CN202081819U - Ice-preventive blasting ice drill for Yellow river channels - Google Patents

Ice-preventive blasting ice drill for Yellow river channels Download PDF

Info

Publication number
CN202081819U
CN202081819U CN201120173583XU CN201120173583U CN202081819U CN 202081819 U CN202081819 U CN 202081819U CN 201120173583X U CN201120173583X U CN 201120173583XU CN 201120173583 U CN201120173583 U CN 201120173583U CN 202081819 U CN202081819 U CN 202081819U
Authority
CN
China
Prior art keywords
ice
gearbox
drill
frame
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120173583XU
Other languages
Chinese (zh)
Inventor
常宏伟
杜伟华
袁云
铉炜
袁峰
孙继铮
高原
王强
刘其鑫
马强
Original Assignee
常宏伟
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 常宏伟 filed Critical 常宏伟
Priority to CN201120173583XU priority Critical patent/CN202081819U/en
Application granted granted Critical
Publication of CN202081819U publication Critical patent/CN202081819U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses an ice-preventive blasting ice drill for Yellow river channels, which comprises a framework. Four travel wheels are mounted at the bottom of the framework, two guide rails are respectively mounted on the left side and the right side of the framework symmetrically, guide sleeves are movably mounted on the guide rail, a transmission gear is mounted between the two guide sleeves, a motor is mounted on the upper portion of the transmission gear, a drill rod is mounted on the lower portion of the transmission gear, an output shaft of the motor is connected with an input shaft of the transmission gear, the upper end of the drill rod is connected with an output shaft of the transmission gear, a drill bit is mounted at the lower end of the drill rod, four hole drilling hydraulic cylinders are mounted on the upper portion of the framework, two connecting plates are respectively disposed on two lateral walls of each guide sleeve, the four connecting plates are correspondingly connected with piston rods of the four hole drilling hydraulic cylinders one by one, supporting hydraulic cylinders are mounted at lower ends of the guide rails, and supporting plates are mounted on piston rods of the supporting hydraulic cylinders. The ice-preventive blasting ice drill can replace manual operation to drill ice holes quickly and high-efficiently on ice of a river channel so as to find a place for explosive materials, can meet requirements of speediness and high efficiency of ice blasting, and accordingly can solve problems of the prior art.

Description

The Yellow River Channel explosion ice driller of reducing the menace of ice run
Technical field
The utility model relates to a kind of Yellow River Channel explosion ice driller of reducing the menace of ice run.
Background technology
At present, the conventional means that Yellow River Channel is reduced the menace of ice run winter is explosion, but for a long time, and the work that drills through the ice hole of settling explosive on river course ice face is got by the manual cutter of staff and finished.Artificial cutter get not only inefficiency and labour intensity big, can not satisfy ice slush explosion requirement rapidly and efficiently.
The utility model content
The purpose of this utility model, provide a kind of Yellow River Channel explosion ice driller of reducing the menace of ice run, its alternative manually drilling through fast on river course ice face is iced the hole so that settle explosive high rate, can satisfy ice slush explosion requirement rapidly and efficiently, thereby can solve the problem that prior art exists.
The purpose of this utility model is achieved through the following technical solutions: the Yellow River Channel explosion ice driller of reducing the menace of ice run, comprise frame, and four road wheels are installed in the bottom of frame, and four road wheels are positioned at the Si Jiaochu of frame; Bilateral symmetry is respectively installed a guide rail on the frame, the movable fairlead of installing on each guide rail, between two fairleads gearbox is installed, motor is installed on the top of gearbox, drilling rod is installed in the bottom of gearbox, the output shaft of motor is connected with the power shaft of gearbox, and the upper end of drilling rod is connected with the output shaft of gearbox, and drill bit is installed in the lower end of drilling rod; Four bore liquid cylinder pressures are installed on the top of frame, respectively are provided with a junction plate on the two side of each fairlead, and the piston rod of four junction plates and four bore liquid cylinder pressures connects one to one; Supporting cylinder is installed in the lower end of guide rail, on the piston rod of supporting cylinder gripper shoe is installed; On the sidewall of frame controller is installed.
For further realizing the purpose of this utility model, can also realize by the following technical solutions: first side steering roll, second side steering roll and the 3rd side steering roll are installed in the inside of fairlead, and first side steering roll, second side steering roll and the 3rd side steering roll cooperate with guide rail respectively.Gearbox each side offer a gathering sill, respectively be provided with a cross rail on each fairlead, cross rail and gathering sill be corresponding matching one by one; The leading screw support is installed on one of them fairlead, leading screw and motor are installed on the leading screw support, second gear is installed on the leading screw, first gear is installed on the output shaft of motor, first gear and second gears engaged, nut is installed at the top of gearbox, and nut is connected with threads of lead screw.
Good effect of the present utility model is: it has liftable gripper shoe, when non-boring work, gripper shoe can be risen, and road wheel lands, and conveniently moves described ice driller; When boring work, gripper shoe can be lifted described ice driller integral body, makes road wheel liftoff, thereby makes described ice driller more stable in boring procedure, drilling efficiency and better quality.In addition, his drill bit frame is relatively adjusted the position, can only move boring to select best bore position under the motionless situation of frame, can further improve drilling accuracy and drilling efficiency.
Description of drawings
Fig. 1 is the reduce the menace of ice run structural representation of explosion ice driller of Yellow River Channel described in the utility model; Fig. 2 is the A-A sectional structure schematic diagram of Fig. 1.Reference numeral: 1 frame, 2 gearboxes, 3 fairleads, 4 junction plates, 5 bore liquid cylinder pressures, 6 guide rails, 7 road wheels, 8 supporting cylinders, 9 gripper shoes, 10 drill bits, 11 drilling rods, 12 motors, 13 controllers, 14 first side steering rolls, 15 second side steering rolls 16 the 3rd side steering roll, 17 leading screw supports, 18 motor, 19 first gears, 20 second gears, 21 leading screws, 22 gathering sills, 23 cross rails, 24 nuts.
The specific embodiment
The Yellow River Channel described in the utility model explosion ice driller of reducing the menace of ice run, as shown in Figure 1, comprise frame (1), four road wheels (7) are installed in the bottom of frame (1), four road wheels (7) are positioned at the Si Jiaochu of frame (1), and road wheel (7) can just move described ice driller to required bore position; As shown in Figure 1, frame (1) goes up bilateral symmetry a guide rail (6) respectively is installed, each guide rail (6) is gone up the movable fairlead (3) of installing, fairlead (3) the vertical reduction of guide rail (6) relatively, gearbox (2) is installed between two fairleads (3), gearbox (2) is fixedlyed connected with two fairleads (3), motor (12) is installed on the top of gearbox (2), drilling rod (11) is installed in the bottom of gearbox (2), the output shaft of motor (12) is connected with the power shaft of gearbox (2), the upper end of drilling rod (11) is connected with the output shaft of gearbox (2), and drill bit (10) is installed in the lower end of drilling rod (11).Four bore liquid cylinder pressures (5) are installed on the top of frame (1), respectively are provided with a junction plate (4) on the two side of each fairlead (3), and as shown in Figure 2, four junction plates (4) connect one to one with the piston rod of four bore liquid cylinder pressures (5); Supporting cylinder (8) is installed in the lower end of guide rail (6), and gripper shoe (9) is installed on the piston rod of supporting cylinder (8); Controller (13) is installed on the sidewall of frame (1).Described controller is equipped with existing control device such as existing programmable logic controller, single-chip microcomputer in (13), and the hydraulic means that can control bore liquid cylinder pressure (5) and supporting cylinder (8) action is installed.
When needing on river course ice face, to hole, described ice driller is moved to desired location, by controller (13) control supporting cylinder (8) action, supporting cylinder (8) promotion gripper shoe (9) moves downward with the ice face and contacts, and utilizes supporting cylinder (8) and gripper shoe (9) that whole described ice driller is lifted, and makes road wheel (7) liftoff, at this moment, can guarantee that ice driller ice driller in ice face boring procedure can not move, guarantee the quality of holing to improve the efficient of boring.In boring procedure, by controller (13) keyhole hydraulic cylinder (5), bore liquid cylinder pressure (5) drives gearbox (2) and moves down along guide rail (6), so that drill bit (10) is constantly to the depths boring of ice face, simultaneously bore liquid cylinder pressure (5) to drill bit (10) the downward pressure of exerting pressure, can effectively improve the efficient of boring by gearbox (2) and drilling rod (11).
For reducing the friction that moves between fairlead (3) and the guide rail (6), guarantee fairlead (3) and the guide effect of guide rail (6) simultaneously to gearbox (2), gearbox (2) can steadily be risen or descend, as shown in Figure 2, first side steering roll (14), second side steering roll (15) and the 3rd side steering roll (16) are installed in the inside of fairlead (3), and first side steering roll (14), second side steering roll (15) and the 3rd side steering roll (16) cooperate with guide rail (6) respectively.
Because whole mobile described ice driller, be difficult to make quickly and accurately drill bit (10) to aim at the position of boring, therefore, for improving drilling accuracy and drilling efficiency, as depicted in figs. 1 and 2, gearbox (2) each side offer a gathering sill (22), respectively be provided with a cross rail (23) on each fairlead (3), cross rail (23) and gathering sill (22) be corresponding matching one by one, gearbox (2) can move horizontally under the cooperation guide effect of gathering sill (22) and cross rail (23), so that finely tune the position of drill bit (10), find the exact position of boring in the short time accurately.As shown in Figure 2, one of them fairlead (3) is gone up leading screw support (17) is installed, leading screw support (17) is gone up leading screw (21) and motor (18) is installed, leading screw (21) can rotate relative to leading screw support (17), motor (18) is fixedlyed connected with leading screw support (17), leading screw (21) is gone up second gear (20) is installed, first gear (19) is installed on the output shaft of motor (18), first gear (19) and second gear (20) engagement, nut (24) is installed at the top of gearbox (2), and nut (24) is threaded with leading screw (21).When need are finely tuned the position of drill bits (10), actuating motor (18), motor (18) drives leading screw (21) by first gear (19) and second gear (20) and rotates, and leading screw (21) drives gearbox (2) by nut (24) and moves horizontally along cross rail (23).
Technical scheme described in the utility model is not restricted in the scope of embodiment described in the utility model.The utility model not technology contents of detailed description is known technology.

Claims (3)

1. the Yellow River Channel explosion ice driller of reducing the menace of ice run, it is characterized in that: comprise frame (1), four road wheels (7) are installed in the bottom of frame (1), and four road wheels (7) are positioned at the Si Jiaochu of frame (1); Frame (1) goes up bilateral symmetry a guide rail (6) respectively is installed, each guide rail (6) is gone up the movable fairlead (3) of installing, gearbox (2) is installed between two fairleads (3), motor (12) is installed on the top of gearbox (2), drilling rod (11) is installed in the bottom of gearbox (2), the output shaft of motor (12) is connected with the power shaft of gearbox (2), and the upper end of drilling rod (11) is connected with the output shaft of gearbox (2), and drill bit (10) is installed in the lower end of drilling rod (11); Four bore liquid cylinder pressures (5) are installed on the top of frame (1), respectively are provided with a junction plate (4) on the two side of each fairlead (3), and four junction plates (4) connect one to one with the piston rod of four bore liquid cylinder pressures (5); Supporting cylinder (8) is installed in the lower end of guide rail (6), and gripper shoe (9) is installed on the piston rod of supporting cylinder (8); Controller (13) is installed on the sidewall of frame (1).
2. the Yellow River Channel according to claim 1 explosion ice driller of reducing the menace of ice run, it is characterized in that: first side steering roll (14), second side steering roll (15) and the 3rd side steering roll (16) are installed in the inside of fairlead (3), and first side steering roll (14), second side steering roll (15) and the 3rd side steering roll (16) cooperate with guide rail (6) respectively.
3. the Yellow River Channel according to claim 1 explosion ice driller of reducing the menace of ice run, it is characterized in that: gearbox (2) each side offer a gathering sill (22), respectively be provided with a cross rail (23) on each fairlead (3), cross rail (23) and gathering sill (22) be corresponding matching one by one; One of them fairlead (3) is gone up leading screw support (17) is installed, leading screw support (17) is gone up leading screw (21) and motor (18) is installed, leading screw (21) is gone up second gear (20) is installed, first gear (19) is installed on the output shaft of motor (18), first gear (19) and second gear (20) engagement, nut (24) is installed at the top of gearbox (2), and nut (24) is threaded with leading screw (21).
CN201120173583XU 2011-05-27 2011-05-27 Ice-preventive blasting ice drill for Yellow river channels Expired - Fee Related CN202081819U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120173583XU CN202081819U (en) 2011-05-27 2011-05-27 Ice-preventive blasting ice drill for Yellow river channels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120173583XU CN202081819U (en) 2011-05-27 2011-05-27 Ice-preventive blasting ice drill for Yellow river channels

Publications (1)

Publication Number Publication Date
CN202081819U true CN202081819U (en) 2011-12-21

Family

ID=45342455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120173583XU Expired - Fee Related CN202081819U (en) 2011-05-27 2011-05-27 Ice-preventive blasting ice drill for Yellow river channels

Country Status (1)

Country Link
CN (1) CN202081819U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835275A (en) * 2014-03-12 2014-06-04 卓仲表 Rapid icebreaking drilling mechanism
CN104329021A (en) * 2014-11-05 2015-02-04 余长青 Rotary disc drilling machine with guide function
CN107416204A (en) * 2016-04-11 2017-12-01 白伟华 A kind of unmanned plane for monitoring ice condition key element
CN108548612A (en) * 2018-03-08 2018-09-18 哈尔滨工程大学 Ice production apparatus is bored in a kind of experiment for measuring different depth Ice Temperature
CN108625774A (en) * 2018-06-15 2018-10-09 松辽水利委员会水文局黑龙江中游水文水资源中心 A kind of moveable vertical lifting bores icing equipment and bores ice method
CN108871122A (en) * 2018-06-14 2018-11-23 贵州大学 A kind of engineering explosion mounting device for facilitating detonator fixed point to place
CN109197808A (en) * 2018-10-16 2019-01-15 尤志翔 Icebreaking device is used in a kind of fishing of winter
CN109707308A (en) * 2019-01-03 2019-05-03 张家俊 A kind of exploration engineering drilling machine

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103835275A (en) * 2014-03-12 2014-06-04 卓仲表 Rapid icebreaking drilling mechanism
CN104329021A (en) * 2014-11-05 2015-02-04 余长青 Rotary disc drilling machine with guide function
CN107416204A (en) * 2016-04-11 2017-12-01 白伟华 A kind of unmanned plane for monitoring ice condition key element
CN108548612A (en) * 2018-03-08 2018-09-18 哈尔滨工程大学 Ice production apparatus is bored in a kind of experiment for measuring different depth Ice Temperature
CN108871122A (en) * 2018-06-14 2018-11-23 贵州大学 A kind of engineering explosion mounting device for facilitating detonator fixed point to place
CN108871122B (en) * 2018-06-14 2020-06-16 贵州大学 Make things convenient for engineering blasting that detonator fixed point was placed to use installation device
CN108625774A (en) * 2018-06-15 2018-10-09 松辽水利委员会水文局黑龙江中游水文水资源中心 A kind of moveable vertical lifting bores icing equipment and bores ice method
CN109197808A (en) * 2018-10-16 2019-01-15 尤志翔 Icebreaking device is used in a kind of fishing of winter
CN109197808B (en) * 2018-10-16 2021-08-27 瑞安市华澳绿康农业科技有限公司 Ice breaking device for fishing in winter
CN109707308A (en) * 2019-01-03 2019-05-03 张家俊 A kind of exploration engineering drilling machine
CN109707308B (en) * 2019-01-03 2020-07-31 铜陵市兆林工贸有限责任公司 Drilling machine for exploration engineering

Similar Documents

Publication Publication Date Title
CN202081819U (en) Ice-preventive blasting ice drill for Yellow river channels
CN101942963B (en) Vehicle hydraulic drill
CN201598973U (en) Translational power head of full hydraulic core drilling machine
CN202391432U (en) Rock drilling and slagging-off dual-purpose trolley for roadway
CN201841564U (en) Intelligent control multistation material forming machine
CN204248013U (en) A kind of novel hydraulic multiple drill press
CN202317106U (en) Special four-hole drill machine for anode bus of aluminum electrolysis cell
CN103470226B (en) High-efficiency and energy-saving type is without beam type double-well pumping unit
CN101942969A (en) Sliding frame of hydraulic drill
CN208594866U (en) Raise boring machine host assembly
CN103147437A (en) Section steel soil cement mixing pile with longitudinal displacement mechanism
CN201057045Y (en) Multi-bit rock drill
CN111014752A (en) Rotary type liftable drilling machine head structure
CN103273531A (en) Intelligent control single-station die-cutting forming machine
CN107445073B (en) Truck-mounted drilling rig combined type lifting device and application method
CN202367236U (en) Five-hole drilling machine special for drilling insulation intersection bus of aluminum electrolysis cell
CN202317107U (en) Six-hole drilling machine special for column drill holes of aluminum electrolytic cell
CN203257325U (en) Long spiral drilling machine
CN203875372U (en) Large-sized three-dimensional drilling machine
CN202689951U (en) Detachable geological drill bit
CN204712142U (en) Tire composite extrusion product line press-roller device
CN201574416U (en) Hydraulic grab bucket and continuous wall trenching tool employing same
CN201196023Y (en) Screw pile machine
CN201092848Y (en) Oil pump balancer
CN101074604A (en) Multi-bit rock driller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111221

Termination date: 20120527