CN202023358U - Concrete follow-up heat preservation device below large formwork - Google Patents

Concrete follow-up heat preservation device below large formwork Download PDF

Info

Publication number
CN202023358U
CN202023358U CN2011201165624U CN201120116562U CN202023358U CN 202023358 U CN202023358 U CN 202023358U CN 2011201165624 U CN2011201165624 U CN 2011201165624U CN 201120116562 U CN201120116562 U CN 201120116562U CN 202023358 U CN202023358 U CN 202023358U
Authority
CN
China
Prior art keywords
heat preservation
large form
large formwork
concrete
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011201165624U
Other languages
Chinese (zh)
Inventor
戴志清
余英
杨锡银
曹东林
陈宏�
戚燕霞
汪文亮
张玉宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Co Ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN2011201165624U priority Critical patent/CN202023358U/en
Application granted granted Critical
Publication of CN202023358U publication Critical patent/CN202023358U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a concrete follow-up heat preservation device below a large formwork, which comprises the large formwork, wherein an upper bracket of the large formwork and a lower bracket of the large formwork are connected with a working platform of the large formwork; a heat preservation quilt is fixed on a heat preservation quilt bracket; a shaft lever is arranged on the lower bracket of the large formwork; and the heat preservation quilt bracket is connected with the shaft lever on the lower bracket of the large formwork through a connecting lever. According to the lower concrete follow-up heat preservation device of the large formwork, which is provided by the utility model, the heat preservation quilt bracket below the large formwork is manufactured according to the structure of the large formwork, the heat preservation quilt is fixed on the heat preservation quilt bracket, and the heat preservation quilt bracket falls by utilizing the dead load, so the heat preservation quilt is tightly stuck to a concrete-poured surface, the heat preservation effect is good, the construction is safe and rapid, and the concrete follow-up heat preservation device is very suitable for heat preservation of concrete vertical surfaces of hydropower stations.

Description

Concrete follow-up attemperator under the large form
Technical field
The utility model relates to a kind of concrete heat-insulating facility, concrete follow-up attemperator under particularly a kind of large form.
Background technology
When constructing in the winter time, need adopt concrete polyethylene coiled material (insulation quilt) that concrete surface is incubated.When concrete adopted large formwork construction, large form bottom normal employing of vertical surface insulation of concreting hung the construction of rope ladder method, but problem such as this method exists construction safety risk big, and insulation quilt is difficult for being adjacent to concrete surface, and heat insulation effect is relatively poor.
Summary of the invention
Technical problem to be solved in the utility model provides under a kind of large form concrete follow-up attemperator, is made according to the structure and the characteristics of large form, can guarantee that insulation quilt is close to concrete surface, high insulating effect, and construction safety is quick.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: concrete follow-up attemperator under a kind of large form, comprise large form, the large form upper bracket is connected with the large form working platform with the large form lower carriage, insulation quilt is fixed on the insulation quilt support, the lower carriage of large form is provided with axostylus axostyle, and the insulation quilt support is connected by the axostylus axostyle on the lower carriage of connecting rod and large form.Insulation quilt support top is provided with hanger, and hanger is connected with the large form upper bracket by butt hook.
Concrete follow-up attemperator under the large form that the utility model provides, be according to insulation quilt support under the structure fabrication large form of large form, and fixing insulation quilt thereon, utilize the deadweight of insulation quilt support to descend, make insulation quilt be adjacent to concreting surface, high insulating effect, construction safety is quick, is fit to very much power station concrete vertical surface insulation.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 mentions state diagram for concrete follow-up attemperator support under the large form.
Fig. 2 be large form when in place the insulation quilt support descend by deadweight, make insulation quilt be adjacent to the concrete surface state diagram.
Fig. 3 is an insulation quilt rack making plan view.
The specific embodiment
As Figure 1-3, the utility model comprises large form 1, large form upper bracket 8 is connected with large form working platform 9 with large form lower carriage 5, insulation quilt 4 is fixed on the insulation quilt support 3, the lower carriage 5 of large form is provided with axostylus axostyle 6, and insulation quilt support 3 is connected by the axostylus axostyle 6 on the lower carriage 5 of connecting rod 7 and large form.Insulation quilt support 3 tops are provided with hanger 10, and hanger 10 is connected with large form upper bracket 8 by butt hook 11.
The utility model device construction sequence is as follows:
1, processing and fabricating connecting rod 7, axostylus axostyle 6 and insulation quilt support 3 inside, when insulation quilt support 3 was made, cross bar should put connecting rod one end before welding with support.
2, on large form lower carriage 5, weld axostylus axostyle, during welding axostylus axostyle is carefully held towards the template limit.
3, the constructor is promoted to large form lower carriage 5 positions with insulation quilt support 3, with insulation quilt support 3 and connecting rod 7 sleeve pipes, one end and the socket of large form lower carriage axostylus axostyle, makes insulation quilt support 3 be connected in place with large form lower carriage 5.
4, with iron wire insulation quilt 4 is tied up on insulation quilt support 3.
5, descend by 3 deadweights of insulation quilt support, make insulation quilt 4 be adjacent to concreting surface 2, large form bottom.
6, large form 1 storehouse inner concrete is built.
7, before large form 1 promotes, operating personnel stand on the large form master working platform 9, long with 2 1.2m, the butt hook 11 of two ends band crotch hooks the upper end hanger 10 of insulation quilt support 3, upwards pulling, make insulation quilt 4 throw off concrete surface more than 20 centimetres, and the upper end is hooked, is fixed on the large form 1 with butt hook 11.
8, large form promotes in place.
9, operating personnel stand on the large form master working platform 9, unclamp the butt hook 11 that hangs on the large form 1, and insulation quilt support 3 descends by deadweight, makes insulation quilt 4 be adjacent to concreting surface 2.
10, repeat 6~9 steps, satisfy dam concrete vertical lifting and concrete surface follow-up insulation.

Claims (2)

1. concrete follow-up attemperator under the large form, comprise large form (1), large form upper bracket (8) is connected with large form working platform (9) with large form lower carriage (5), it is characterized in that: insulation quilt (4) is fixed on the insulation quilt support (3), the lower carriage of large form (5) is provided with axostylus axostyle (6), and insulation quilt support (3) is connected by the axostylus axostyle (6) on the lower carriage (5) of connecting rod (7) and large form.
2. concrete follow-up attemperator under the large form according to claim 1, it is characterized in that: insulation quilt support (3) top is provided with hanger (10), and hanger (10) is connected with large form upper bracket (8) by butt hook (11).
CN2011201165624U 2011-04-20 2011-04-20 Concrete follow-up heat preservation device below large formwork Expired - Fee Related CN202023358U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011201165624U CN202023358U (en) 2011-04-20 2011-04-20 Concrete follow-up heat preservation device below large formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011201165624U CN202023358U (en) 2011-04-20 2011-04-20 Concrete follow-up heat preservation device below large formwork

Publications (1)

Publication Number Publication Date
CN202023358U true CN202023358U (en) 2011-11-02

Family

ID=44848311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011201165624U Expired - Fee Related CN202023358U (en) 2011-04-20 2011-04-20 Concrete follow-up heat preservation device below large formwork

Country Status (1)

Country Link
CN (1) CN202023358U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535872A (en) * 2012-01-16 2012-07-04 中交第一公路工程局有限公司 Thermal insulation method and concrete thermal insulation cover for winter construction of pier column
CN106121067A (en) * 2016-06-23 2016-11-16 中国建筑第八工程局有限公司 Under skyscraper lifting platform, body of wall climbs heat-insulation system and construction method thereof
RU222940U1 (en) * 2023-10-30 2024-01-24 Дмитрий Романович Лысюк THERMAL INSULATING SUPPORTING FORM PROFILE

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102535872A (en) * 2012-01-16 2012-07-04 中交第一公路工程局有限公司 Thermal insulation method and concrete thermal insulation cover for winter construction of pier column
CN102535872B (en) * 2012-01-16 2014-02-26 中交第一公路工程局有限公司 Thermal insulation method and concrete thermal insulation cover for winter construction of pier column
CN106121067A (en) * 2016-06-23 2016-11-16 中国建筑第八工程局有限公司 Under skyscraper lifting platform, body of wall climbs heat-insulation system and construction method thereof
RU222940U1 (en) * 2023-10-30 2024-01-24 Дмитрий Романович Лысюк THERMAL INSULATING SUPPORTING FORM PROFILE

Similar Documents

Publication Publication Date Title
CN204643637U (en) A kind of scissors V shape drilling rod lifting machine
CN204324676U (en) Anchor ear lifting device
CN202023358U (en) Concrete follow-up heat preservation device below large formwork
CN202544468U (en) Drawbar-type electrical steel tubular rod
CN203513079U (en) Multi-segment lifting device for large tower device
CN206034479U (en) Tower crane relay handling supporter device
CN203571610U (en) Multifunctional vertical rod for construction
CN204510767U (en) The basket operating platform of Novel hanging
CN203905426U (en) Steel coal scuttle butt-connection installation construction operation table
CN203461245U (en) Refractory material assembled short-moment arm insulation box body
CN204096976U (en) A kind of antenna hanging apparatus of wireless base station
CN205906953U (en) Special hoist of poling machine
CN207234292U (en) High-tension cable laying tool
CN205499902U (en) A mould for outer heating coil integral erection of vertical storage tank
CN201238159Y (en) GW4-110 type isolation switch examination stand
CN104261284B (en) A kind of antenna hanging apparatus of wireless base station
CN203392754U (en) Transformer hanging device
CN204664629U (en) Construction layer drags pump concrete delivery pipe shock bracket
CN103640964A (en) Wind power flange supporting-expanding-type lifting appliance
CN204848020U (en) Buffer type lifting device
CN203536216U (en) Transformer coil constant-voltage device
CN207166027U (en) A kind of inspection platform for transmission line of electricity repairing drainage thread
CN203865835U (en) Water toughening lifting appliance for high-manganese steel castings
CN203541160U (en) H-shaped steel correcting device
CN205114834U (en) Copper coil pipe hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102