CN202031095U - Multifunctional settling tube filling pile press - Google Patents

Multifunctional settling tube filling pile press Download PDF

Info

Publication number
CN202031095U
CN202031095U CN2011201284962U CN201120128496U CN202031095U CN 202031095 U CN202031095 U CN 202031095U CN 2011201284962 U CN2011201284962 U CN 2011201284962U CN 201120128496 U CN201120128496 U CN 201120128496U CN 202031095 U CN202031095 U CN 202031095U
Authority
CN
China
Prior art keywords
pile
oil cylinder
chassis
pillar
immersed tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201284962U
Other languages
Chinese (zh)
Inventor
罗亮平
杨永和
柏红专
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN DEBOOM HEAVY INDUSTRY CO LTD
Original Assignee
HUNAN DEBOOM HEAVY INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN DEBOOM HEAVY INDUSTRY CO LTD filed Critical HUNAN DEBOOM HEAVY INDUSTRY CO LTD
Priority to CN2011201284962U priority Critical patent/CN202031095U/en
Application granted granted Critical
Publication of CN202031095U publication Critical patent/CN202031095U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A multifunctional settling tube filling pile press comprises a static pile press chassis formed by a press body, a running system and a crane system; a pile pressing system is mounted above the chassis and comprises two groups of pillars, cross beams and pile pressing oil cylinders, which are symmetrically arranged on two sides of the pile pressing system and are connected in sequence; one end of each pile pressing oil cylinder is fixedly connected with a pile clamping box; and a tube filling system, a protection tube system and a rammer system are mounted above the chassis. The multifunctional settling tube filling pile press has strong load-bearing capacity and good pile forming quality, can meet the requirement that the designed depth of a pressed pile is larger than the length of a preformed pile, and can reduce the depth of the pressed pile and considerably low the construction cost under the requirement of identical bearing capacity.

Description

Multi-functional immersed tube bored pile press
Technical field
The utility model relates to a kind of multi-functional immersed tube bored pile press.
Background technology
CN02139875.5 discloses a kind of environment-friendly type and has embraced pressure, roof pressure dual-purpose hydraulic static pile press, have vertical walking mechanism, horizontal walking mechanism, fuselage, be mounted with column on its fuselage, crossbeam and column are connected and fixed, the piling oil cylinder is fixed on the crossbeam, one of the piling oil cylinder is connected and fixed with pile clamping box, the lower end of roof pressure portal frame also is connected and fixed with pile clamping box, pile clamping box is positioned at column and crossbeam inboard, can move up and down, folder stake oil cylinder is housed in the pile clamping box, and the termination of folder stake oil cylinder installs pile-clamp.CN201020153422.X discloses a kind of pair of piling system static pile press.This machine comprises fuselage, a running gear of drawing money on credit, short bearing running gear, cantilever, hoist cylinder, Weighting system, operating system, crane, the first piling system, the second piling system, fuselage places on the short bearing running gear, cantilever is housed on the fuselage, the cylinder body of hoist cylinder is connected with cantilever, piston is connected with a running gear of drawing money on credit, Weighting system is housed on the cantilever, fuselage one end is equipped with operating system, the other end is equipped with crane, and the first piling system, the second piling system are housed on the fuselage; Can realize uninterrupted piling continuously.This class static pile press is by the hydraulic jack effect, preformed pile is pressed into ground by own wt, and the length of a preformed pile is also long with regard to tens meters, when the piling degree of depth requires length greater than preformed pile, needs by welding method preformed pile is connected.Like this, the quality of pile foundation is not only relevant with the quality of preformed pile, also with stake between the welding quality that connects relevant, in foundation soil moist with and phreatic environment may cause pile foundation intensity to reduce by the corrosion weld seam, and it is identical at the bottom of the preformed pile stake with the pile body cross section, the stake end, do not enlarge, and the supporting capacity that improve stake must increase the piling degree of depth.
The utility model content
The purpose of this utility model is to overcome above shortcoming, and a kind of multi-functional immersed tube bored pile press is provided.To realize that its supporting capacity is strong, pile quality good, can satisfy of the requirement of piling projected depth greater than preformed pile length; Under same bearer power requires, also can reduce the piling degree of depth, significantly reducing the construction costs.
The technical solution of the utility model is: comprise the static pile press chassis that is made of fuselage, running gear, tackling system; The piling system of installing above the chassis, described piling system comprise each one group of column that is connected and fixed successively of both sides symmetry, crossbeam, piling oil cylinder; One of the piling oil cylinder is connected and fixed with pile clamping box, it is characterized in that; The top, chassis is equipped with immersed tube bored system, pillar system, hammer ram system.
But described immersed tube bored system comprises the hollow steel pipe that is clipped in the middle penetration concrete of pile clamping box, connects firmly the stubborn pipe device on pile clamping box, is located at the vibrator of pile clamping box below, is installed in the anti-top oil cylinder of pile clamping box two side bottoms.
Described pillar system is included in the pillar frame of the quadrangle trussed construction that hollow steel pipe one side is provided with, back two legs of pillar frame connect with the chassis, preceding two legs connect by clamp the pillar frame is adjusted back in place and the bearing on the fuselage is fitted by bolt after, and the pillar top of the trellis is connected with the top of diagonal brace; Diagonal brace bottom is connected with oil cylinder free bearing on the static pile press fuselage by the diagonal brace oil cylinder.
Described hammer ram system is provided with swing arm by the control of swing arm oil cylinder at the pillar top of the trellis, and described swing arm is connected with weight by the wire rope on the niggerhead, by the telescopic band movable pendulum arm swing of swing arm oil cylinder, weight is put the hammering position or closes in the pillar frame.
Be fixed with the top holding tube device that makes steel pipe stable at the pillar top of the trellis by hinge, embrace steel pipe when pulling out this position, guarantee that steel pipe is stable when steel pipe is counter.
Is furnished with sounding gear on the described chassis.
The utility model is the anti-certain distance that pulls out after steel pipe is pressed onto projected depth, pour into a certain amount of concrete, enlarge at the bottom of the free-falling hammering concrete of assigned address makes by weight, can avoid rising of steel cage and concrete necking down counter the pulling out in the process on the concrete that is pressed in weight in the steel pipe of steel pipe.The chassis is furnished with sounding gear, by an enlarged diameter at the bottom of measuring before and after the hammering concrete height change and can calculating.The utility model supporting capacity is strong, and pile quality is good; Can satisfy of the requirement of piling projected depth greater than preformed pile length; Under same bearer power requires, also can reduce the piling degree of depth, significantly reducing the construction costs.
Description of drawings
Fig. 1 is in the complete machine front view of hammering position for weight;
Fig. 2 closes at complete machine front view in the pillar frame for weight;
Fig. 3 is the chassis vertical view;
Fig. 4 is that pillar frame foreleg connects detail drawing with fuselage bearing and clamp.
The specific embodiment
The utility model is described in further detail below in conjunction with drawings and Examples.
Embodiment: with reference to accompanying drawing:
Present embodiment comprises the static pile press chassis 1 that is made of fuselage 1-1, running gear 1-2, tackling system 1-3, and the piling system is installed on chassis 1.The piling system comprises each one group of column that is connected and fixed successively 2 of both sides symmetry, crossbeam 3, piling oil cylinder 4.One of the piling oil cylinder is connected and fixed with pile clamping box 9, but accompanies the hollow steel pipes 17 of penetration concrete in the middle of the pile clamping box 9, is provided with on pile clamping box 9 tops and twists pipe device 10, and pile clamping box 9 bottoms are provided with vibrator 11, and 9 liang of side bottoms of pile clamping box are provided with anti-top oil cylinder 12.Be provided with a quadrangle trussed construction pillar frame 5 in hollow steel pipe 17 1 sides.Back two legs of pillar frame connect with chassis 1, and preceding two legs are adjusted back in place at pillar frame 5 and fitted with the bearing 18 on the fuselage by bolt 21, connect with clamp 20 again.The pillar top of the trellis is connected with diagonal brace 7 tops; Diagonal brace bottom is connected with oil cylinder free bearing 19 on the fuselage by diagonal brace oil cylinder 8.Be provided with swing arm 14 by swing arm oil cylinder 15 control at the pillar top of the trellis, swing arm is connected with weight 13 by the wire rope on the niggerhead 16, by the telescopic band movable pendulum arm swing of swing arm oil cylinder 15, weight is put the hammering position or closes in the pillar frame.

Claims (6)

1. multi-functional immersed tube bored pile press comprises the static pile press chassis that is made of fuselage, running gear, tackling system; The piling system of installing above the chassis, described piling system comprise each one group of column that is connected and fixed successively of both sides symmetry, crossbeam, piling oil cylinder; One of described piling oil cylinder is connected and fixed with pile clamping box, it is characterized in that, immersed tube bored system, pillar system, hammer ram system are installed above the chassis.
2. multi-functional immersed tube bored pile press according to claim 1, it is characterized in that, but described immersed tube bored system comprises the hollow steel pipe that is clipped in the middle penetration concrete of pile clamping box, connect firmly the stubborn pipe device on pile clamping box, be located at the vibrator of pile clamping box below, be installed in the anti-top oil cylinder of pile clamping box two side bottoms.
3. multi-functional immersed tube bored pile press according to claim 1, it is characterized in that, described pillar system comprises the pillar frame of the quadrangle trussed construction that is located at hollow steel pipe one side, back two legs of described pillar frame connect with the chassis, preceding two legs connect by clamp the pillar frame is adjusted back in place and the bearing on the fuselage is fitted by bolt after, and described pillar top of the trellis is connected with the top of diagonal brace; Described diagonal brace bottom is connected with oil cylinder free bearing on the fuselage by the diagonal brace oil cylinder.
4. multi-functional immersed tube bored pile press according to claim 1, it is characterized in that, described hammer ram system is provided with the swing arm of being controlled its swing by the swing arm oil cylinder at the pillar top of the trellis, described swing arm is connected with weight by the wire rope on the niggerhead, puts the hammering position or closes in the pillar frame by swing arm oil cylinder control weight.
5. multi-functional immersed tube bored pile press according to claim 1 is characterized in that, is fixed with the top holding tube device that makes steel pipe stable by hinge at the pillar top of the trellis.
6. multi-functional immersed tube bored pile press according to claim 1 is characterized in that being furnished with sounding gear on the described chassis.
CN2011201284962U 2011-04-27 2011-04-27 Multifunctional settling tube filling pile press Expired - Fee Related CN202031095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201284962U CN202031095U (en) 2011-04-27 2011-04-27 Multifunctional settling tube filling pile press

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201284962U CN202031095U (en) 2011-04-27 2011-04-27 Multifunctional settling tube filling pile press

Publications (1)

Publication Number Publication Date
CN202031095U true CN202031095U (en) 2011-11-09

Family

ID=44893397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201284962U Expired - Fee Related CN202031095U (en) 2011-04-27 2011-04-27 Multifunctional settling tube filling pile press

Country Status (1)

Country Link
CN (1) CN202031095U (en)

Similar Documents

Publication Publication Date Title
CN106379839B (en) A kind of modularization gate-type multifunctional rock drilling trolley job platform and method
CN201574359U (en) Hanging basket equivalent preloading device used in high-pier large-span bridge construction
CN102127912A (en) Multifunctional sinking pipe cast-in-place pile driver
CN102605785A (en) Prestressing pile sealing device for statically pressed piles of anchor bars
CN204780909U (en) Construct pre -buried foundation pile tamping unit
CN206800215U (en) Bridge incremental launching Bridge Erector
CN202031095U (en) Multifunctional settling tube filling pile press
CN201486483U (en) Retaining mechanism for drill rod
CN210855047U (en) Be suitable for transmission material between reverse construction method floor with small-size swing arm formula electric hoist
CN101979771A (en) Tower whole movement lifting device
CN205421023U (en) Public road bridge roof beam strutting arrangement
CN206570810U (en) A kind of roof pressing type pile compacting equipment
CN206052562U (en) Thin-walled hollow pier capping beam profile steel bracket
CN202208922U (en) Impact hammer for pile pouring machine
CN206636582U (en) A kind of shield tunnel construction of central division wall chassis
CN216008539U (en) Be used for subway tunnel steel truss to support multi-functional platform truck
CN214994020U (en) Combined tower crane foundation pre-embedded structure
CN207160009U (en) One kind has tracked chassis refit formula hydraulic pile driver
CN108483284B (en) A kind of derrick crane base steel plinth suspension installation method
CN201406635Y (en) Self-balancing load anchor device between girder section and bearing platform
CN206352294U (en) A kind of flood-fighting piling machine
CN106567386A (en) Pouring type pile driver and pile driving method therefor
CN105178315A (en) Pouring type pile driver and pile driving method using pile driver
CN206622487U (en) A kind of lifting garage crossbeam H steel straighteners
CN205012337U (en) Pour formula pile driver

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111109

Termination date: 20120427