Movable construction platform for grouting Download PDFInfo
- Publication number
- CN202012082U CN202012082U CN2011201043491U CN201120104349U CN202012082U CN 202012082 U CN202012082 U CN 202012082U CN 2011201043491 U CN2011201043491 U CN 2011201043491U CN 201120104349 U CN201120104349 U CN 201120104349U CN 202012082 U CN202012082 U CN 202012082U
- Authority
- CN
- China
- Prior art keywords
- grouting
- platform
- main support
- support
- movable construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to a movable construction platform for grouting, which comprises an operating platform. The operating platform is arranged on a main support and an auxiliary support. A sliding pipe is arranged at the lower end of the main support. The sliding pipe is arranged in a rail. A traction device is connected with the main support. The main support is fixedly connected with the auxiliary support. The traction device consists of a hand-drive block, a steel wire rope and a mooring anchor. Supporting structures adopt the field welding method, so that the movable construction platform for grouting is convenient to install. Due to the existence of a traction system, the flexibility of the platform is improved. The safety of the movable construction platform device is effectively ensured by an antiskid clamp. Meanwhile, the construction progress is speeded up and the production cost is reduced.
Description
Technical field
The utility model relates to a kind of provisions for grouting, the portable operation platform of especially a kind of grouting.
Background technology
Existing water conservancy and hydropower multi-purpose project is oozed the control engineering and is generally adopted curtain antiseepage form, because curtain grouting is generally carried out in the foundation grouting gallery, limited by orographic condition, a lot of curtain axis all on the slope, particularly steep and long slope exists in a large number, is subjected to the influence of hole preface and other factors during grouting construction, rig moves more frequent, adopt fixed platform can not effectively solve this difficult problem, and construction efficiency is low, is not suitable for the demand that the water conservancy and hydropower hinge oozes the control duration.
Summary of the invention
Technical problem to be solved in the utility model provides the portable operation platform of a kind of grouting, has realized that operation platform can install according to the site contour condition, and is convenient, flexible, guaranteed grouting construction safety, accelerated construction speed.
For solving the problems of the technologies described above, the technical scheme that the utility model adopted is: the portable operation platform of a kind of grouting, comprise operating platform, operating platform is installed on main support and the supplemental support, the main lower end of supporting is provided with sliding tube, sliding tube is installed in orbit, draw-gear and main support and connection.
The main support fixedlyed connected with supplemental support.
Draw-gear is made up of bottle gouard moved by hands, wire rope and mooring anchor.
The portable operation platform of the grouting that the utility model provides, because braced structures all adopts field Welding, easy for installation, and because the existence of trailer system has increased the flexibility of platform, antiskid card has effectively guaranteed the safety of portable operation platform device, accelerate construction speed simultaneously, reduced cost of production.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is that Fig. 1 is the A-A sectional view.
The specific embodiment
As attached illustrated in figures 1 and 2, the utility model comprises operating platform 1, and operating platform 1 is installed on main support 2 and the supplemental support 7, and main 2 lower ends of supporting are provided with sliding tube 6, and sliding tube 6 is installed in the track 4, and draw-gear 3 supports 2 with the master and is connected.Main support 2 and fixedly connected with supplemental support 7.Draw-gear 3 is made up of bottle gouard moved by hands, wire rope and mooring anchor.
Installation process of the present utility model is as follows:
Lay two tracks of making by channel-section steel 4 along the antiseepage axis, and it is track 4 is fixing on the slope with M24 stone bolt or φ 18# reinforcing bar, in the suitable rail groove of lower horizontal, wall thickness 6mm steel pipe is installed earlier as slide bar 6, slide bar 6 length are selected according to rig model and slope angle, the welding channel-section steel supports 2 as main on slide bar 6 then, supplemental support 7 adopts steel pipe to make, main support 2 and supplemental support 7 adopt welding manners to fix, main support 2 and supplemental support 7 constitute a bracing frame, lay the thick plank of 5cm and form operating platform 1 on bracing frame.Install φ 36mm reinforcing bar as mooring anchor in the upper level section, mooring anchor, wire rope, bottle gouard moved by hands constitute draw-gear 3 bracing frame are connected into portable operation platform.
The course of work of the present utility model is as follows:
During work, rig is put on the portable operation platform with relevant supporting Work tool, move portable operation platform to the construction part place by draw-gear 3, portable operation platform is fixed, can begin the curtain grouting construction after the rig contraposition accurately with anti-skidding U type card 5.The fence protection be to perform during construction on the platform, and platform operations rules and safety management regulation formulated.
Claims (3)
1. portable operation platform of grouting, comprise operating platform (1), it is characterized in that: operating platform (1) is installed in main the support on (2) and the supplemental support (7), main (2) lower end of supporting is provided with sliding tube (6), sliding tube (6) is installed in the track (4), and draw-gear (3) is connected with main support (2).
2. the portable operation platform of grouting according to claim 1 is characterized in that: fixedly connected with supplemental support (7) in main support (2).
3. the portable operation platform of grouting according to claim 1 is characterized in that: draw-gear (3) is made up of bottle gouard moved by hands, wire rope and mooring anchor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201043491U CN202012082U (en) | 2011-04-11 | 2011-04-11 | Movable construction platform for grouting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011201043491U CN202012082U (en) | 2011-04-11 | 2011-04-11 | Movable construction platform for grouting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202012082U true CN202012082U (en) | 2011-10-19 |
Family
ID=44782695
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011201043491U Expired - Fee Related CN202012082U (en) | 2011-04-11 | 2011-04-11 | Movable construction platform for grouting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202012082U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951700A (en) * | 2016-05-13 | 2016-09-21 | 林森 | Grouting construction method based on offshore drilling platform technology |
-
2011
- 2011-04-11 CN CN2011201043491U patent/CN202012082U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105951700A (en) * | 2016-05-13 | 2016-09-21 | 林森 | Grouting construction method based on offshore drilling platform technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926669B (en) | A kind of Construction Method of Metro Station | |
CN101929341B (en) | Construction method for TBM synchronization lining | |
CN102345461B (en) | Subsequent project and shield driving parallel construction method for long-distance railway tunnel | |
CN102650118B (en) | Construction device and method for erecting prefabricated beam by slip method | |
CN103939114B (en) | A kind of outstanding rail chassis lining construction method | |
CN201513120U (en) | Longitudinal and transversal movement device of drilling machine | |
CN104060844A (en) | Sliding device and lifting device for truss frame of steel structural transfer floor of the high-rise building and construction method thereof | |
CN102200019B (en) | Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof | |
CN102720432B (en) | Self-propelled underground boring jumbo | |
CN204002794U (en) | The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section | |
CN202596743U (en) | Formwork trolley for underground tunnel pull-rod-free side wall construction | |
CN103123016A (en) | Construction method for laying gas pipelines along bridge | |
CN106193117A (en) | A kind of assembling and construction method of the prefabricated pipe gallery in underground | |
CN202991063U (en) | Large-section tunnel hydraulic trolley | |
CN204402559U (en) | A kind of large jacking force shield machine air pushes through hole truss-like reaction support group | |
CN203531924U (en) | Lifting type moving trolley provided with tracks, wheels and templates | |
CN204982673U (en) | Continuous steel of high mound of hollow thin wall structure 0# section binds and pre -compaction support in 100 -meter dash | |
CN105544409A (en) | Erecting composite beam on-site section splicing girder construction technology of double guide beam bridge erecting machine | |
CN202012082U (en) | Movable construction platform for grouting | |
CN107654730B (en) | Slurry pipe connecting auxiliary device behind slurry shield trolley and using method thereof | |
CN204457800U (en) | Large Cross-section Tunnel in Subway Engineering two serves as a contrast the simple and easy chassis mould of arch wall separate type and builds construction equipment | |
CN106013783A (en) | Formwork support and erecting method thereof | |
CN205875162U (en) | Unilateral formula rock -anchored beam concrete placement rebar installation platform truck | |
CN115853518A (en) | Shield construction method using subway crossover arrangement | |
CN102277839A (en) | Open hole construction additionally arranged on existing electrified railway and rapid construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111019 Termination date: 20200411 |