CN202073719U - Connecting flange in tower barrel - Google Patents

Connecting flange in tower barrel Download PDF

Info

Publication number
CN202073719U
CN202073719U CN2011201230178U CN201120123017U CN202073719U CN 202073719 U CN202073719 U CN 202073719U CN 2011201230178 U CN2011201230178 U CN 2011201230178U CN 201120123017 U CN201120123017 U CN 201120123017U CN 202073719 U CN202073719 U CN 202073719U
Authority
CN
China
Prior art keywords
flange
stiffening plates
barrel
stiffened
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011201230178U
Other languages
Chinese (zh)
Inventor
承立新
周洪亮
卞建军
路超
吴希
卢迅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN HENGRUN HEAVY INDUSTRY CO., LTD.
Original Assignee
JIANGYIN HENGRUN FLANGE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN HENGRUN FLANGE CO Ltd filed Critical JIANGYIN HENGRUN FLANGE CO Ltd
Priority to CN2011201230178U priority Critical patent/CN202073719U/en
Application granted granted Critical
Publication of CN202073719U publication Critical patent/CN202073719U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model discloses a connecting flange in a tower barrel, which is used for a large wind power generation device and belongs to pipeline connecting pieces. The connecting flange in the tower barrel comprises barrel sections, and flange rings and a plurality of stiffening plates which are arranged in the barrel sections; a plurality of bolt holes are arranged in the flange rings; the stiffening plates are arranged at the front sides of the flange rings; the front end surfaces of the stiffening plates are provided with balanced contact surfaces; the stiffening plates are provided with two to three positioning stiffening plates which comprise stiffening plates with grooves and stiffening plates with extending sections; the stiffening plates with the grooves are matched and connected with the stiffening plates with the extending sections for positioning; and the barrel sections are conical. In the connecting flange, the barrel sections and the barrel sections of the tower barrel have the same conical degree, the stress of the flange is improved, the assembly and the installment are easy, the installing difficulty is reduced, and the smooth transition of tower barrel connection is ensured, so that the overall tower barrel is attractive, and the quality is stable. Simultaneously, maintaining times of the tower barrel of the wind generator are reduced.

Description

Adpting flange in a kind of tower tube
Technical field
The utility model relates to a kind of flange arrangement, is specifically related to a kind of adpting flange that is used in the large-scale wind generating equipment tower tube, belongs to pipe joint.
Background technique
At present, the Connecting format of domestic all wind power generating set tower tube is traditional thick swaged forging part flange and connects, blower fan tower barrel generally is divided into three to four joints up and down, the taper shell ring that is welded by the roll of steel plate circle, because the position that thick swaged forging part flange is connected with the tower tube is the straight section shell ring, this has just brought very big difficulty to stack mounting, and the profile after the combination is also attractive in appearance inadequately.Adpting flange as the patent No. 200720002665.1, it comprises: flanged plate, a plurality of stiffened plate, shell ring, on flanged plate, be provided with a plurality of bolts hole, each stiffened plate is positioned at the front side of flanged plate, and the front-end face of stiffened plate is provided with the balance surface of contact, and this adpting flange welds together by straight section shell ring and tower tube.So the difficulty of stack mounting is big, the protruding phenomenon of tower tube combination part is more obvious, and this has just influenced the outward appearance of tower tube integral body greatly.
The model utility content
The purpose of this utility model is to overcome defective of the prior art, provide a kind of and can reduce the wind-power tower installation cost, group to, install easily, tower tube overall appearance is attractive in appearance, the adpting flange in the stay-in-grade taper tower tube.
For achieving the above object, the technical solution of the utility model has provided the adpting flange in a kind of tower tube, it is characterized in that, described flange includes shell ring, be arranged at flange ring and several stiffened plates on the shell ring inwall, be provided with bolt hole between several stiffened plates on the described flange ring, each stiffened plate is positioned at the front side of flange ring, and the front-end face of stiffened plate is provided with the balance surface of contact, in described bolt hole, bolt is housed, in described several stiffened plates, be provided with 2~3 location stiffened plates, described location stiffened plate comprises stiffened plate that is provided with groove and the stiffened plate that is provided with prolonged section, and the described stiffened plate that is provided with groove is cooperatively interacted with the stiffened plate that is provided with prolonged section to be connected; Wherein said shell ring be shaped as taper.
In the utility model, the tapering of described tower tube shell ring is identical.
In the utility model, described flange ring and stiffened plate all are welded on the inwall of described tower tube.
Advantage of the present utility model and beneficial effect are: because shell ring and tower tube shell ring are same tapering, flange stressed played the improvement effect, group to, install easy, reduced installation difficulty, guaranteed seamlessly transitting of tower tube connection, made tower tube overall appearance attractive in appearance, steady quality.Reduced simultaneously blower fan tower barrel freedom from repairs number of times.
Description of drawings
Fig. 1 is the adpting flange perspective view in the utility model tower tube;
Fig. 2 is the cross-sectional view of Fig. 1;
Fig. 3 is the adpting flange tectonic maps in the utility model tower tube.
Embodiment
Below in conjunction with drawings and Examples, embodiment of the present utility model is further described.Following examples only are used for the technical solution of the utility model more clearly is described, and can not limit protection domain of the present utility model with this.
The utility model is the adpting flange in a kind of tower tube, this flange includes shell ring 1, be arranged at flange ring 2 and several stiffened plates 3 on shell ring 1 inwall, between several stiffened plates 3 on the described flange ring 2, be provided with bolt hole 4, each stiffened plate 3 is positioned at the front side of flange ring 2, and the front-end face of stiffened plate 3 is provided with balance surface of contact 5, in described bolt hole 4, bolt 6 is housed, in described several stiffened plates 3, be provided with 2~3 location stiffened plate 3-1, described location stiffened plate 3-1 comprises stiffened plate 3 that is provided with groove and the stiffened plate 3 that is provided with prolonged section, the described stiffened plate that is provided with groove cooperatively interacted with the stiffened plate that is provided with prolonged section to be connected, to be used for the butt joint location of tower tube shell ring; Wherein said shell ring 1 be shaped as taper.And the tapering of described tower tube shell ring is identical.Described flange ring 2 all is welded on the inwall of described tower tube with stiffened plate 3.During installation, the taper shell ring 1 on the flange is welded as a whole with the tower barrel, adopts high-strength bolt 6 to connect in upper and lower section tower tube and gets final product.
The above only is a preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite that does not break away from the utility model know-why; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (3)

1. the adpting flange in the tower tube, it is characterized in that, described flange includes shell ring, be arranged at flange ring and several stiffened plates on the shell ring inwall, be provided with bolt hole between several stiffened plates on the described flange ring, each stiffened plate is positioned at the front side of flange ring, and the front-end face of stiffened plate is provided with the balance surface of contact, in described bolt hole, bolt is housed, in described several stiffened plates, be provided with 2~3 location stiffened plates, described location stiffened plate comprises stiffened plate that is provided with groove and the stiffened plate that is provided with prolonged section, and the described stiffened plate that is provided with groove is cooperatively interacted with the stiffened plate that is provided with prolonged section to be connected; Wherein said shell ring be shaped as taper.
2. the adpting flange in the tower tube as claimed in claim 1 is characterized in that the tapering of described tower tube shell ring is identical.
3. the adpting flange in the tower tube as claimed in claim 2 is characterized in that described flange ring and stiffened plate all are welded on the inwall of described tower tube.
CN2011201230178U 2011-04-25 2011-04-25 Connecting flange in tower barrel Expired - Lifetime CN202073719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201230178U CN202073719U (en) 2011-04-25 2011-04-25 Connecting flange in tower barrel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201230178U CN202073719U (en) 2011-04-25 2011-04-25 Connecting flange in tower barrel

Publications (1)

Publication Number Publication Date
CN202073719U true CN202073719U (en) 2011-12-14

Family

ID=45111823

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201230178U Expired - Lifetime CN202073719U (en) 2011-04-25 2011-04-25 Connecting flange in tower barrel

Country Status (1)

Country Link
CN (1) CN202073719U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533731A (en) * 2014-11-11 2015-04-22 辽宁大金重工股份有限公司 Rib plate structure type wind power tower bottom flange
CN105952237A (en) * 2016-07-02 2016-09-21 山东华业风能设备有限公司 Composite material cable pylon and preparation method thereof
CN114962163A (en) * 2022-06-21 2022-08-30 福建工程学院 Quick centering wind power tower cylinder connection structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533731A (en) * 2014-11-11 2015-04-22 辽宁大金重工股份有限公司 Rib plate structure type wind power tower bottom flange
CN105952237A (en) * 2016-07-02 2016-09-21 山东华业风能设备有限公司 Composite material cable pylon and preparation method thereof
CN114962163A (en) * 2022-06-21 2022-08-30 福建工程学院 Quick centering wind power tower cylinder connection structure

Similar Documents

Publication Publication Date Title
CN202073719U (en) Connecting flange in tower barrel
CN203056133U (en) Wind power aluminum pipe bus joint structure
CN201705594U (en) Foundation reinforcing cage of wind generating set
CN202118418U (en) Butting device for pipeline with flange ends
CN201443476U (en) Tower cylinder for wind power generation
CN202690667U (en) Stud bolt
CN103953061B (en) A kind of offshore wind farm jacket frame foundation structure
CN201582262U (en) Counter balanced flange
CN206344089U (en) A kind of flange hole guiding mechanism
CN201661107U (en) Tower variable cross-section combined joint
CN215370115U (en) Split type wind power tower
CN205666570U (en) Cable protection tube
CN206329446U (en) A kind of guide flange structure
CN208039991U (en) A kind of power transmission tower abnormity flexible flange connecting node
CN205677342U (en) A kind of cross-arm on electric pole
CN205243731U (en) Wind power tower cylinder flange
CN202266379U (en) Flange for transitional section of wind power generation tower barrel
CN207261167U (en) A kind of variable pitch cabinet of wind generator system
CN203877351U (en) Connection structure of bucket wheel machine wheel body
CN203201728U (en) Improved type connecting structure of wind generating set tower cylinder and base connecting transition section
CN204001817U (en) Combined support frame
CN204419469U (en) A kind of tower cylinder connection set for Large-scale Wind Turbines
CN204003293U (en) The flange arrangement that a kind of anti-piling is impacted
CN204646508U (en) Efficient water turbine
CN201314135Y (en) Plate connection type single-column steel tube iron tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: JIANGYIN HENGRUN HEAVY INDUSTRY CO., LTD.

Free format text: FORMER NAME: JIANGYIN HENGRUN FLANGE CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 214423 A zone, European Industrial Park, Zhouzhuang Town, Jiangsu, Jiangyin, China

Patentee after: JIANGYIN HENGRUN HEAVY INDUSTRY CO., LTD.

Address before: 214423 A zone, European Industrial Park, Zhouzhuang Town, Jiangsu, Jiangyin, China

Patentee before: Jiangyin Hengrun Flange Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20111214

CX01 Expiry of patent term