CN202007385U - Connecting device for bottom die and side die of high pier coping construction template in highway - Google Patents

Connecting device for bottom die and side die of high pier coping construction template in highway Download PDF

Info

Publication number
CN202007385U
CN202007385U CN 201120087429 CN201120087429U CN202007385U CN 202007385 U CN202007385 U CN 202007385U CN 201120087429 CN201120087429 CN 201120087429 CN 201120087429 U CN201120087429 U CN 201120087429U CN 202007385 U CN202007385 U CN 202007385U
Authority
CN
China
Prior art keywords
bed die
die
angle steel
side form
high pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120087429
Other languages
Chinese (zh)
Inventor
林定权
石雅清
应文兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN 201120087429 priority Critical patent/CN202007385U/en
Application granted granted Critical
Publication of CN202007385U publication Critical patent/CN202007385U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a connecting device for a bottom side and a side die of a high pier coping construction template in a highway and belongs to the technical field of bridge construction. The connecting device comprises the side die (1) and the bottom die (2) and is characterized in that the bottom die (2) is provided with an extending end on the outer side of the side die (1); connecting mechanisms are arranged on the lower side of the extending end of the bottom die (2) and on the lower edge of the outer side of the side die (1); each connecting mechanism comprises angle steel I (3), angle steel II (5) and a rubber sponge cushion (4), wherein the angle steel I (3) is arranged on the lower side of the extending end of the bottom die (2) and is fixedly connected with the bottom die (2); the angle steel II (5) is arranged on the lower edge outside the side die (1) and is fixedly connected with the side die (1); the rubber sponge cushion (4) is arranged between the upper surface at the extending end of the bottom die (2) and the angle steel II (5); and the side die (1), the rubber sponge cushion (4) and the bottom die (2) are connected by bolts. The connecting device is simple in operation, convenient to dismantle, safe and reliable and is especially suitable for construction operations of high pier copings of highways.

Description

The high pier capping beam construction formwork of speedway bottom side mould linkage
Technical field
The utility model relates to the high pier capping beam construction formwork of a kind of speedway linkage, and particularly a kind of bent cap construction formwork bottom side mould linkage belongs to technical field of bridge construction.
Background technology
It is whole large-scale punching block construction more widely that the high pier capping beam template construction of speedway is used, control bent cap physique amount has a key element, be that stencil design is made, in practice, the reasonability that has also confirmed stencil design fully is that compactness and the easy operating that bed die is connected with side form is vital.Traditional bent cap template construction bed die and side form generally are to adopt " at the bottom of the side bag " bolt type of attachment, requirement of strength to connecting bolt is higher, and side form is easily slided by gravity effect, cement paste is overflowed from seam, the bent cap surface forms " voids and pits ", in high pier construction, easily produce " mould rises ", influence the construction quality of high pier capping beam, the installation of side form is wayward in high pier construction, cause when removing side form and need move horizontally side form, vertical lifting difficulty is bigger, has increased the difficulty that side form is installed and removed.
Summary of the invention
The utility model provides a kind of easy construction in order to remedy the deficiencies in the prior art, guarantees the bent cap quality, and safety is higher, and the dismounting cycle is short, the high pier capping beam construction formwork of the speedway that cost is low linkage.
The utility model is achieved by the following technical solution: it comprises side form and bed die, its special character is: described bed die has elongated end in the side form outside, downside and side form outside lower edge at the bed die elongated end are provided with bindiny mechanism, described bindiny mechanism comprises the angle steel I that is arranged on bed die elongated end downside and fixedlys connected with bed die, be arranged on the side form outside lower limb and the angle steel II of fixedlying connected with side form and be arranged on bed die elongated end upper surface and angle steel II between rubber spongy cushion, described side form, rubber spongy cushion and bed die are connected by screw rod.
The utility model has broken through traditional bent cap template construction bed die and side form adopts " at the bottom of the side bag " bolted form, but adopts the syndeton of " end bag side ".Side form and bed die connect by the bindiny mechanism that is arranged on the template outside, and guarantee sealing between bed die and the side form by being arranged on rubber spongy cushion in the bindiny mechanism, thereby guarantee not take place spillage.After engineering is finished the bolt of bindiny mechanism dismantled and get final product, can not damage side form and bed die.Its inner corner face of angle steel I that is arranged on bed die elongated end downside in the utility model can be connected with stiffener, can guarantee the bonding strength of whole device.
Described angle steel I and bed die fixedly are welded to connect.Can strengthen base plate by angle steel like this and fix, make bed die not yielding, strengthen its rigidity, safe and reliable.
In order to guarantee to connect reliably, described side form, rubber spongy cushion and bed die are connected by stud.Connection by stud can guarantee fixedlying connected of side form, rubber spongy cushion and bed die, guarantees the sealing of bed die panel and side form panel and bent cap beam surface, guarantees the bent cap construction quality.
The beneficial effects of the utility model are: the utility model adopts the syndeton form of " end bag side " by bed die and side form, makes side form not be subject to gravity effect and slides, and can effectively guarantee the bent cap surface quality; By between bed die elongated end upper surface and angle steel II, rubber spongy cushion being set, can effectively guarantee the sealing between bed die and the side form, influence construction quality thereby be difficult for taking place spillage.And reliable syndeton can effectively guarantee the sealing of bed die panel and side form panel and bent cap beam surface, guarantees the bent cap construction quality.The syndeton form that the utility model adopted also has simple to operate, and it is convenient to remove, and maintenance is safe and reliable easily, and the advantage that economizes on resources or the like is very suitable for the high pier capping beam construction operation of speedway.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment;
Among the figure: 1, side form, 2, bed die, 3, angle steel I, 4, rubber spongy cushion, 5, angle steel II, 6, bolt.
The specific embodiment
Also in conjunction with the accompanying drawings the utility model is further described below by non-limiting embodiment:
As shown in drawings, the high pier capping beam construction formwork of a kind of speedway bottom side mould linkage, comprise side form 1 and bed die 2, described bed die 2 has elongated end in side form 1 outside, downside and side form 1 outside lower edge at bed die 2 elongated ends are provided with bindiny mechanism, and described bindiny mechanism comprises and is arranged on bed die 2 elongated end downsides and the angle steel I 3 of fixedlying connected with bed die 2, is arranged on side form 1 outside lower limb and the angle steel II 5 of fixedlying connected with side form 1, is arranged on the rubber spongy cushion 4 between bed die 2 elongated end upper surfaces and the angle steel II 5.Wherein, one of them right-angle side of angle steel I 3 and bed die 2 are by being welded together, and one of them right-angle side of angle steel II5 and side form 1 are by being welded together.Angle steel I 3, angle steel II 5, rubber spongy cushion 4 are provided with screw, and side form 1, rubber spongy cushion 4 and bed die 2 are fixedlyed connected by stud 6.

Claims (3)

1. the high pier capping beam construction formwork of speedway bottom side mould linkage, comprise side form (1) and bed die (2), it is characterized in that: described bed die (2) has elongated end in side form (1) outside, downside and side form (1) outside lower edge at bed die (2) elongated end are provided with bindiny mechanism, described bindiny mechanism comprises the angle steel I (3) that is arranged on bed die (2) elongated end downside and fixedlys connected with bed die (2), be arranged on side form (1) outside lower limb and the angle steel II (5) of fixedlying connected with side form (1) and be arranged on bed die (2) elongated end upper surface and angle steel II (5) between rubber spongy cushion (4), described side form (1), rubber spongy cushion (4) is connected by bolt with bed die (2).
2. the high pier capping beam construction formwork of speedway according to claim 1 bottom side mould linkage is characterized in that: described angle steel I (3) fixedly is welded to connect with bed die (2).
3. the high pier capping beam construction formwork of speedway according to claim 1 and 2 bottom side mould linkage, it is characterized in that: described side form (1), rubber spongy cushion (4) and bed die (2) are connected by stud.
CN 201120087429 2011-03-29 2011-03-29 Connecting device for bottom die and side die of high pier coping construction template in highway Expired - Fee Related CN202007385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120087429 CN202007385U (en) 2011-03-29 2011-03-29 Connecting device for bottom die and side die of high pier coping construction template in highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120087429 CN202007385U (en) 2011-03-29 2011-03-29 Connecting device for bottom die and side die of high pier coping construction template in highway

Publications (1)

Publication Number Publication Date
CN202007385U true CN202007385U (en) 2011-10-12

Family

ID=44749040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120087429 Expired - Fee Related CN202007385U (en) 2011-03-29 2011-03-29 Connecting device for bottom die and side die of high pier coping construction template in highway

Country Status (1)

Country Link
CN (1) CN202007385U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105150361A (en) * 2015-09-30 2015-12-16 长沙远大住宅工业集团有限公司 Special mould with modeled-outline prefabricate floor and manufacturing method using mould
CN107605151A (en) * 2017-10-18 2018-01-19 北京城建长城建筑装饰工程有限公司 Wall body casting template
CN108035541A (en) * 2017-12-25 2018-05-15 宁波二十冶建设有限公司 A kind of staircase shaping template and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105150361A (en) * 2015-09-30 2015-12-16 长沙远大住宅工业集团有限公司 Special mould with modeled-outline prefabricate floor and manufacturing method using mould
CN107605151A (en) * 2017-10-18 2018-01-19 北京城建长城建筑装饰工程有限公司 Wall body casting template
CN107605151B (en) * 2017-10-18 2019-09-24 北京城建长城建筑装饰工程有限公司 Wall body casting template
CN108035541A (en) * 2017-12-25 2018-05-15 宁波二十冶建设有限公司 A kind of staircase shaping template and construction method

Similar Documents

Publication Publication Date Title
CN204024679U (en) Buried water stop fastening devices in a kind of tunnel lining hoop
CN106381926A (en) Detachable assembly type splicing node for reinforced concrete columns
CN202007385U (en) Connecting device for bottom die and side die of high pier coping construction template in highway
CN205000631U (en) Reinforcing apparatus of outer shear force wall aluminum mould toe riser
CN204551276U (en) A kind of for pacifying the adjusting device of tearing pier body formwork open
CN202577165U (en) Leak-proof anti-rot device used at root of bridge crash barrier
CN204000599U (en) Steel bridge bridge plate dilatation joint waterproof shock-absorbing device
CN205291967U (en) Automatic seal stamping device
CN204401377U (en) Adjustable ballastless track self-compacting concrete perfusion gang form
CN205276124U (en) Ready -package bridge telescoping device for light rail
CN204604563U (en) A kind of pipe of cement casting equipment
CN203947419U (en) A kind of high-speed railway bridge pinner template
CN209959259U (en) Water stop belt positioning and fastening plug board device for tunnel trolley lining construction
CN208280412U (en) A kind of removable truss floor support plate bottom plate
CN204126253U (en) Metal framework assembling combination formwork structure
CN209179537U (en) A kind of concrete chimney transformation reinforcing column construction formwork
CN210316555U (en) Novel female corner reinforcing piece for wood mold
CN207092546U (en) A kind of subsiding crack both sides shear wall formwork for placing frame being easily installed
CN208441315U (en) A kind of close rib high score sub-panel template
CN204898530U (en) Pier shaft template is strengthened to steel construction
CN203462753U (en) Large steel formwork for double-layer reinforced concrete plate wall cavity construction
CN203831551U (en) Prefabricated road water passing groove mould
CN203905510U (en) High-precision embedded bolt mold
CN202214984U (en) Reinforcing apparatus for external corner of wall template
CN204456827U (en) A kind of interchangeable type aluminium-plastic assembling construction formwork

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20111012

Termination date: 20150329

EXPY Termination of patent right or utility model