CN202073580U - 树脂锚杆快速安装结构 - Google Patents

树脂锚杆快速安装结构 Download PDF

Info

Publication number
CN202073580U
CN202073580U CN2011201317171U CN201120131717U CN202073580U CN 202073580 U CN202073580 U CN 202073580U CN 2011201317171 U CN2011201317171 U CN 2011201317171U CN 201120131717 U CN201120131717 U CN 201120131717U CN 202073580 U CN202073580 U CN 202073580U
Authority
CN
China
Prior art keywords
resin
anchor rod
nut
capsule
explosive roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201317171U
Other languages
English (en)
Inventor
李伟
王乃国
张治高
刘善勇
赵荣学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINJULONG ENERGY CO Ltd
Original Assignee
SHANDONG XINJULONG ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINJULONG ENERGY CO Ltd filed Critical SHANDONG XINJULONG ENERGY CO Ltd
Priority to CN2011201317171U priority Critical patent/CN202073580U/zh
Application granted granted Critical
Publication of CN202073580U publication Critical patent/CN202073580U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本实用新型公开了一种树脂锚杆快速安装结构,它包括树脂药卷、高强锚杆体、托盘及阻尼螺帽,在托盘与阻尼螺帽之间设有减摩垫圈;所述的树脂药卷设计为前后两段,其中靠近孔底的树脂药卷为凝固时间小于5min的速凝药卷,另一段树脂药卷为凝固时间大于30min的缓凝药卷。本实用新型提高了锚杆的安装速度和井巷掘进效率;保证了井巷施工安全。

Description

树脂锚杆快速安装结构
技术领域
本实用新型涉及矿山井巷工程,尤其涉及井巷围岩支护锚杆。
背景技术
目前,矿山井巷主要采用锚杆支护,锚杆安装工艺是:钻孔→冲洗孔内积水及岩粉→用锚杆将树脂药卷送入孔底→将锚杆外露端插入钻机并开机搅拌树脂药卷→树脂药卷搅拌后需静止等待5~10min,凝固后再在锚杆外露端上套上托盘,拧固上螺帽并达到设计的预紧力。在此安装工艺过程中,主要问题是树脂药卷搅拌后需静止等待5~10min。由此带来了如下三方面的问题:
(1)降低了锚杆的安装速度,影响了井巷掘进效率;
(2)锚杆支护不及时,易造成围岩离层、危石移动或冒落,影响了井巷施工安全;
(3)降低了锚杆在孔内自由段的长度,减少了对围岩的主动支护范围,不利于围岩的有效控制。
发明内容
本实用新型为解决上述问题,设计了一种树脂锚杆快速安装结构。
本实用新型的结构是:它包括树脂药卷、高强锚杆体、托盘及螺帽,其特征在于,在螺帽的螺纹上注有阻尼剂形成阻尼螺帽,在托盘与阻尼螺帽之间设有减摩垫圈;所述的树脂药卷设计为前后两段,其中靠近孔底的树脂药卷为凝固时间小于5min的速凝药卷,另一段树脂药卷为凝固时间大于30min的缓凝药卷。
本实用新型的工作原理是:
(1)速凝药卷符合地温要求,在搅拌期间能快速发生凝固;缓凝药卷不受地温影响,搅拌后需较长时间(>30min)才开始发生凝固。
(2)减摩垫圈是采用合成橡胶制成,其抗压强度与设计的预紧力相匹配,当施加的预紧力达到设计值时,减摩垫圈被挤出或挤破,说明满足了预紧要求。
(3)阻尼螺帽的材质及外形与常规相同,但特点是在螺帽的螺纹内浇注了阻尼剂形成了阻尼螺帽。采用阻尼螺帽的目的是,当搅拌树脂药卷时,防止阻尼螺帽沿锚杆端部细螺纹转动,待速凝药卷搅拌期间发生凝固时,阻尼螺帽的阻尼堵头被锚杆端头拱出,随后阻尼螺帽被拧紧直至达到设计的预紧力为止。所以阻尼螺帽是实现锚杆快速安装的重要部件。
本实用新型的优点是:
(1)锚杆从搅拌树脂药卷到施加预紧力两者皆同步完成,支护效果好,节省了以往树脂药卷搅拌后的静止等待时间,从而大大提高了锚杆的安装效率;
(2)速凝药卷搅拌后需要较长时间才发生凝固,所以在施加预紧力时并不影响锚杆被药卷包裹段的弹性变形,从而扩大了锚杆对围岩的主动支护范围;
(3)锚杆快速安装后能及时支护围岩,而且增加了锚杆在孔内自由段的长度,提高了锚杆的约束范围,避免了围岩离层、危石移动或冒落,确保了井巷的施工安全。
附图说明
图1是本实用新型实施例的结构图。
图中:1-速凝药卷;2-缓凝药卷;3-高强锚杆体;4-托盘;5-减摩垫圈;6-阻尼螺帽,7-钻孔。
具体实施方式
如图1所示,本实用新型包括树脂药卷、高强锚杆体3、托盘4及阻尼螺帽6,在托盘4与阻尼螺帽6之间设有减摩垫圈5;从图中可以看出,所述的树脂药卷设计为前后两段,其中靠近钻孔7底部的树脂药卷为凝固时间小于5min的速凝药卷1,另一段树脂药卷为凝固时间大于30min的缓凝药卷2。

Claims (1)

1.一种树脂锚杆快速安装结构,它包括树脂药卷、高强锚杆体、托盘及螺帽,其特征在于,在螺帽的螺纹上注有阻尼剂形成阻尼螺帽,在托盘与阻尼螺帽之间设有减摩垫圈;所述的树脂药卷设计为前后两段,其中靠近孔底的树脂药卷为凝固时间小于5min的速凝药卷,另一段树脂药卷为凝固时间大于30min的缓凝药卷。
CN2011201317171U 2011-04-17 2011-04-17 树脂锚杆快速安装结构 Expired - Fee Related CN202073580U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201317171U CN202073580U (zh) 2011-04-17 2011-04-17 树脂锚杆快速安装结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201317171U CN202073580U (zh) 2011-04-17 2011-04-17 树脂锚杆快速安装结构

Publications (1)

Publication Number Publication Date
CN202073580U true CN202073580U (zh) 2011-12-14

Family

ID=45111687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201317171U Expired - Fee Related CN202073580U (zh) 2011-04-17 2011-04-17 树脂锚杆快速安装结构

Country Status (1)

Country Link
CN (1) CN202073580U (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107677167A (zh) * 2017-10-23 2018-02-09 山东建筑大学 可爆破扩孔及自动填充的软弱地层预应力锚固装置及工艺
CN109026102A (zh) * 2018-10-13 2018-12-18 西山煤电(集团)有限责任公司 煤矿井下顶板支护用树脂药卷快速安装枪

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107677167A (zh) * 2017-10-23 2018-02-09 山东建筑大学 可爆破扩孔及自动填充的软弱地层预应力锚固装置及工艺
CN109026102A (zh) * 2018-10-13 2018-12-18 西山煤电(集团)有限责任公司 煤矿井下顶板支护用树脂药卷快速安装枪
CN109026102B (zh) * 2018-10-13 2024-03-22 西山煤电(集团)有限责任公司 煤矿井下顶板支护用树脂药卷快速安装枪

Similar Documents

Publication Publication Date Title
CN202596756U (zh) 胀壳式高强度注浆锚杆
CN102644471B (zh) 封孔器及使用封孔器进行小孔径注浆锚固锚索的封孔方法
CN205477690U (zh) 一种防滑注浆锚杆
CN104500115B (zh) 一种预应力全长锚固锚杆支护方法
CN103590845A (zh) 一种防冲击间隔注浆锚索及其使用方法
CN104818723A (zh) 边坡支护用抗滑桩
CN103758549A (zh) 一种基于膏体材料的先灌后锚预应力全长锚固支护方法
CN103161484B (zh) 一种膏体定长锚固支护方法
CN104405424A (zh) 一种全长锚固的锚杆及锚固方法
CN106567722A (zh) 一种新型复合式可注浆锚杆
CN205370613U (zh) 一种利用双液注浆药卷实现高预应力全长锚固的锚杆
CN202073580U (zh) 树脂锚杆快速安装结构
CN107313794A (zh) 一种用于巷道支护的涨壳挤压摩擦锚杆
CN203962011U (zh) 一种分段锚固的岩石锚杆
CN201121522Y (zh) 挤注锚筒式锚杆
CN201679510U (zh) 钻注锚一体化锚杆
CN203584447U (zh) 一种防冲击间隔注浆锚索
CN103147777B (zh) 泵送膏体预应力全锚锚杆/索支护方法
CN205089343U (zh) 矿用高压注浆锚杆
CN205260061U (zh) 一种柔性膨胀型中空注浆锚杆
CN204804863U (zh) 自钻式可连接预应力注浆锚杆
CN205400775U (zh) 一种预应力注浆锚杆
CN104061010A (zh) 一种分段锚固的岩石锚杆
CN202882968U (zh) 无树脂多锚固点锚杆
CN105257325A (zh) 一种用于巷道围岩的锚杆锚固装置及其锚固方法

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111214

Termination date: 20140417