CN202047262U - Steam recycling system for production - Google Patents
Steam recycling system for production Download PDFInfo
- Publication number
- CN202047262U CN202047262U CN2011200896016U CN201120089601U CN202047262U CN 202047262 U CN202047262 U CN 202047262U CN 2011200896016 U CN2011200896016 U CN 2011200896016U CN 201120089601 U CN201120089601 U CN 201120089601U CN 202047262 U CN202047262 U CN 202047262U
- Authority
- CN
- China
- Prior art keywords
- steam
- pipeline
- production
- communicated
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices For Medical Bathing And Washing (AREA)
Abstract
The utility model belongs to the field of clothes processing and particularly relates to a steam recycling system for production. The steam recycling system comprises a steam heating system of a boiler and a water storage tank communicated with the boiler, the steam heating system is connected with a trimmer for production through a sub-drum and a steam pipeline. The steam recycling system for production is characterized in that the terminal of the steam pipeline is connected with a steam trap; and a water outlet of the steam trap is connected with a pipeline communicated with a common bathing pool. The steam recycling system for production has the beneficial effects that the water outlet of the steam trap is connected with the pipeline communicated with the common bathing pool and the pipeline communicated with the water storage tank respectively in parallel, the remain boiler steam can be divided into two parts to be reasonably used, one part of the steam is led to a pool of a staff bathroom to heat the water in the pool, and the other part of the steam back flows to the water storage tank to heat cold water in the water storage tank, so that the cost of enterprise coal is reduced by more than one half.
Description
Technical field
The utility model belongs to the boiler heating system, relates in particular to a kind of process steam recovery system again.
Background technology
In the Weave type enterprise, need press setting with steam to the clothing that weaving is finished.At present mainly be to utilize boiler that the heating of water in the water tank is produced steam, steam will be included on the trimmer of trimming by pipeline.Then directly be discharged in the outdoor trench for unnecessary steam.General heat setting machine baking oven operating temperature chemical fibre class is about 200 ℃, about 160 ℃ of EGTs; COTTON FABRIC is about 140 ℃, about 100 ℃ of EGTs.Separate unit setting machine power consumption 60-100 ten thousand kilocalories, through estimation, the heat energy that fabric processing typing is consumed only account for its 29%, the body heat loss accounts for 10%, all the other a large amount of heat energy (more than 60%) are lost in the atmosphere with waste gas.Dispersed heat not only wastes energy but also causes environmental pollution, and the waste heat recovery of heat setting machine is imperative.
The utility model content
The purpose of this utility model is to overcome the deficiency of above-mentioned technology, and a kind of process steam recovery system again is provided, and remaining water vapour in producing by reasonable use is in order to save the production cost of enterprise.
The utility model for achieving the above object, by the following technical solutions: a kind of process steam is recovery system again, comprise boiler steam-heating system, be connected with trimmer with production by minute drum and steam line with water tank, the steam-heating system of boiler UNICOM, it is characterized in that: described steam line terminal is connected with steam trap, and described steam trap delivery port is connected with the pipeline that is communicated with bathing pool.
Pipeline that described steam trap delivery port is communicated with bathing pool respectively and the pipeline parallel connection that is communicated with water tank.
Beneficial effect: pipeline that the steam trap delivery port is communicated with bathing pool respectively and the pipeline that is communicated with water tank are arranged in parallel, remaining boiler water steam separated into two parts rationally can be utilized, a part feeds water vapour in the pond in employee bathroom, and the water in the pond is heated; Another partly refluxes water vapour and feeds in the water tank, and the cold water in the water tank is heated; Enterprise's coal-fired cost is reduced by more than 50.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Describe the specific embodiment of the present utility model in detail below in conjunction with accompanying drawing and preferred embodiment.As shown in the figure, a kind of process steam is recovery system again, comprise boiler 1-1 steam-heating system 1, be connected with trimmer 5 with production by dividing drum and steam line 3 with the water tank 1-2 of boiler UNICOM, steam-heating system 1, described steam line terminal is connected with steam trap 4, and described steam trap delivery port is connected with the pipeline 2 that is communicated with bathing pool.Pipeline that described steam trap delivery port is communicated with bathing pool 6 respectively and pipeline 7 parallel connections that are communicated with water tank.
The course of work: pipeline that the steam trap delivery port is communicated with bathing pool respectively and the pipeline that is communicated with water tank are arranged in parallel, cold water in the water tank is heated, its water temperature is raise, the water that is transported to like this in the boiler is warm water, further reduce the heat time heating time of boiler, saved the coal-fired cost of enterprise greatly.By remaining boiler water steam separated into two parts is rationally utilized, a part feeds water vapour in the pond in employee bathroom, and the water in the pond is heated; Another partly refluxes water vapour and feeds in the water tank, and the cold water in the water tank is heated.
The above only is a preferred implementation of the present utility model; should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.
Claims (2)
1. process steam recovery system again, comprise boiler steam-heating system, be connected with trimmer with production by minute drum and steam line with water tank, the steam-heating system of boiler UNICOM, it is characterized in that: described steam line terminal is connected with steam trap, and described steam trap delivery port is connected with the pipeline that is communicated with bathing pool.
2. process steam according to claim 1 is recovery system again, it is characterized in that: pipeline that described steam trap delivery port is communicated with bathing pool respectively and the pipeline parallel connection that is communicated with water tank.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200896016U CN202047262U (en) | 2011-03-30 | 2011-03-30 | Steam recycling system for production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200896016U CN202047262U (en) | 2011-03-30 | 2011-03-30 | Steam recycling system for production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202047262U true CN202047262U (en) | 2011-11-23 |
Family
ID=44987578
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200896016U Expired - Fee Related CN202047262U (en) | 2011-03-30 | 2011-03-30 | Steam recycling system for production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202047262U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105063944A (en) * | 2015-07-30 | 2015-11-18 | 江苏倪家巷集团精毛纺织有限公司 | Waste heat recovery system of dyeing and finishing workshop |
CN105926232A (en) * | 2016-05-31 | 2016-09-07 | 苏州东展羽绒服饰有限公司 | Steam recovery device of pre-shrinking machine for textile use |
-
2011
- 2011-03-30 CN CN2011200896016U patent/CN202047262U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105063944A (en) * | 2015-07-30 | 2015-11-18 | 江苏倪家巷集团精毛纺织有限公司 | Waste heat recovery system of dyeing and finishing workshop |
CN105063944B (en) * | 2015-07-30 | 2017-07-25 | 江苏倪家巷集团精毛纺织有限公司 | Dyeing and finishing workshop residual neat recovering system |
CN105926232A (en) * | 2016-05-31 | 2016-09-07 | 苏州东展羽绒服饰有限公司 | Steam recovery device of pre-shrinking machine for textile use |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106968733A (en) | Power plant's superhigh-pressure high-temp reheating embrittlement | |
CN202047262U (en) | Steam recycling system for production | |
CN103015096B (en) | Steam fabric setting machine cascade waste heat comprehensive utilization system of printing and dyeing mill | |
CN203021781U (en) | Step-type waste heat comprehensive utilization system of steam fabric setting machine in printing and dyeing mill | |
CN201772714U (en) | Drying equipment afterheat recycling device | |
CN105588108A (en) | System for replenishing water to steam boiler by means of steam condensate | |
CN204328990U (en) | Boiler Steam residual neat recovering system | |
CN203940410U (en) | A kind of laundry bootstrap system | |
CN204224285U (en) | A kind of desalination process system utilizing waste heat | |
CN203285501U (en) | Circulating water heating supply system for extraction condensing set | |
CN203489249U (en) | Steam recycling system | |
CN203360836U (en) | Steam circulating system for steam dryer | |
CN206769967U (en) | Power plant's superhigh-pressure high-temp reheating embrittlement | |
CN203024620U (en) | Waste heat recovery device | |
CN203068485U (en) | Closed type condensate water recovering equipment | |
CN201373387Y (en) | Novel energy-saving oil-firing boiler | |
CN205593030U (en) | Heat supply network circulating water system that multiple driving method jointly used | |
CN205593031U (en) | Energy -saving heat supply network circulating water system | |
CN201166357Y (en) | Secondary flash steam reutilization system of tobacco enterprise power workshop | |
CN205807801U (en) | A kind of solar energy auxiliary waste water residual heat reclaims gas fired-boiler energy-saving hot-water system | |
CN209857153U (en) | Low-vacuum operation circulating water waste heat recovery device | |
CN201704541U (en) | High-efficiency heat recoverer | |
CN203374450U (en) | Recycling system for waste heat of compressor | |
CN202936642U (en) | Heat supply device for washing device | |
CN203560887U (en) | Steam and hot water supply system used for factory |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111123 Termination date: 20120330 |