CN202020926U - Combined model bridge toy - Google Patents

Combined model bridge toy Download PDF

Info

Publication number
CN202020926U
CN202020926U CN2011200463043U CN201120046304U CN202020926U CN 202020926 U CN202020926 U CN 202020926U CN 2011200463043 U CN2011200463043 U CN 2011200463043U CN 201120046304 U CN201120046304 U CN 201120046304U CN 202020926 U CN202020926 U CN 202020926U
Authority
CN
China
Prior art keywords
bridge
arch
pier
base
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200463043U
Other languages
Chinese (zh)
Inventor
李志年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011200463043U priority Critical patent/CN202020926U/en
Application granted granted Critical
Publication of CN202020926U publication Critical patent/CN202020926U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model provides a combined model bridge toy, which is characterized by mainly consisting of a bridge (1) and a bridge base (2) for supporting the bridge (1), wherein the bridge base (2) is also provided with a pier (3) for stabilizing the bridge (1), and the bridge (1) is connected onto the pier (3) through a suspension cable device, a cable stayed device or a banded arch device. By utilizing a set of bridge base and bridge module, the stress characteristics of the real bridge can be simulated by replacing different chains, banded arches, pulling rods and other components. Different bridges such as a suspension bridge, a cable stayed bridge and an arch bridge can be assembled through the disassembling and the installation by children, so the intelligence of the children can be developed, and the manipulative ability of the children can be improved.

Description

Built-up pattern bridge toy
Technical field
The utility model relates to the toy field, specifically is meant a kind of built-up pattern bridge toy.
Background technology
Existing bridge toy, it is simple in structure, form is single, and it is simple to cause combination to be installed, fixed-type, there are not stressed members such as chain, arch bar, tie rod, when children are at play yet, emphasis all in appearance at bridge, and bridge install and structure aspect do not bringing more enjoyment to children.
Existing bridge toy mainly exists following problem and defective:
The first, install at bridge, can not give full play to children's visionary and manipulative ability;
The second, children can not be fully understood that the kind and the force structure characteristics of various bridges in the process of assembling bridge;
The 3rd, existing Bridge Model toy form is single, can not assemble flexibly, does not have extensibility and challenge;
The 4th, existing Bridge Model toy relatively is fit to 3 to 5 years old stage child, plays as picture mosaic.Being not suitable for 5 to 10 years old children plays as cultivating interest.
The utility model content
Technical problem to be solved in the utility model provides a kind of built-up pattern bridge toy, utilize a cover bridge pedestal and a bridge module, by changing different chains, arch bar, pull bar and other parts, the loading characteristic of bridge in the simulating reality, dismounting and installation through children, assemble out different types of bridges such as suspension bridge, cable-stayed bridge, arch bridge, thereby reach the exploitation children's intelligence, strengthen its manipulative ability and cultivate the purpose of building interest.
The purpose of this utility model is achieved through the following technical solutions: built-up pattern bridge toy, mainly by bridge, and the bridge base that supports bridge is formed, also be provided with the bridge pier of firm bridge on described bridge base, described bridge is fixed on bridge base and the bridge pier by suspension cable device, oblique drawing device or arch strip device.
The quantity of described bridge base is two, and lays respectively at the bottom, two ends of bridge.
In order to make the toy car built-up pattern bridge by building smoothly, be positioned at the upper corners place at described bridge base and be provided with the concave station that all is complementary with bridge width and thickness; Also be respectively equipped with outward extending grafting piece at described bridge two ends, and be provided with on described bridge base and the groove of the piece coupling of pegging graft, described bridge adopts the grafting piece to be installed on the concave station of bridge base with cooperating of groove.
Produce for convenience, and further increase children's manipulative ability, described bridge adopts connection strap to be connected in sequence by plural bridge piece, and is equipped with fixing hole on each bridge piece.
The quantity of described bridge pier is four, and on four angles that are distributed in bridge of symmetry.
In order to make up suspension bridge, described suspension cable device comprises two iron chains that are positioned at the bridge top, and the suspension cable pull bar that iron chains and bridge are connected as one, and the bottom of described suspension cable pull bar is plugged in the fixing hole, and the top then is connected on the iron chains; Described bridge pier top is provided with perforation, also is being provided with the bridge pier support that passes perforation between two bridge piers on the same bridge base, and the two ends of described iron chains are connected to and are positioned on two bridge pier supports on the bridge base.
In order to make up cable-stayed bridge, described oblique drawing device comprises tiltedly pull bar; Be equipped with on described bridge pier sidewall more than one the tiltedly perforation of pull bar is installed, described tiltedly pull bar one end is connected on the bridge pier by perforation, and the other end then is installed in the fixing hole on the bridge; Simultaneously, also be provided with the bridge pier support between two bridge piers on the same bridge base, and be provided with the perforation that is used to install the bridge pier support on bridge pier, described bridge pier support is installed on the bridge pier by perforation.
In order to make up arch bridge, described arch strip device comprises two arch bars that are provided with perforation, and will encircle the arch bridge pull bar that bar and bridge connect as one; Be equipped with arch bar spliced eye on described bridge pier, described arch bar is installed on the bridge top by arch bar installing hole; The bottom of described arch bridge pull bar is plugged in the fixing hole, and the top then is connected in the installing hole of arch bar.
Between described two arch bars, also be provided with more than one arch bar support.
At last, on described bridge surface, also be pasted with the bridge floor labeling at the suspension bridge that constructs, cable-stayed bridge and arch bridge.
The utility model compared with prior art has following advantage and beneficial effect:
(1) the utility model is equipped with the various parts that make up bridge, ponders deeply and puts into practice through children, can assemble out various multi-form bridges, thereby fully cultivate children's imagination and manipulative ability;
(2) the utility model in the process of setting up various bridges, can be familiar with the essential structure and the loading characteristic of every kind of multi-form bridge by children;
(3) on basic platform of the present utility model, change a little, can assemble out the bridge of other new model, have extensibility;
(4) adopt bridge that the utility model playset installs according to children profile difference, its weight by toy car is also different, but has challenge;
(5) the utility model can be developed children's intelligence, cultivates the interest to building, is suitable as very much the study of students in middle and primary schools' scientific and technological activities subject and puts into practice the teaching aid use;
(6) the utility model can be assembled out the bridge of various ways with a pack module, has low cost, multifunctionality, is convenient to promote.
Description of drawings
Fig. 1 is assembled into the structural representation of suspension bridge for the utility model.
Fig. 2 is assembled into the structural representation of cable-stayed bridge for the utility model.
Fig. 3 is assembled into the structural representation of arch bridge for the utility model.
Fig. 4 is the plan structure schematic diagram of the utility model bridge piece.
Fig. 5 is the structural representation of the utility model connection strap.
Fig. 6 is the cross section structure schematic diagram of the utility model bridge base.
The structural representation of bridge pier when Fig. 7 assembles suspension bridge and cable-stayed bridge for the utility model.
The structural representation of bridge pier when Fig. 8 assembles arch bridge for the utility model.
Fig. 9 is the structural representation of the utility model suspension cable pull bar.
Figure 10 is the tiltedly structural representation of pull bar of the utility model.
Figure 11 is the structural representation of the utility model arch bar.
Figure 12 is the structural representation of the utility model arch bridge pull bar.
Figure 13 is the structural representation of the utility model arch bar support.
Wherein, the parts name of Reference numeral correspondence is called among the figure:
The 1-bridge, 2-bridge base, the 3-bridge pier, 4-bridge floor labeling, the 5-connection strap, the 6-concave station, the 7-iron chains, 8-suspension cable pull bar, 9-is pull bar tiltedly, and 10-encircles bar, 11-arch bar installing hole, 12-arch bridge pull bar, 13-arch bar support; 14-bridge pier support.
The specific embodiment
Below in conjunction with embodiment the utility model is described in further detail, but embodiment of the present utility model is not limited thereto.
Embodiment 1
Shown in Fig. 4~13, this toy mainly by bridge base 2, bridge pier 3, bridge 1, iron chains 7, arch bar 10, etc. form.
Producer only is equipped with required parts when producing this built-up pattern bridge toy, set up according to own imagination by player, and the parts title of concrete outfit and quantity can be with reference to following tables:
Sequence number Title Material specification Quantity Remarks
1 The bridge base Timber or plastics 2
2 Bridge pier Timber or plastics 4 Assembly suspension bridge and cable-stayed bridge are used
3 Bridge pier Timber or plastics 4 The assembly arch bridge is used
4 The bridge piece Timber or plastics 10
5 Iron chains Iron 2 Each one meter long
6 The arch bar Engineering plastics 2 Each one meter long
7 The arch bridge pull bar Aluminium or plastics 20
8 Oblique pull bar Aluminium or plastics 20
9 The suspension cable pull bar Aluminium or plastics 20
10 Nut Iron or plastics 44
11 The bridge floor labeling Adhesive sticker 3 meters
12 The bridge pier support Engineering plastics 2
13 Arch bar support Timber or plastics 2
14 Connection strap Aluminium or plastics 18
This toy models is by a set of model assembly, under the constant situation of bridge base 2 and bridge 1, by changing the fixture of bridge 1, can assemble out suspension bridge, cable-stayed bridge, arch bridge respectively.On this basis, can also derive other forms of bridge, but this need like that the children and the head of a family that start oneself develop assembling on this model platform.
Children are when utilizing the utility model assembly bridge, its general steps all is earlier bridge base 2 to be set, then according to the bridge grafting bridge pier 3 that will make up, be equipped with the inserted terminal of projection in bridge pier 3 bottoms, and be equipped with the groove that bridge pier 3 is installed at bridge base 2 upper surfaces, begin assembly bridge 1 after directly being plugged in bridge pier 3 on the bridge base 2, bridge 1 two ends are plugged on the bridge base 2, in order to guarantee the flatness of bridge 1 upper surface, on bridge base 2, be provided with the concave station 6 of placing bridge 1, the last kind that makes up bridge is more as required installed the suspension cable device, oblique drawing device or arch strip device stick the installation that bridge floor labeling 4 has promptly been finished whole bridge after installing.
Not only outward appearance is beautiful for each bridge of assembling out, and its mechanics requires also strict.So, must following several principles in installation process:
(1) regulates the flatness on bridge 1 surface by the length of regulating tie rod, and require every tie rod all evenly stressed;
(2) each bridge piece interconnects again, reaches lateral stressed balance;
(3) its bridge 1 weight and bridge base 2 balanced;
Only in this way could pass through the heaviest toy car of weight, the automobile that can pass through is heavy more, and its children's manipulative ability is also strong more.
Embodiment 2
Only be that with the difference of embodiment 1 as shown in Figure 1, this embodiment is the concrete steps that adopt above-mentioned parts assembling suspension bridge:
(a) two bridge bases 2 and ten bridge pieces are set the position, four suspension bridge bridge piers 3 are fixed in two bridge base 2 holes, suspension bridge bridge pier 3 upper ends are provided with the perforation that bridge pier support 14 is installed;
(b) assembling bridge 1, owing on two relative sides of bridge piece, be provided with three installing holes, after setting ten bridge pieces successively, make all installing holes all be in bridge 1 side, then connection strap 5 is inserted in the nearest installing hole of every adjacent two bridge pieces, thereby ten bridge pieces are integrated;
(c) bridge pier support 14 is fixed in the perforation of bridge pier 3 upper ends after passing suspension bridge iron chains 7, in order to the spacing between firm bridge pier 3 and definite two bridge piers 3;
(d) 8 one on suspension cable pull bar is passed bridge 1, iron chains 7 is passed in the other end, and hangs upper cap nut at two ends, and by regulating the nut at suspension cable pull bar 8 two ends, fixedly the distance between bridge 1 and the iron chains 7 is used for regulating the height on bridge 1 plane;
(e) assemble bridge after, stick bridge floor labeling 4, suspension bridge has just been assembled successfully.
Embodiment 3
The difference of embodiment 2 only is that as shown in Figure 2, this embodiment is the concrete steps that adopt above-mentioned parts assembling cable-stayed bridge:
(a) two bridge bases 2 and ten bridge pieces are set the position, four cable-stayed bridge bridge piers 3 are fixed in two bridge base 2 holes, cable-stayed bridge bridge pier 3 tops are provided with the perforation that bridge pier support 14 is installed, and sidewall is provided with at least one the tiltedly perforation of pull bar 9 is installed;
(b) assembling bridge 1, owing on two relative sides of bridge piece, be provided with three installing holes, after setting ten bridge pieces successively, make all installing holes all be in bridge 1 side, then connection strap 5 is inserted in the nearest installing hole of every adjacent two bridge pieces, thereby ten bridge pieces are integrated;
(c) bridge pier support 14 is fixed in the perforation of bridge pier 3 upper ends, in order to the spacing between firm bridge pier 3 and definite two bridge piers 3;
(d) tiltedly 9 one on pull bar passes bridge 1, and the perforation of bridge pier 3 is passed in the other end, and hangs upper cap nut at two ends, by regulating the tiltedly nut at pull bar 9 two ends, regulates the height on bridge 1 plane;
(e) assemble bridge after, stick bridge floor labeling 4, cable-stayed bridge has just been assembled successfully.
Embodiment 4
The difference of embodiment 3 only is that as shown in Figure 3, this embodiment is the concrete steps that adopt above-mentioned parts assembling arch bridge:
(a) two bridge bases 2 and ten bridge pieces are set the position, four arch bridge bridge piers 3 are fixed in two bridge base 2 holes, arch bridge bridge pier 3 sidewalls are provided with arch bar installing hole 11;
(b) assembling bridge 1, owing on two relative sides of bridge piece, be provided with three installing holes, after setting ten bridge pieces successively, make all installing holes all be in bridge 1 side, then connection strap 5 is inserted in the nearest installing hole of every adjacent two bridge pieces, thereby ten bridge pieces are integrated;
(c) two arch bars 10 pass the hole of encircleing bar support 13 and are placed on formation bridge arch in the arch bar installing hole 11;
(d) 12 1 on arch bridge pull bar is passed bridge 1, bridge arch is passed in the other end, and hangs upper cap nut at two ends, regulates the height on bridge 1 plane by the nut of regulating arch bridge pull bar 12 two ends;
(e) assemble bridge after, stick bridge floor labeling 4, arch bridge has just been assembled successfully.
The above; it only is preferred embodiment of the present utility model; be not that the utility model is done any pro forma restriction, to any simple modification, equivalent variations that above embodiment did, all fall within the protection domain of the present utility model on every foundation technical spirit of the present utility model.

Claims (10)

1. built-up pattern bridge toy, it is characterized in that: mainly by bridge (1), and the bridge base (2) that supports bridge (1) is formed, also be provided with the bridge pier (3) of firm bridge (1) on described bridge base (2), described bridge (1) is fixed on bridge base (2) and the bridge pier (3) by suspension cable device, oblique drawing device or arch strip device.
2. built-up pattern bridge toy according to claim 1 is characterized in that: the quantity of described bridge base (2) is two, and lays respectively at the bottom, two ends of bridge (1).
3. built-up pattern bridge toy according to claim 2 is characterized in that: be positioned at the upper corners place at described bridge base (2) and be provided with the concave station (6) that all is complementary with bridge (1) width and thickness; Also be respectively equipped with outward extending grafting piece at described bridge (1) two ends, and on described bridge base (2), be provided with and the groove of the piece coupling of pegging graft, described bridge (1) adopts on grafting piece and the concave station (6) that is installed on bridge base (2) cooperating of groove.
4. according to each described built-up pattern bridge toy of claim 1~3, it is characterized in that: described bridge (1) adopts connection strap (5) to be connected in sequence by plural bridge piece, and is equipped with fixing hole on each bridge piece.
5. built-up pattern bridge toy according to claim 4 is characterized in that: the quantity of described bridge pier (3) is four, and on four angles that are distributed in bridge (1) of symmetry.
6. built-up pattern bridge toy according to claim 5, it is characterized in that: described suspension cable device comprises two iron chains (7) that are positioned at bridge (1) top, and the suspension cable pull bar (8) that iron chains (7) and bridge (1) are connected as one, the bottom of described suspension cable pull bar (8) is plugged in the fixing hole, and the top then is connected on the iron chains (7); Described bridge pier (3) top is provided with perforation, also be provided with the bridge pier support (14) that passes perforation between two bridge piers (3) that are positioned on the same bridge base (2), the two ends of described iron chains (7) are connected on the bridge pier support (14) that is positioned on two bridge bases (2).
7. built-up pattern bridge toy according to claim 5 is characterized in that: described oblique drawing device comprises tiltedly pull bar (9); Be equipped with on described bridge pier (3) sidewall more than one the tiltedly perforation of pull bar (9) is installed, described tiltedly pull bar (9) one ends are connected on the bridge pier (3) by perforation, and the other end then is installed in the fixing hole on the bridge (1); Simultaneously, also be provided with bridge pier support (14) between two bridge piers (3) on the same bridge base (2), and be provided with the perforation that is used to install bridge pier support (14) on bridge pier (3), described bridge pier support (14) is installed on the bridge pier (3) by perforation.
8. built-up pattern bridge toy according to claim 5 is characterized in that: described arch strip device comprises be provided with perforation two arch bars (10), and will encircle the arch bridge pull bar (12) that bar (10) and bridge (1) connect as one; Be equipped with arch bar spliced eye (11) on described bridge pier (3), described arch bar (10) is installed on bridge (1) top by arch bar installing hole (11); The bottom of described arch bridge pull bar (12) is plugged in the fixing hole, and the top then is connected in the installing hole of arch bar (10).
9. built-up pattern bridge toy according to claim 8 is characterized in that: also be provided with more than one arch bar support (13) between described two arch bars (10).
10. according to each described built-up pattern bridge toy in the claim 6~9, it is characterized in that: on described bridge (1) surface, also be pasted with bridge floor labeling (4).
CN2011200463043U 2011-02-24 2011-02-24 Combined model bridge toy Expired - Fee Related CN202020926U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200463043U CN202020926U (en) 2011-02-24 2011-02-24 Combined model bridge toy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200463043U CN202020926U (en) 2011-02-24 2011-02-24 Combined model bridge toy

Publications (1)

Publication Number Publication Date
CN202020926U true CN202020926U (en) 2011-11-02

Family

ID=44845896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200463043U Expired - Fee Related CN202020926U (en) 2011-02-24 2011-02-24 Combined model bridge toy

Country Status (1)

Country Link
CN (1) CN202020926U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103623594A (en) * 2013-12-17 2014-03-12 王乐强 Bridge series toy and manufacturing method of bridge series toy model
CN103657115A (en) * 2013-11-26 2014-03-26 李羲 Bridge building game device
CN109334331A (en) * 2018-11-29 2019-02-15 泰顺县华工启明星培训学校有限公司 Langfang bridge craftwork is spliced in a kind of intelligence development

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103657115A (en) * 2013-11-26 2014-03-26 李羲 Bridge building game device
CN103657115B (en) * 2013-11-26 2016-03-09 李羲 Game device built by bridge
CN103623594A (en) * 2013-12-17 2014-03-12 王乐强 Bridge series toy and manufacturing method of bridge series toy model
CN109334331A (en) * 2018-11-29 2019-02-15 泰顺县华工启明星培训学校有限公司 Langfang bridge craftwork is spliced in a kind of intelligence development

Similar Documents

Publication Publication Date Title
CN202020926U (en) Combined model bridge toy
CN207101817U (en) Multi-functional expansion combines the unit with teaching and training
CN106422369B (en) Brush calligraphy splicing toy and brush calligraphy fixing plate applicable to same
CN202942636U (en) Multifunctional slide for children
CN206276046U (en) Flat board building blocks build combination unit
CN202196526U (en) Job-hunting sand table used for simulating interview site of enterprise
CN208752855U (en) A kind of Business Management Specialty teaching demonstration device
CN201150766Y (en) Combined type multifunctional toy
CN208873387U (en) A kind of prefabricated assembled frame structure joint structure signal and construction simulation teaching aid
CN209538394U (en) A kind of pull-type foldable house
CN208938399U (en) A kind of art teaching drawing board for being convenient for finding drawing angle accurately
CN110211480A (en) A kind of long-span cablestayed bridges model applied to BIM teaching
CN204428819U (en) Rail toy syndeton
CN201632070U (en) Intelligent assembling toy
CN207165020U (en) A kind of auto repair teaching equipment
CN216855674U (en) Low structure construction dynamic toy
González-Rodrigo et al. Experiential Learning through Scale Structural Models
CN206444190U (en) A kind of magnetic assembled toy
CN205185702U (en) Novel easel for art design
CN208406087U (en) A kind of stackable splicing building blocks
CN210845117U (en) Horse jumping stand for physical exercise
CN207856965U (en) A kind of easy-to-dismount bench for chemistry experiment
CN218853475U (en) Children toy subassembly that can multi-direction concatenation
CN212631739U (en) Wood box toy
CN108181066A (en) The design method of airborne glass vibration test fixture

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111102

Termination date: 20140224