket collection is full, the bundled lifting of steel pipe, oblique swing arm (1) back that contact is risen drives oblique swing arm (1) and opens with wide-angle more, top (4) on swing arm and the hydraulic jack (3) breaks away from, treat that steel pipe leaves the swing arm of retreading (1) and falls automatically above the oil cylinder top (4) of rise, hydraulic jack (3) descends then, the first charging basket closure.
CN2011201581475U 2011-05-18 2011-05-18 Steel pipe sorting and collecting device Expired - Fee Related CN202087537U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201581475U CN202087537U (en) 2011-05-18 2011-05-18 Steel pipe sorting and collecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201581475U CN202087537U (en) 2011-05-18 2011-05-18 Steel pipe sorting and collecting device

Publications (1)

Publication Number Publication Date
CN202087537U true CN202087537U (en) 2011-12-28

Family

ID=45362638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201581475U Expired - Fee Related CN202087537U (en) 2011-05-18 2011-05-18 Steel pipe sorting and collecting device

Country Status (1)

Country Link
CN (1) CN202087537U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102530540A (en) * 2012-02-17 2012-07-04 无锡华联精工机械有限公司 Recovering transitional device
CN104289447A (en) * 2014-09-28 2015-01-21 许昌远博机械有限公司 Machining and screening device for steel pipes
CN106986077A (en) * 2017-05-05 2017-07-28 湖北宝立科技有限公司 Beverage closure conveying device for automatic bag opening machine
CN109604175A (en) * 2019-02-21 2019-04-12 重庆大学 A kind of closely knit pipe detection sorting equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102530540A (en) * 2012-02-17 2012-07-04 无锡华联精工机械有限公司 Recovering transitional device
CN104289447A (en) * 2014-09-28 2015-01-21 许昌远博机械有限公司 Machining and screening device for steel pipes
CN104289447B (en) * 2014-09-28 2016-04-27 许昌远东传动轴股份有限公司 A kind of steel pipe processing screening plant
CN106986077A (en) * 2017-05-05 2017-07-28 湖北宝立科技有限公司 Beverage closure conveying device for automatic bag opening machine
CN109604175A (en) * 2019-02-21 2019-04-12 重庆大学 A kind of closely knit pipe detection sorting equipment

Similar Documents

Publication Publication Date Title
CN201849968U (en) Dustless intelligent discharge device
CN202087537U (en) Steel pipe sorting and collecting device
CN104120986B (en) Vehicular fully automatic hydraulic tubing tongs device
CN201702647U (en) Automatic loading and unloading device of bearing grinder
CN106756702B (en) A kind of continuous production flexibility coating steel pipe production line
CN201777620U (en) Steel coil storage platform
CN203330015U (en) Steel pipe selection and collection device
CN206980212U (en) A kind of band press filter with drain separator
CN104860021A (en) Mechanical bucket elevator with automatic discharging function and control method thereof
CN203978335U (en) Vehicular fully automatic hydraulic tubing tongs device
CN103350111B (en) Mandrel screw-on machine pre-screwing and auxiliary machine device
CN209668337U (en) A kind of coal mine twin-skip divides storage system automatically
CN202322203U (en) Steel pipe feeding device
CN204643007U (en) Mechanical type automatic discharging bucket elevator
CN2431950Y (en) Movable lifting feed device
CN104773621A (en) Lift-type rolling-up device
CN104668208A (en) Steel pipe selection and collection device
CN105151702B (en) Calcium carbide production Intelligent transport cooling system
CN204588331U (en) Lifting mode wrap-up
CN203991660U (en) The sleeve return mechanism of aluminium foil mill
CN203753713U (en) Electric dumping device of receiving hopper
CN108149641B (en) Inclined float blocking system and float blocking method
CN201305314Y (en) Anti-dropping device of strip-steel small-roll
CN202543142U (en) Device for charging cold coke into dry coke quenching device
CN202499543U (en) Recovery transition device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice

Addressee: Sinomet Technologies Co., Ltd., University of Science & Technology Beijing

Document name: Notification of Passing Examination on Formalities

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111228

Termination date: 20150518

EXPY Termination of patent right or utility model