CN202056486U - Communication case installation system for metal mast - Google Patents

Communication case installation system for metal mast Download PDF

Info

Publication number
CN202056486U
CN202056486U CN2011201723175U CN201120172317U CN202056486U CN 202056486 U CN202056486 U CN 202056486U CN 2011201723175 U CN2011201723175 U CN 2011201723175U CN 201120172317 U CN201120172317 U CN 201120172317U CN 202056486 U CN202056486 U CN 202056486U
Authority
CN
China
Prior art keywords
bolt
hook
hole
metal mast
fixed block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201723175U
Other languages
Chinese (zh)
Inventor
谭小东
肖相余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NTS Technology Chengdu Co Ltd
Original Assignee
NTS Technology Chengdu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NTS Technology Chengdu Co Ltd filed Critical NTS Technology Chengdu Co Ltd
Priority to CN2011201723175U priority Critical patent/CN202056486U/en
Application granted granted Critical
Publication of CN202056486U publication Critical patent/CN202056486U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a communication case installation system for a metal mast, which mainly comprises the metal mast, a hold hoop and a main fixing piece which are simultaneously clamped on the outer wall of the metal mast, and a communication case which is connected onto the main fixing piece through a connecting piece; and the hold hoop is simultaneously connected with the main fixing piece. The communication case installation system for the metal mast has the beneficial effects that: (1) the installation and the operation are simple; (2) the structure is simple, and the material of a metal mast installation piece can be used; and (3) a processing technology is simple, and the cost is low.

Description

A kind of communication machine box installation system that is used for the metal mast
Technical field
The utility model relates to a kind of communication machine box installation system that is used for the metal mast, specifically is meant a kind of cabinet installation system that is arranged on the outdoor metal mast.
Background technique
The mounting type of outdoor cabinet mainly contains at present: the metal mast is installed, the extension wall is installed, channel-section steel is installed, angle steel is installed; These modes can be applicable to the installation of densely inhabited district and macro base station from far-off regions.
Wherein the metal mast is installed, and usually there are the following problems when mounted.1, installing inconveniently, is to adopt the bolt ways of connecting mostly, 2, complex structure, owing to be to adopt the bolt ways of connecting mostly, therefore need add a lot of support linkage structures, and 3, operation is loaded down with trivial details, the construction period time is long, 4 dismounting inconveniences.
The model utility content
The purpose of this utility model is to provide a kind of outdoor metal mast that is used for, and processing technology is simple, and cost is low, and communication machine box installation system simple to operation.
The purpose of this utility model is achieved through the following technical solutions: a kind of communication machine box installation system that is used for the metal mast, mainly by the metal mast, and grip simultaneously in the anchor ear of metal mast outer wall and main fixed block and the communication machine box that is connected on the main fixed block by link and constitute, described anchor ear is connected with main fixed block simultaneously.
Be connected by first bolt between described anchor ear and the main fixed block, and the groove bottom of described anchor ear has first bolt hole that is complementary with first bolt, main fixed block has second bolt hole that is complementary with first bolt, and first bolt runs through simultaneously and is arranged in first bolt hole and second bolt hole.
Described link is to have the mounting bracket that on-hook is colluded, and described on-hook is colluded and is provided with the fastening screw through hole; Main fixed block is provided with respectively and colludes the on-hook groove that is complementary with the fastening screw through hole and cooperate the fastening screw through hole with on-hook; Mounting bracket colludes to be articulated in the on-hook groove by on-hook and is connected with main fixed block, cooperates simultaneously to connect in fastening screw through hole and the fastening screw through hole to be provided with bolt.
Described mounting bracket also is provided with the on-hook hole, and runs through in the on-hook hole and be provided with the on-hook bolt that is complementary with the on-hook hole, and described mounting bracket is connected with communication machine box by the on-hook bolt.
Described main fixed block has first inner groovy that matches with the metal mast away from mounting bracket one end, and the described first inner groovy groove face is offered and is equipped with some projections.
Described anchor ear is the channel steel shape metalwork, and the groove side of described anchor ear has second inner groovy that matches with the metal mast, and the described second inner groovy groove face is offered and is equipped with some projections.
The installation steps of native system are.
1, general on-hook bolt adopts the socket head screw of 4 M6X16, by the on-hook bolt mounting bracket is installed on the communication machine box.
2, communication machine box and mounting bracket lifting are arrived and main fixed block position.
3, anchor ear and main fixed block are bolted on the metal mast by first, and general first bolt is that two hexagon head bolt models are M12X180.
4, mounting bracket is articulated on the main fixed block, and it is fastening to adopt bolt that link position is carried out, general bolt adopts 4 M6X16 socket head screws fastening.
In sum, the beneficial effects of the utility model are: 1, fitting operation is simple; 2, simple in structure, can utilize the metal mast to install; 3, processing technology is simple, and cost is low.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the utility model metal mast, main fixed block, anchor ear connection diagram.
Fig. 3 is the connection diagram of the utility model mounting bracket and communication machine box.
Fig. 4 is the structural representation of the utility model master fixed block.
Fig. 5 is the structural representation of the utility model anchor ear.
Mark and corresponding component title in the accompanying drawing: 1, metal mast; 2, main fixed block; 3, anchor ear; 31, groove side; 32, groove bottom; 320, first bolt hole; 25, second bolt hole; 24, first bolt; 6, mounting bracket; 52, on-hook groove; 61, on-hook is colluded; 62, on-hook hole; 63, on-hook bolt; 7, communication machine box; 23, first inner groovy; 310, second inner groovy; 22, cooperate fastening screw through hole, 64, bolt; 65, fastening screw through hole.
Embodiment
Below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, but mode of execution of the present utility model is not limited only to this.
Embodiment one
Shown in Fig. 1,2,3,4,5, a kind of communication machine box installation system that is used for the metal mast, mainly by metal mast 1, and grip simultaneously in the anchor ear 3 of metal mast 1 outer wall and main fixed block 2 and the communication machine box 7 that is connected on the main fixed block 2 by link and constitute, described anchor ear 3 is connected with main fixed block 2 simultaneously.
Be connected by first bolt 24 between anchor ear 3 and the main fixed block 2, and the groove bottom 32 of described anchor ear 3 has first bolt hole 320 that is complementary with first bolt 24, main fixed block 2 has second bolt hole, 25, the first bolts 24 that are complementary with first bolt 24 to be run through simultaneously and is arranged in second bolt hole 25 and first bolt hole 320.First bolt 24 is that two hexagon head bolt models are M12X180, and anchor ear 3 and main fixed block 2 are fixed on the metal mast 1 by first bolt 24.
Link is to have on-hook to collude 61 mounting bracket 6, and described on-hook is colluded 61 and is provided with fastening screw through hole 65; Main fixed block 2 is provided with respectively with on-hook and colludes 61 and the on-hook groove 21 that is complementary of fastening screw through hole 65 and cooperate fastening screw through hole 22; Mounting bracket 6 colludes 61 by on-hook and is articulated in the on-hook groove 21 and is connected with main fixed block 2, cooperates fastening screw through hole 22 and the 65 interior perforations of fastening screw through hole to be provided with bolt 64 simultaneously.When being articulated in mounting bracket 6 on the main fixed block 2, and it is fastening to adopt bolt 64 that link position is carried out, and bolt adopts 4 M6X16 socket head screws fastening.
Mounting bracket 6 also is provided with on-hook hole 62, and runs through in the on-hook hole 62 and be provided with the on-hook bolt 63 that is complementary with on-hook hole 62, and described mounting bracket 6 is connected with communication machine box 7 by on-hook bolt 63.On-hook bolt 63 adopts the socket head screw of 4 M6X16, by on-hook bolt 63 mounting bracket 6 is installed on the communication machine box 7.
Main fixed block 2 has first inner groovy 23 that matches with metal mast 1 away from mounting bracket 6 one ends, and described first inner groovy, 23 groove faces are offered and are equipped with some projections.
Anchor ear 3 is the channel steel shape metalwork, and the groove side 31 of described anchor ear 3 has second inner groovy 310 that matches with metal mast 1, and described second inner groovy, 310 groove faces are offered and are equipped with some projections.
Take aforesaid way, just can realize the utility model preferably.

Claims (6)

1. communication machine box installation system that is used for the metal mast, it is characterized in that, mainly by metal mast (1), and grip simultaneously in the anchor ear (3) of metal mast (1) outer wall and main fixed block (2) and the communication machine box (7) that is connected on the main fixed block (2) by link and constitute, described anchor ear (3) is connected with main fixed block (2) simultaneously.
2. according to the described a kind of communication machine box installation system that is used for the metal mast of claim 1, it is characterized in that, be connected by first bolt (24) between described anchor ear (3) and the main fixed block (2), and the groove bottom (32) of described anchor ear (3) has first bolt hole (320) that is complementary with first bolt (24), main fixed block (2) has second bolt hole (25) that is complementary with first bolt (24), and first bolt (24) runs through simultaneously and is arranged in second bolt hole (25) and first bolt hole (320).
3. according to the described a kind of communication machine box installation system that is used for the metal mast of claim 1, it is characterized in that described link colludes the mounting bracket of (61) (6) for having on-hook, and described on-hook is colluded (61) and is provided with fastening screw through hole (65); Main fixed block (2) is provided with and colludes the on-hook groove (21) that (61) and fastening screw through hole (65) be complementary respectively with on-hook and cooperate fastening screw through hole (22); Mounting bracket (6) colludes (61) by on-hook and is articulated in and is connected with main fixed block (2) in the on-hook groove (21), cooperates the interior perforation of fastening screw through hole (22) and fastening screw through hole (65) to be provided with bolt (64) simultaneously.
4. according to the described a kind of communication machine box installation system that is used for the metal mast of claim 3, it is characterized in that, described mounting bracket (6) also is provided with on-hook hole (62), and run through being provided with the on-hook bolt (63) that is complementary with on-hook hole (62) in on-hook hole (62), described mounting bracket (6) is connected with communication machine box (7) by on-hook bolt (63).
5. according to any described a kind of communication machine box installation system that is used for the metal mast in the claim 3, it is characterized in that, described main fixed block (2) has first inner groovy (23) that matches with metal mast (1) away from mounting bracket (6) one ends, and described first inner groovy (23) groove face is offered and is equipped with some projections.
6. according to any described a kind of communication machine box installation system that is used for the metal mast among the claim 1-5, it is characterized in that, described anchor ear (3) is the channel steel shape metalwork, and the groove side (31) of described anchor ear (3) has second inner groovy (310) that matches with metal mast (1), and described second inner groovy (310) groove face is offered and is equipped with some projections.
CN2011201723175U 2011-05-26 2011-05-26 Communication case installation system for metal mast Expired - Fee Related CN202056486U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201723175U CN202056486U (en) 2011-05-26 2011-05-26 Communication case installation system for metal mast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201723175U CN202056486U (en) 2011-05-26 2011-05-26 Communication case installation system for metal mast

Publications (1)

Publication Number Publication Date
CN202056486U true CN202056486U (en) 2011-11-30

Family

ID=45016458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201723175U Expired - Fee Related CN202056486U (en) 2011-05-26 2011-05-26 Communication case installation system for metal mast

Country Status (1)

Country Link
CN (1) CN202056486U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691868A (en) * 2012-05-28 2012-09-26 华为技术有限公司 Mounting part and modules
CN105508850A (en) * 2016-01-06 2016-04-20 山东康威通信技术股份有限公司 Pole suspension device for outdoor tank and application method thereof
CN110636726A (en) * 2018-06-25 2019-12-31 中兴通讯股份有限公司 Fixing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102691868A (en) * 2012-05-28 2012-09-26 华为技术有限公司 Mounting part and modules
CN102691868B (en) * 2012-05-28 2014-03-05 华为技术有限公司 Mounting part and modules
US9371961B2 (en) 2012-05-28 2016-06-21 Huawei Technologies Co., Ltd. Installation part and module
CN105508850A (en) * 2016-01-06 2016-04-20 山东康威通信技术股份有限公司 Pole suspension device for outdoor tank and application method thereof
CN110636726A (en) * 2018-06-25 2019-12-31 中兴通讯股份有限公司 Fixing device

Similar Documents

Publication Publication Date Title
CN201310169Y (en) Connecting structure of wall decorative plate and wall
CN201706162U (en) Wall-mounted video surveillance camera support
CN202056486U (en) Communication case installation system for metal mast
CN201061447Y (en) Wall hanging switching equipment
CN102367704A (en) Concrete pouring construction method for steel plate embedded part
CN204903939U (en) Multi -functional frame curtain
CN201787204U (en) E-type special cable bridge support
CN201712435U (en) Front support frame of back plate spring
CN202035114U (en) Installation system for outdoor communication case
CN201967260U (en) Equipment shell
CN204940706U (en) Anti-floating assembly fixed by a kind of reinforcing bar
CN202767136U (en) Deviation rectification device for double-wheel slot milling machine
CN204592635U (en) A kind of flange with pile body mounting hole mould
CN204402038U (en) A kind of aluminum alloy mould plate connects tobacco pipe
CN202082571U (en) Embedded display screen mounting seat
CN204592633U (en) A kind of flange with pile body mounting hole mould
CN205025871U (en) Mechanical connecting piece
CN204700274U (en) A kind of die casting of consumable accessory able to quickly change
CN202035237U (en) Installation system used for communication case on wall surface
CN204989559U (en) Joint formula fiber reel is around device
CN2937250Y (en) Foundation of universal tower machine
CN201472237U (en) Installation structure of automobile tail lamp
CN208923803U (en) A kind of support construction of cable branch box
CN205077662U (en) But adjusting device below stone material and porcelain plate curtain plate
CN201194454Y (en) Machine cabinet mounting ear

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHENGDU NTS TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: NTS TECHNOLOGY HENGDU CO. LTD.

CP03 Change of name, title or address

Address after: 610000, Sichuan Chengdu hi tech Zone Tianfu road hi tech incubator park information security base 3 and 4 floor

Patentee after: Chengdu NTS Technology Co., Ltd.

Address before: 610000 Sichuan Chengdu hi tech Development Zone Tianfu road hi tech incubator park information security base 3 and 4 Building

Patentee before: NTS Technology (Chengdu) Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111130

Termination date: 20130526