CN202083614U - Test device of hardened concrete imperviousness under constrained state - Google Patents

Test device of hardened concrete imperviousness under constrained state Download PDF

Info

Publication number
CN202083614U
CN202083614U CN 201120165084 CN201120165084U CN202083614U CN 202083614 U CN202083614 U CN 202083614U CN 201120165084 CN201120165084 CN 201120165084 CN 201120165084 U CN201120165084 U CN 201120165084U CN 202083614 U CN202083614 U CN 202083614U
Authority
CN
China
Prior art keywords
concrete
under
frame
proving installation
restrained condition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120165084
Other languages
Chinese (zh)
Inventor
冯树荣
李中华
苏超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Zhongnan Engineering Corp Ltd
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CN 201120165084 priority Critical patent/CN202083614U/en
Application granted granted Critical
Publication of CN202083614U publication Critical patent/CN202083614U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a test device of hardened concrete imperviousness under a constrained state, belonging to the hardened concrete imperviousness field and aiming at solving the problem that the measuring result is deviated from practical condition as the concrete is not in a constrained state by adopting the existing experimental device and the method. The test device comprises a support bracket, a concrete constraining cracking frame is arranged on the support bracket, and a chloride ion permeability test device is arranged on the concrete constraining cracking frame, and consists of a cathode chamber and an anode chamber which both comprise binding posts and electrodes. The test device is simple in structure, is convenient in operation, is accurate in measurement and can carry out hardened concrete imperviousness test under the constrained state, so as to provide theory support and test means for deeply researching concrete durability and optimizing concrete proportioning and structural design.

Description

The proving installation of maturing anti-permeability performance under a kind of restrained condition
Technical field
The utility model relates to the impervious field of maturing, relates in particular to a kind of proving installation that is used to measure maturing anti-permeability performance under the restrained condition.
Background technology
Concrete permeability resistance is to characterize concrete to resist the ability of outside etching medium to the inside concrete diffusion.And the high-strength high-performance concrete early-age shrinkage of widespread use is bigger, can cause that under constraint condition concrete ftractures in early days, and the generation in crack can reduce concrete anti-permeability performance, thereby influences concrete permanance.
At present, the research of concrete impermeability is all carried out under the concrete free state, concrete formation and hardening process are inconsistent in this and the actual engineering, so measurement result departs from reality.Therefore, investigate concrete anti-permeability performance and be the further investigation concrete durability under measurement constraint condition, optimizing concrete mix and structural design provides theory to support and research technique.
Summary of the invention
Concrete is not under restrained condition during at existing experimental provision and method measurement concrete impermeability, measurement result departs from actual situation, the utility model aims to provide the proving installation of maturing anti-permeability performance under a kind of restrained condition, can be the further investigation concrete durability, optimizing concrete mix and structural design provides theoretical support and research technique.
For achieving the above object, the technical solution of the utility model is as follows: the proving installation of maturing anti-permeability performance under the described restrained condition, its design feature is, comprise bracing frame, concrete constraint cracking frame is housed on this bracing frame, on concrete constraint cracking frame, the chloride permeability test unit is housed; Described chloride permeability test unit is made up of cathode chamber and anode chamber, and described cathode chamber and anode chamber have included binding post and electrode.
In order to improve the rigidity of proving installation, the arranged outside of described concrete constraint cracking frame has many ribs.
For concrete contraction is played effect of contraction, between described concrete constraint cracking frame and concrete, be equipped with a plurality of screw bolts.
In order to measure accurately and conveniently to fix two utmost point chambers, prevent that chlorion will be diffused into concrete other position under effect of electric field, described cathode chamber and anode chamber preferably are symmetricly set on the both sides of concrete constraint cracking frame.
Support frame as described above comprises flat board and vertical beam, and described concrete constraint cracking frame is fixed on the flat board, and described vertical beam is positioned at the both sides of concrete constraint cracking frame, i.e. each side of concrete constraint cracking frame is equipped with a vertical beam.
In order to prevent that solution temperature raises in the anode, influence the rate of propagation of chlorion, cause measurement result inaccurate, include louvre in described cathode chamber and the anode chamber.
Can test the anti-permeability performance of maturing under the restrained condition according to the proving installation of maturing anti-permeability performance under the above-mentioned restrained condition, its testing procedure comprises:
A). in concrete constraint cracking frame, divide two-layer casting concrete;
B). after 28 days, concrete and concrete constraint cracking frame are together holded up, be fixed on the bracing frame;
C). the chloride permeability test unit is installed in concrete both sides, guarantees that the chloride permeability test unit closely contacts with concrete;
D). the NaCl solution of adding 2.5% ~ 3.5% in cathode chamber (2-6) is preferably 3%; Add the NaOH solution of 0.25mol/L ~ 0.35mol/L in the anode chamber, be preferably 0.3mol/L, impressed DC voltage is 0 ~ 60V, is preferably 60V, and power cathode is connected on the binding post of cathode chamber, and positive source is connected on the binding post of anode chamber;
E). the electric current by between two binding posts of reometer measurement, calculate electric flux according to ASTM C1202-07 method, estimate the concrete anti-permeability performance of restrained condition compacted under with this.
Wherein, in step a), in order to strengthen bolt to concrete effect of contraction, described screw bolt closely contacts with concrete.
In step b), concrete test zone is tied, remove surperficial laitance, so that concrete meeting slight bleeding in surface when moulding prevents that the surface is more loose, cause the inaccurate of measurement result.
In step c), spill in order to prevent two solution in the utmost point chamber, between infiltration experiment device and concrete joint synapsis, be provided with glass cement.
Compared with prior art, the beneficial effects of the utility model are: the utility model is simple in structure, easy to operate, measure accurately, and under restrained condition, maturing is carried out the anti-permeability performance test, consistent with concrete formation and hardening process in the actual engineering, so measurement result is equal to engineering reality, be the further investigation concrete durability, optimizing concrete mix and structural design provides theoretical support and research technique.
Below in conjunction with drawings and Examples the utility model is further elaborated.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is that the A of Fig. 1 is to view;
Fig. 3 is that the B of Fig. 1 is to view;
Fig. 4 is the synoptic diagram of 1 part among Fig. 1;
Fig. 5 is that 4 C is to view;
Fig. 6 is that the D of Fig. 4 is to view;
Fig. 7 is the structural representation of 2 parts among Fig. 1;
Fig. 8 is that the E of Fig. 7 is to synoptic diagram;
Fig. 9 is that the F of Fig. 7 is to synoptic diagram;
Figure 10 is the structural representation of 3 parts among Fig. 1;
Figure 11 is that the G of Figure 10 is to synoptic diagram;
Figure 12 is that the H of Figure 10 is to synoptic diagram.
Embodiment
As shown in Figure 1, device described in the utility model is made up of concrete constraint cracking frame 1, chloride permeability test unit 2 and bracing frame 3.Wherein, the outside on concrete constraint cracking frame 1 each limit has all added four rib 1-2,1-3, to improve the rigidity of proving installation, has assembled 14 screw bolt 1-1 inwardly simultaneously on four limits of proving installation concrete 4 has been shunk effect of contraction.Chloride permeability test unit 2 is made up of cathode chamber 2-6 and the 2-7 of anode chamber, and the two is a symmetrical structure.Two utmost point chambers comprise binding post 2-2 respectively, and 2-10, electrode 2-3, louvre 2-5 form, and 2-1 place, two utmost point chambers has 4 hole 2-9 respectively.Bracing frame 3 comprises that dull and stereotyped 3-2 and vertical beam 3-1 form.
Concrete method of testing is as follows:
On the ground of smooth level, spread Polypropylence Sheet, concrete constraint cracking frame 1 is positioned on the Polypropylence Sheet, in concrete constraint cracking frame 1, divide two-layer casting concrete 4.In this process, adopt manually to vibrate and guarantee that screw bolt 1-1 closely contacts with concrete 4.After 28 days or certain length of time, concrete 4 and concrete constraint cracking frame 1 are together holded up, be positioned on the bracing frame 3.With wire brush the test zone of concrete 4 is tied, removed surperficial laitance.Bore 4 hole 1-4 at test zone, corresponding with hole 2-9 respectively.Chloride permeability test unit 2 is placed concrete 4 both sides respectively, make the hole 1-4 of concrete slab and hole 2-9 point-blank.Cooperate with 4 bolt 2-4 and nut 2-8 then chloride permeability test unit 2 and concrete 4 are fixed together, guarantee that chloride permeability test unit 2 closely contacts with concrete 4, seals with glass cement at the two contact position 1-5 then.The NaCl solution of adding 3% in cathode chamber 2-6; The 2-7 of anode chamber adds the NaOH solution of 0.3mol/L, and impressed DC voltage is 60V, and power cathode is connected on the binding post 2-10 of cathode chamber 2-6, and positive source is connected on the binding post 2-2 of the 2-7 of anode chamber.Electric current by between reometer measurement binding post calculates electric flux and estimates the concrete anti-permeability performance of restrained condition compacted under.

Claims (8)

1. the proving installation of maturing anti-permeability performance under the restrained condition, it is characterized in that, comprise bracing frame (3), concrete constraint cracking frame (1) is housed on this bracing frame (3), on concrete constraint cracking frame (1), chloride permeability test unit (2) is housed; Described chloride permeability test unit (2) is made up of cathode chamber (2-6) and anode chamber (2-7), described cathode chamber (2-6) and anode chamber (2-7) included binding post (2-2,2-10) and electrode (2-3).
2. the proving installation of maturing anti-permeability performance is characterized in that under the restrained condition according to claim 1, and the arranged outside of described concrete constraint cracking frame (1) has many ribs (1-2).
3. the proving installation of maturing anti-permeability performance under the restrained condition according to claim 1, it is characterized in that, be equipped with the screw bolt (1-1) that a plurality of contractions to concrete (4) play effect of contraction between described concrete constraint cracking frame (1) and the concrete (4).
4. the proving installation of maturing anti-permeability performance is characterized in that under the restrained condition according to claim 1, and cathode chamber (2-6) and anode chamber (2-7) are symmetricly set on concrete constraint cracking frame (1) both sides.
5. the proving installation of maturing anti-permeability performance under the restrained condition according to claim 1, it is characterized in that, support frame as described above (3) comprises flat board (3-2) and vertical beam (3-1), described concrete constraint cracking frame (1) is fixed on the flat board (3-2), and described vertical beam (3-1) is positioned at concrete constraint cracking frame (1) both sides.
6. the proving installation of maturing anti-permeability performance is characterized in that under the restrained condition according to claim 1, includes louvre (2-5) on described cathode chamber (2-6) and anode chamber (2-7).
7. the proving installation of maturing anti-permeability performance is characterized in that under the restrained condition according to claim 1, is provided with glass cement between infiltration experiment device (2) and concrete (4) contact position (1-5).
8. the proving installation of maturing anti-permeability performance is characterized in that under the restrained condition according to claim 3, and described screw bolt (1-1) closely contacts with concrete (4).
CN 201120165084 2011-05-23 2011-05-23 Test device of hardened concrete imperviousness under constrained state Expired - Lifetime CN202083614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120165084 CN202083614U (en) 2011-05-23 2011-05-23 Test device of hardened concrete imperviousness under constrained state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120165084 CN202083614U (en) 2011-05-23 2011-05-23 Test device of hardened concrete imperviousness under constrained state

Publications (1)

Publication Number Publication Date
CN202083614U true CN202083614U (en) 2011-12-21

Family

ID=45344240

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120165084 Expired - Lifetime CN202083614U (en) 2011-05-23 2011-05-23 Test device of hardened concrete imperviousness under constrained state

Country Status (1)

Country Link
CN (1) CN202083614U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102297821A (en) * 2011-05-23 2011-12-28 中国水电顾问集团中南勘测设计研究院 Detection apparatus for impermeability of hardened concrete under constraint state, and method thereof
CN102721637A (en) * 2012-06-29 2012-10-10 浙江大学 Multi-functional test system and method for concrete durability under action of continuous pressure
CN110045096A (en) * 2019-05-27 2019-07-23 水利部交通运输部国家能源局南京水利科学研究院 Evaluation temperature gradient leads to the experimental rig and its method of concrete cracking
CN112924358A (en) * 2021-01-30 2021-06-08 新昌县恒大建设有限公司 Concrete impermeability testing device
CN112924358B (en) * 2021-01-30 2024-04-30 新昌县恒大建设有限公司 Concrete impermeability test device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102297821A (en) * 2011-05-23 2011-12-28 中国水电顾问集团中南勘测设计研究院 Detection apparatus for impermeability of hardened concrete under constraint state, and method thereof
CN102721637A (en) * 2012-06-29 2012-10-10 浙江大学 Multi-functional test system and method for concrete durability under action of continuous pressure
CN102721637B (en) * 2012-06-29 2014-06-04 浙江大学 Multi-functional test system and method for concrete durability under action of continuous pressure
CN110045096A (en) * 2019-05-27 2019-07-23 水利部交通运输部国家能源局南京水利科学研究院 Evaluation temperature gradient leads to the experimental rig and its method of concrete cracking
CN112924358A (en) * 2021-01-30 2021-06-08 新昌县恒大建设有限公司 Concrete impermeability testing device
CN112924358B (en) * 2021-01-30 2024-04-30 新昌县恒大建设有限公司 Concrete impermeability test device

Similar Documents

Publication Publication Date Title
CN102297821B (en) Detection apparatus for impermeability of hardened concrete under constraint state, and method thereof
CN202083614U (en) Test device of hardened concrete imperviousness under constrained state
CN101718671B (en) Loading device for testing permeability of concrete chloride ions and test method
CN102564916A (en) Fast load testing device and method for chloride ion migration coefficient of concrete
CN107894437B (en) Method for monitoring hydration process of concrete expansion joint construction in severe cold area
CN209760459U (en) Wall embedded part
CN209894883U (en) Concrete resistivity measuring device under steam curing condition
CN218629424U (en) Full-automatic permeameter for concrete permeation resistance test
CN110954467A (en) Simulation acceleration test method and device for aging of reinforced concrete test piece
CN215282577U (en) Cement pouring equipment for cement telegraph pole
CN209040286U (en) A kind of steel concrete assembled connecting node
CN205991914U (en) A kind of monolateral freezing-thawing test specimen molding mould of concrete
CN109060870B (en) Device and method for monitoring early-stage freezing and icing of concrete
CN207633573U (en) A kind of novel anti-buckling combined steel plate shearing force wall
CN208702168U (en) A kind of thickness of concrete floor control device
CN204649194U (en) Inserted angle steel gradient measure and control device
CN208183801U (en) A kind of pumped well port control cabinet connector
CN220814781U (en) Assembled stair installation positioner
CN216664187U (en) Building structure design has limit function's wall column foot quick connecting device
CN205295916U (en) RPC leveling board
CN205713451U (en) Board plug type enclosure wall
CN212722301U (en) Concrete anti-cracking performance detection device
CN110186964B (en) Device and method for testing corrosion macro current of steel bar in concrete
CN202957461U (en) Connecting base of distribution cabinet
CN210263033U (en) Pile foundation reinforcing apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER GROUP ZHONGNAN INVESTIGATION DESIGN +

Free format text: FORMER NAME: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Owner name: HYDROCHINA ZHONGNAN ENGINEERING CORPORATION

Free format text: FORMER NAME: ZHONGNAN PROSPECTING DESIGN INST. CHINA HYDRAUELECTRIC CONSULTANT GROUP

CP01 Change in the name or title of a patent holder

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: POWERCHINA ZHONGNAN ENGINEERING Corp.,Ltd.

Address before: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee before: HYDROCHINA ZHONGNAN ENGINEERING Corp.

CP03 Change of name, title or address

Address after: 410014 Hunan province Changsha Yuhua District, camphor Road No. 16

Patentee after: HYDROCHINA ZHONGNAN ENGINEERING Corp.

Address before: 410014, 9 camphor Road, Yuhua District, Hunan, Changsha

Patentee before: Mid-South Hydroelectric Investigation & Design Institute of China Hydropower Engineering Consulting Group

CX01 Expiry of patent term

Granted publication date: 20111221

CX01 Expiry of patent term