CN202024088U - Gas injection replacement device - Google Patents

Gas injection replacement device Download PDF

Info

Publication number
CN202024088U
CN202024088U CN201120012410XU CN201120012410U CN202024088U CN 202024088 U CN202024088 U CN 202024088U CN 201120012410X U CN201120012410X U CN 201120012410XU CN 201120012410 U CN201120012410 U CN 201120012410U CN 202024088 U CN202024088 U CN 202024088U
Authority
CN
China
Prior art keywords
valve
cut
gas
shut
fuel gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120012410XU
Other languages
Chinese (zh)
Inventor
杨华峰
张喆
刘华平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201120012410XU priority Critical patent/CN202024088U/en
Application granted granted Critical
Publication of CN202024088U publication Critical patent/CN202024088U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a gas injection replacement device, which belongs to the field of fuel gas transportation management and is particularly applied in the field of metallurgy and civil fuel gas transportation management. The gas injection replacement device consists of three shut-off valves and an air release valve and is characterized in that one shut-off valve is connected with high pressure steam, one shut-off valve is connected with high pressure compressed air, one shut-off valve is connected with a bleed-off ejector of a fuel gas pipe, and the air release valve is arranged among the three shut-off valves. The gas injection replacement device solves the problem that the time of purging and replacing operation before the overhaul for the traditional fuel gas equipment is long, so as to improve 50% of operation efficiency and provide a powerful guarantee for fast maintenance and overhaul for a fuel gas system.

Description

Gas injection displacement apparatus
Technical field
The utility model belongs to gas supply pipe reason field, especially is suitable for metallurgical, domestic gas conveying management field.
Background technique
Carry out need carrying out coal gas purging, nitrogen replacement operation in gas fittings (facility) maintenance at steel industry, its job step is:
1, coal gas purges.---opening end diffuses, and---pipeline (equipment) initial end is opened blowing medium (nitrogen), and---purging---sample examination detects CO and other gas componant promptly to cut off purging pipeline section (or equipment) gas source (stifled blind plate).
2, nitrogen replacement.Pipeline (equipment) sample examination detects qualified back with air displacement nitrogen, satisfies the requirements for pipeline (equipment) possesses into the interior inspection or the maintenance of getting angry.---the initial end blowing air---changes inner nitrogen---and diffuses end and detects oxygen content simultaneously promptly to stop to purge nitrogen.
Pipeline or equipment are malleation in purging and the replacement process, and the activity duration is long.Blow line long more (or equipment is big more), the activity duration is long more, and it is qualified that for example 300 meters DN2000 pipeline purge time needs could purge more than two hours chemical examination.This purging mode seriously restricts gas pipe line, overhaul of the equipments progress.
Summary of the invention
The utility model aims to provide gas injection displacement apparatus, its objective is to reduce the preceding purging of gas-fired equipment facility maintenance, displacement activity duration, improves operating efficiency.
The utility model is made up of three cut-off valves and an atmospheric valve, it is characterized in that having a cut-off valve to connect high pressure steam, have a cut-off valve to connect high pressure air, have a cut-off valve to connect gas pipeline and diffuse ejector, atmospheric valve is arranged between above-mentioned three cut-off valves.
A cut-off valve is installed between ejector and the gas pipeline.
The problem that the utility model purges before having solved traditional gas-fired equipment facility maintenance, the displacement activity duration is long improves operating efficiency 50%, provides strong guarantee for carrying out the gas burning system Maintenance and Repair fast.
The utlity model has following advantage: ⑴ operating efficiency height.Utilize pressurized operation to purge gas in the displacement pipeline, compare traditional operation under positive pressure operation, save time, improved operating efficiency.
⑵ safe and reliable.Adopt high pressure steam as the injection source of the gas, nitrogen purges the possibility of having avoided air to sneak in the operation process as source purge gas at coal gas, and is therefore safe and reliable.In the replacement process, adopt high pressure air, improved the convection velocity of air in the pipeline, reduced the resident amount of dead angle area nitrogen in pipeline or the equipment, provide safety assurance for the staff goes into interior fire operation.
⑶ easy and simple to handle.By injection gas COMM communication can realize that coal gas purges and pipeline in the working continuously of nitrogen replacement, only need one people can finish whole work procedures.
Description of drawings:
Fig. 1 is the utility model embodiment's a structural representation.
Among the figure, 1, cut-off valve, 2, cut-off valve, 3, cut-off valve, 4, atmospheric valve, 5, ejector, 6, cut-off valve, 7, gas pipe line.
Embodiment:
Embodiment: shown in Figure 1, present embodiment is made up of 1,2,3 and atmospheric valves 4 of three cut-off valves, it is characterized in that cut-off valve 1 connects high pressure steam, and cut-off valve 2 connects high pressure air, cut-off valve 3 connects gas pipeline and diffuses ejector 5, and atmospheric valve 4 is arranged between above-mentioned three cut-off valves.
Cut-off valve 1,2 connects by pipeline, connecting tube between the cut-off valve 1,2 is provided with the arm that connects cut-off valve 3, be provided with atmospheric valve 4 on the arm that connects cut-off valve 3, cut-off valve 3 connects ejector 5 by pipeline, is provided with cut-off valve 6 between ejector 5 and the gas pipeline.
Operating process of the present utility model is: cut-off valve 1,2 and 3 cut out when pipeline or equipment had the combustion gas operation, and atmospheric valve 4 is opened, and guaranteed can not collaborate mutually, influence each other between steam, pressurized air and the combustion gas; When combustion gas stop using to need purged, cut-off valve 1 was opened in choosing, closed immediately when atmospheric valve 4 is emerged steam, opened cut-off valve 3, opened ejector and carried out coal gas and purge (the logical nitrogen of pipeline starting end cooperate purge); Stop steam after the detection of coal gas purging is qualified, closes cut-off valve 1, open cut-off valve 2, ejector carries out the operation of pipeline nitrogen replacement.
Ejector is responsible for the gas in the negative pressure drainage pipeline, and the efficient apparatus that cut-off valve is isolated for this device and gas pipe line cuts off coal gas, prevents gas leakage when this device does not move.

Claims (1)

1. gas injection displacement apparatus, form by three cut-off valves and an atmospheric valve, it is characterized in that having a cut-off valve to connect high pressure steam, have a cut-off valve to connect high pressure air, have a cut-off valve to connect gas pipeline and diffuse ejector, atmospheric valve is arranged between above-mentioned three cut-off valves.
CN201120012410XU 2011-01-17 2011-01-17 Gas injection replacement device Expired - Fee Related CN202024088U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120012410XU CN202024088U (en) 2011-01-17 2011-01-17 Gas injection replacement device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120012410XU CN202024088U (en) 2011-01-17 2011-01-17 Gas injection replacement device

Publications (1)

Publication Number Publication Date
CN202024088U true CN202024088U (en) 2011-11-02

Family

ID=44849037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120012410XU Expired - Fee Related CN202024088U (en) 2011-01-17 2011-01-17 Gas injection replacement device

Country Status (1)

Country Link
CN (1) CN202024088U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994328A (en) * 2014-05-20 2014-08-20 山西太钢不锈钢股份有限公司 Coal gas blowing safety replacement device
CN104989954A (en) * 2015-07-08 2015-10-21 内蒙古包钢钢联股份有限公司 Device and method used for cleaning jam of coking coal flow adjusting valve of CCPP set

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994328A (en) * 2014-05-20 2014-08-20 山西太钢不锈钢股份有限公司 Coal gas blowing safety replacement device
CN104989954A (en) * 2015-07-08 2015-10-21 内蒙古包钢钢联股份有限公司 Device and method used for cleaning jam of coking coal flow adjusting valve of CCPP set
CN104989954B (en) * 2015-07-08 2019-03-29 内蒙古包钢钢联股份有限公司 For clearing up the device and method of CCPP unit coking coal flow tune valve bite

Similar Documents

Publication Publication Date Title
CN203298937U (en) Valve test pressure source
EA201201048A1 (en) SYSTEM AND METHOD OF HIGHLY EFFICIENT PRODUCTION OF ENERGY USING AS A CIRCULATING WORKING BODY OF CARBON DIOXIDE
CN201433236Y (en) Emergency shut-down and automatic purging device for gas-fired furnace
CN202024088U (en) Gas injection replacement device
CN201848563U (en) Pressurized device for forming holes on pipelines
CN101509605B (en) Method for recovering relief gas in process for examining and repairing gas pipe network and device thereof
CN105219900A (en) A kind of blast furnace gas diffusing method and automatic control system
CN201412177Y (en) High pressure water mist generator
CN201723791U (en) Backfire-prevention valve
CN207762432U (en) Coal gas automatic blowing diffusion system
CN204083656U (en) A kind of for the online bucket patch device with pressure of non-combustible gas pipeline
CN102563201B (en) Device for eliminating leakage risk of gas gate valve online
CN202290667U (en) Blasting purging tool for oxygen pipeline
CN201382844Y (en) High-speed pneumatic device for in-service heat-exchanger pipe eddy-current detection
CN202372320U (en) Multi-purpose air tightness test bed
CN203146269U (en) Gas supplying device for dry gas sealing of compressor
CN202542483U (en) Anti-blocking device for lime pneumatic transmission pipeline
CN202648896U (en) Two-position five-way pneumatic valve checking platform
CN203979767U (en) The pipe-line non-stop plugging special device that do not stop production
CN202381998U (en) Safety cut-off device for natural gas
CN201662497U (en) Pipeline sampler
CN201892629U (en) Sampling device for sulfur-containing natural gas
CN204503653U (en) A kind of cleaning equipment
CN203602640U (en) Non gas holder single-base blast furnace production gaspipe network
CN201722332U (en) Coke barrier coal loading flue gas guide device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20170117