CN202046826U CN201120076195XU CN201120076195U CN202046826U CN 202046826 U CN202046826 U CN 202046826U CN 201120076195X U CN201120076195X U CN 201120076195XU CN 201120076195 U CN201120076195 U CN 201120076195U CN 202046826 U CN202046826 U CN 202046826U
Authority
CN
China
Prior art keywords
movable pulley
reel
steel rope
twines
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120076195XU
Other languages
Chinese (zh)
Inventor
李学勤
于淑芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN DAQI INDUSTRY DEVELOPMENT Co Ltd
Original Assignee
DALIAN DAQI INDUSTRY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN DAQI INDUSTRY DEVELOPMENT Co Ltd filed Critical DALIAN DAQI INDUSTRY DEVELOPMENT Co Ltd
Priority to CN201120076195XU priority Critical patent/CN202046826U/en
Application granted granted Critical
Publication of CN202046826U publication Critical patent/CN202046826U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to the field of mechanical manufacture, in particular to a trolley of a crane. A steel wire rope of a winding device of the trolley of the crane is wound on a winding drum in a double-layer manner; the winding device comprises the steel wire rope, the winding drum, a fixed pulley, a first movable pulley and a second movable pulley; and the steel wire rope is wound at one end of the winding drum in the double-layer manner, sequentially wound through the first movable pulley, the fixed pulley and the second movable pulley and wound at the other end of the winding drum in the double-layer manner after being wound out of the second movable pulley. The trolley of the crane has higher hoisting capacity and hoisting height.

Description

A kind of dolly of hoisting crane
Technical field
The utility model relates to mechanical manufacturing field, relates to a kind of dolly of hoisting crane specifically.
Background technology
Crane in bridge type be crossbearer in the workshop, warehouse and the sky, the stock ground weight-lifting equipment that carries out the material handling, be to use a kind of elevator machinery widest in area, that quantity is maximum.The steel wire canoe of winding plant has decisive influence to the hoisting capacity and the lifting altitude of crane in bridge type.For this reason, the mode that the steel rope that we provide a kind of winding plant twines with bilayer is wrapped in the dolly of the hoisting crane of reel, and this hoisting crane has higher hoisting capacity and lifting altitude.
Summary of the invention
In view of the defective that prior art exists, the purpose of this utility model is the dolly that a kind of hoisting crane will be provided, and the dolly of this hoisting crane has higher hoisting capacity and lifting altitude.
The technical scheme that its technical matters that solves the utility model adopts is: a kind of dolly of hoisting crane, and the steel rope of the winding plant of the dolly of described hoisting crane is wrapped on the reel in the mode that bilayer twines; Described winding plant comprises steel rope, reel, fixed pulley, movable pulley one and movable pulley two; Steel rope twines in that an end of reel is double-deck, twines movable pulley one after the winding successively, fixed pulley and movable pulley two, lay out movable pulley two after, steel rope twines in that the other end of reel is double-deck.
The beneficial effects of the utility model are dollies of a kind of hoisting crane, and the steel rope of the winding plant of the dolly of described hoisting crane is wrapped on the reel in the mode that bilayer twines; Described winding plant comprises steel rope, reel, fixed pulley, movable pulley one and movable pulley two; Steel rope twines in that an end of reel is double-deck, twines movable pulley one after the winding successively, fixed pulley and movable pulley two, lay out movable pulley two after, steel rope twines in that the other end of reel is double-deck.The dolly of this hoisting crane has higher hoisting capacity and lifting altitude.
Description of drawings
Fig. 1 is the utility model schematic top plan view.
The Reference numeral of Fig. 1 is as follows: steel rope 1, reel 2, fixed pulley 3, movable pulley 1, movable pulley 25.
The specific embodiment
Fig. 1 is that the dolly winding plant steel rope of hoisting crane twines scheme drawing, and the steel rope 1 of the winding plant of the dolly of described hoisting crane is wrapped on the reel 2 in the mode that bilayer twines; Described winding plant comprises steel rope 1, reel 2, fixed pulley 3, movable pulley 1 and movable pulley 25; Steel rope 1 twines in that an end of reel 2 is double-deck, twines movable pulley 1 after the winding successively, fixed pulley 3 and movable pulley 25, lay out movable pulley 25 after, steel rope 1 twines in that the other end of reel 2 is double-deck.

Claims (1)

1. the dolly of a hoisting crane is characterized in that: the steel rope of the winding plant of the dolly of described hoisting crane (1) is wrapped on the reel (2) in the mode that bilayer twines; Described winding plant comprises steel rope (1), reel (2), fixed pulley (3), movable pulley one (4) and movable pulley two (5); Steel rope (1) twines in that an end of reel (2) is double-deck, twines movable pulley one (4) after the winding successively, fixed pulley (3) and movable pulley two (5), lay out movable pulley two (5) after, steel rope (1) is in the double-deck winding of the other end of reel (2).
CN201120076195XU 2011-03-22 2011-03-22 Trolley of crane Expired - Fee Related CN202046826U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120076195XU CN202046826U (en) 2011-03-22 2011-03-22 Trolley of crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120076195XU CN202046826U (en) 2011-03-22 2011-03-22 Trolley of crane

Publications (1)

Publication Number Publication Date
CN202046826U true CN202046826U (en) 2011-11-23

Family

ID=44987144

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120076195XU Expired - Fee Related CN202046826U (en) 2011-03-22 2011-03-22 Trolley of crane

Country Status (1)

Country Link
CN (1) CN202046826U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318796A (en) * 2013-07-22 2013-09-25 上海海事大学 Balance weight pulley block
CN103626063A (en) * 2013-12-11 2014-03-12 江苏沃得起重机有限公司 Rope winding device and method for steel wire rope of large-size portal crane
CN111977541A (en) * 2020-07-27 2020-11-24 枣庄矿业(集团)付村煤业有限公司 Transportation method of heavy equipment under large-gradient condition under mine

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103318796A (en) * 2013-07-22 2013-09-25 上海海事大学 Balance weight pulley block
CN103318796B (en) * 2013-07-22 2015-12-23 上海海事大学 Counterweight assembly pulley
CN103626063A (en) * 2013-12-11 2014-03-12 江苏沃得起重机有限公司 Rope winding device and method for steel wire rope of large-size portal crane
CN103626063B (en) * 2013-12-11 2016-01-06 江苏沃得起重机有限公司 Large-sized gantry crane wire rope winding device and rope-winding method
CN111977541A (en) * 2020-07-27 2020-11-24 枣庄矿业(集团)付村煤业有限公司 Transportation method of heavy equipment under large-gradient condition under mine

Similar Documents

Publication Publication Date Title
CN202046826U (en) Trolley of crane
CN202687622U (en) Portable power cable and wire pay-off device
CN204737624U (en) Hoist wire rope anti -swing system
CN203346023U (en) Winding system of stacker hoisting mechanism
CN202671090U (en) Rope-breaking and rope-winding prevention device of bridge-type crane
CN202687657U (en) Wire spool
CN202193565U (en) Electromagnetic crane with rotating beam
CN206645749U (en) Electric block type multi-lay winding hoist engine
CN204490397U (en) Hoisting crane double-layer wire rope double crosslinking drum device
CN201801239U (en) Disc-type movable ground wire reel
CN203558395U (en) Hoisting mechanism of stacker loading platform
CN203392637U (en) Wire winding disc
CN202754734U (en) Rope pressing device of hoist roller
CN205151622U (en) Double -deck wire rope electric block
CN104085811B (en) A kind of steel strand servo winch
CN202988623U (en) Compact high-lift hoisting mechanism
CN202687627U (en) Steel wire rope sizing arrangement device
CN201587825U (en) Fence type winding drum lifting mechanism of single-arm frame seat type crane
CN205932725U (en) Automatic winding device of I -shaped wheel
CN202625696U (en) Hoist roller
CN203319605U (en) Stacking machine lifting winding drum with disordered-rope-preventing function
CN203439926U (en) Ring chain electric hoist grab bucket
CN102336373A (en) Simple anti-twist device for steel wire rope of crane
CN202785267U (en) Hoisting disk device
CN203855102U (en) Belt conveyor tensioning device with lifting function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111123