CN202072727U - Large-scale vertical spraying and blowing cooling device for heat treatment - Google Patents
Large-scale vertical spraying and blowing cooling device for heat treatment Download PDFInfo
- Publication number
- CN202072727U CN202072727U CN2011201575008U CN201120157500U CN202072727U CN 202072727 U CN202072727 U CN 202072727U CN 2011201575008 U CN2011201575008 U CN 2011201575008U CN 201120157500 U CN201120157500 U CN 201120157500U CN 202072727 U CN202072727 U CN 202072727U
- Authority
- CN
- China
- Prior art keywords
- cooling
- water
- cooling device
- scale
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model relates to a large-scale vertical spraying and blowing cooling device for heat treatment, which discloses a cooling device for heat treatment of large-scale ferrous metal casting and forging workpieces, in particular to a cooling device integrating water cooling and air cooling into a whole. Air storage cabins are arranged at both sides of a cooling tube body, air inlet pipes are arranged on the air storage cabins, and a water fog spray head is arranged on a vertical water supply pipe. The use method of the large-scale vertical spraying and blowing cooling device is the same as the existing cooling equipment. The large-scale vertical spraying and blowing cooling device is characterized in that the water cooling and air cooling functions are integrated into a whole, great significance is realized on the treatment of large-scale ferrous metal workpieces, because the workpieces have large sizes and heavy weight, a large amount of electric energy needs to be consumed during the moving, and the equipment loss also needs to be increased. The air cooling can be carried out, the water cooling can also be carried out, and the hoisting time and the motive power are omitted. The technical process is simplified, a large amount of electric energy is saved, and the production cost of enterprises is reduced. In addition, the device integrates the two functions into a whole, and the occupied area is also reduced. The large-scale vertical spraying and blowing cooling device belongs to the ideal spraying and blowing cooling device for the large-scale ferrous metal casting and forging workpieces.
Description
Technical field
What the utility model was announced is the refrigerating unit that the thermal treatment of large-scale ferrous metal casting forger part is used, and is meant specifically that a kind of cold-peace of catchmenting is air-cooled to be the refrigerating unit of one.
Background technology
Now for the thermal treatment refrigerating unit of the casting forger part of large-scale ferrous metal, roughly be divided into water-cooled and air-cooled two kinds, stream oriented device all be tube intravital around on be provided with several air outlets and waterfog head, during work processed workpiece is sling with the sky, put into the air cooling equipment cylindrical shell, start gas blower, earlier air cooling is carried out on the surface of workpiece and handled.Behind pending the finishing, also need to hang workpiece is hung out, put into water cooling plant again and carry out spray cooling with the sky.Because the processing capacity of stream oriented device is single, the working routine complexity causes the consumption of a large amount of electric energy and the loss of equipment, has improved the production cost of enterprise.Two devices will be set up respectively in addition, have also increased floor space and working space.
Summary of the invention
At last narration situation, the purpose of this utility model provides that a kind of to collect air-cooled and water-cooled function be the large-scale workpiece thermal treatment refrigerating unit of one, to solve the existing problem of existing installation.
The technical scheme that the utility model is taked for the solution existing installation is: have the ponding cylindrical shell in the bottom of apparatus main body, have water shoot on a side of ponding cylindrical shell.Have the cooling cylindrical shell on the top of ponding main body.Both sides at the cooling cylindrical shell have and hold the wind storehouse, hold on the wind storehouse to have blast pipe.On the inwall of cooling cylindrical shell, have air outlet.Air outlet with hold the wind storehouse and be connected, blast pipe links to each other with gas blower.On the cooling cylinder inboard wall, have water-supply pipe, have the water supply endless tube on the water-supply pipe, on the water supply endless tube, have the water supply standpipe, on the water supply standpipe, have waterfog head.Water-supply pipe is connected with working shaft.Using method of the present utility model is identical with existing cooling apparatus, is hung by the sky large-scale processed workpiece is put into the cooling cylindrical shell, takes any processing earlier according to processing requirement.As advanced sector-style deepfreeze, then start gas blower, air enters from blast pipe and holds the wind storehouse, blows out from air outlet workpiece is carried out air cooling.After treating that air cooling finishes, start water pump, water coolant enters water supply endless tube and water supply standpipe from water-supply pipe, from the waterfog head ejection, workpiece is carried out water cooling again.Waste water after the processing enters the ponding cylindrical shell, discharges from water shoot.Characteristics of the present utility model are that the air-cooled function of cold-peace of catchmenting is an one, have very big meaning for handling large-scale ferrous metal workpiece, because the workpiece volume and weight is big especially, moves and need expend a large amount of electric energy, also will increase the loss of equipment.Two functions of this device collection can be carried out air cooling on a device, can carry out water cooling again, have saved the time and the power of lifting.Simplify technological process, saved a large amount of electric energy, reduced enterprise's production cost.Two functions of this device collection are one in addition, have dwindled floor space again.It is the large-scale ferrous metal casting of a kind of ideal forger part spraying air blast refrigerating unit.
Description of drawings
Accompanying drawing is the utility model structural representation
1-blast pipe 2-holds wind storehouse 3-air outlet 4-water supply standpipe 5-cooling cylindrical shell 6-water supply endless tube 7-water-supply pipe 8-waterfog head 9-ponding cylindrical shell 10-water shoot
Embodiment
Now in conjunction with the accompanying drawings the utility model is described further: have ponding cylindrical shell 9 in the bottom of apparatus main body, on a side of ponding cylindrical shell, have water shoot 10.Have cooling cylindrical shell 5 on the top of ponding main body.Both sides at the cooling cylindrical shell have and hold wind storehouse 2, hold to have blast pipe 1 on the wind storehouse.On the inwall of cooling cylindrical shell, have air outlet 3.Air outlet with hold the wind storehouse and be connected, blast pipe links to each other with gas blower.On the cooling cylinder inboard wall, have water-supply pipe 7, have water supply endless tube 6 on the water-supply pipe, on the water supply endless tube, have water supply standpipe 4, on the water supply standpipe, have waterfog head 8.Water-supply pipe is connected with working shaft.
Claims (1)
1. thermal treatment is with large-scale vertical spraying air blast refrigerating unit, it is characterized in that: have ponding cylindrical shell (9) in the bottom of apparatus main body, on a side of ponding cylindrical shell, have water shoot (10), have cooling cylindrical shell (5) on the top of ponding main body, both sides at the cooling cylindrical shell have and hold wind storehouse (2), on the inwall of cooling cylindrical shell, have air outlet (3), on the cooling cylinder inboard wall, have water-supply pipe (7), have water supply endless tube (6) on the water-supply pipe, on the water supply endless tube, have water supply standpipe (4), on the water supply standpipe, have waterfog head (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201575008U CN202072727U (en) | 2011-05-10 | 2011-05-10 | Large-scale vertical spraying and blowing cooling device for heat treatment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201575008U CN202072727U (en) | 2011-05-10 | 2011-05-10 | Large-scale vertical spraying and blowing cooling device for heat treatment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202072727U true CN202072727U (en) | 2011-12-14 |
Family
ID=45110833
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201575008U Expired - Fee Related CN202072727U (en) | 2011-05-10 | 2011-05-10 | Large-scale vertical spraying and blowing cooling device for heat treatment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202072727U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102851480A (en) * | 2012-05-08 | 2013-01-02 | 济南重工股份有限公司 | Large mill half-gear cooling and quenching heat treatment device and method |
CN111545698A (en) * | 2020-05-13 | 2020-08-18 | 上海长特锻造有限公司 | Forging process of fuel common rail |
RU2756670C1 (en) * | 2020-08-12 | 2021-10-04 | федеральное государственное бюджетное образовательное учреждение высшего образования "Тольяттинский государственный университет" | Method for cooling low-rigidity long-length parts during thermal operations and apparatus for implementation thereof |
-
2011
- 2011-05-10 CN CN2011201575008U patent/CN202072727U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102851480A (en) * | 2012-05-08 | 2013-01-02 | 济南重工股份有限公司 | Large mill half-gear cooling and quenching heat treatment device and method |
CN102851480B (en) * | 2012-05-08 | 2014-06-25 | 济南重工股份有限公司 | Large mill half-gear cooling and quenching heat treatment device and method |
CN111545698A (en) * | 2020-05-13 | 2020-08-18 | 上海长特锻造有限公司 | Forging process of fuel common rail |
CN111545698B (en) * | 2020-05-13 | 2021-11-19 | 上海长特锻造有限公司 | Forging process of fuel common rail |
RU2756670C1 (en) * | 2020-08-12 | 2021-10-04 | федеральное государственное бюджетное образовательное учреждение высшего образования "Тольяттинский государственный университет" | Method for cooling low-rigidity long-length parts during thermal operations and apparatus for implementation thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203668425U (en) | Tank cleaning device | |
CN202072727U (en) | Large-scale vertical spraying and blowing cooling device for heat treatment | |
CN203141323U (en) | Sand-blasting machine for inner wall of steel pipe | |
CN101898332B (en) | Steel surface derusting device | |
CN202823949U (en) | Washing device used for cleaning forging surface | |
CN109136961A (en) | A kind of metal wire rod pickler | |
CN102886744A (en) | Shot blasting machine | |
CN201711866U (en) | Surface dust cleaning device of steel materials | |
CN202804144U (en) | Cooling mechanism of cast-welding bottom die of cast-welding machine for battery of electric bicycle | |
CN205966390U (en) | Drench oily corrosion prevention device | |
CN202317261U (en) | Sawing machine blanking plate | |
CN210242518U (en) | Array type heat absorption assembly | |
CN205495849U (en) | Waste heat recovery formula cyclone | |
CN205192152U (en) | Modified panel drying chamber | |
CN203710851U (en) | Environment-friendly exhaust gas purification circulating system for dyeing and finishing | |
CN202928391U (en) | Closed cooling tower | |
CN105087876A (en) | Metallurgical cooling mechanism with mist elimination function | |
CN202700876U (en) | Ultrasonic cleaning machine | |
CN208091301U (en) | A kind of efficient heat power plant boiler inside pipe wall removal of deposit device | |
CN207904336U (en) | A kind of aluminium wheels aluminium skimmings clean and reuse device | |
CN204843693U (en) | Aluminium bits recovery unit in machine tooling of aluminum alloy hub | |
CN215615063U (en) | Novel configuration of casting shop | |
CN202279693U (en) | High-purity purification equipment for nitrogen | |
CN109171564A (en) | It is a kind of for supply with nano bubble treatment liquid device | |
CN211373338U (en) | Water-saving closed cooling tower fin belt cleaning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111214 Termination date: 20160510 |
|
CF01 | Termination of patent right due to non-payment of annual fee |