CN201993399U - Casing of energy meter - Google Patents
Casing of energy meter Download PDFInfo
- Publication number
- CN201993399U CN201993399U CN2010206855316U CN201020685531U CN201993399U CN 201993399 U CN201993399 U CN 201993399U CN 2010206855316 U CN2010206855316 U CN 2010206855316U CN 201020685531 U CN201020685531 U CN 201020685531U CN 201993399 U CN201993399 U CN 201993399U
- Authority
- CN
- China
- Prior art keywords
- pillar
- wiring board
- opening
- energy meter
- drain pan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Electric Clocks (AREA)
Abstract
The utility model discloses a casing of an energy meter, which facilitates installation of two circuit boards and has high circuit board installation efficiency. The casing comprises a bottom casing and at least three pillars are arranged on the lateral face in the bottom casing. Each pillar is provided with an elastic first opening used for limiting a first circuit board to move along the axial direction of the pillar. At least one pillar is further provided with a second opening used for limiting a second circuit board to move along the axial direction of the pillar, and the second opening is located on the pillar at an elastic portion which can be extended towards the outside of the bottom casing. Except the pillar provided with the second opening, each of the other pillars is provided with a second protrusion used for limiting the second circuit board to move along the direction perpendicular to the axis of the support.
Description
Technical field
The utility model relates to the electric energy meter technical field, specifically is a kind of electric energy meter watchcase.
Background technology
A kind of electric energy meter watchcase is arranged at present, and it comprises drain pan, and drain pan is used to support two wiring boards, owing to adopt screw that wiring board is installed in the drain pan, so installation effectiveness is lower, comparatively inconvenience is installed.
The utility model content
The technical problems to be solved in the utility model is to provide two wiring boards of a kind of convenience to install, the high electric energy meter watchcase of installation circuit plate efficiency.
The technical solution of the utility model is, the utility model electric energy meter watchcase, and it comprises drain pan, the drain pan medial surface is provided with at least three pillars; Be equipped with rubber-like first opening that restriction first wiring board moves along the pillar axes direction on each pillar; At least one also is provided with second opening that moves along the pillar axes direction of restriction second wiring board in the described pillar, and second opening is in the elastic part that can be strutted by elasticity outside drain pan of pillar; Pillar except that the pillar that is provided with second opening all also is provided with restriction second wiring board along second projection of moving perpendicular to the direction of pillar axes.
After adopting said structure, the utility model compared with prior art has the following advantages: because the drain pan medial surface is provided with at least three pillars; Be equipped with rubber-like first opening that restriction first wiring board moves along the pillar axes direction on each pillar, like this, three first openings limit a plane, just can utilize first opening to clamp and fix first wiring board, when first wiring board is installed, first opening that can strut the pillar of drain pan one side is earlier put into first wiring board, one side part, then the other side that first wiring board is relative against the pillar that is positioned at the other side of drain pan to lower slider, in slipping into corresponding first opening; And at least one also is provided with second opening that moves along the pillar axes direction of restriction second wiring board in the described pillar, and second opening is in the elastic part that can be strutted by elasticity outside drain pan of pillar; Pillar except that the pillar that is provided with second opening all also is provided with restriction second wiring board along second projection of moving perpendicular to the direction of pillar axes, like this, second opening and second projection limit a plane, just can utilize second opening and second projection to clamp and fix second wiring board, when second wiring board is installed, can earlier the spacing hole of second wiring board be aimed at each second projection, second wiring board is taken advantage of a situation downwards then, can strut elastic part when the second wiring board upper limit hole and second projection are matched with hand elasticity outside drain pan, part, the second wiring board side snaps in second opening, thereby finishes installation; To sum up, the utility model need not screw first wiring board and second wiring board is installed, and has the wiring board of convenience and installs, and the high advantage of circuit plate efficiency is installed.
As improvement, the next door of described first opening is provided with and is used to limit first wiring board along first projection of moving perpendicular to the direction of pillar axes, and fixing of such first wiring board is more reliable.
As further improvement, described elastic part is provided with the guiding surface that conveniently struts it, can rely on the outer elasticity of a side direction drain pan of second wiring board that moves downward to strut elastic part like this, snap in second opening, promptly more convenient installation with the office of a side of convenient second wiring board.
As further improvement, described drain pan also is provided with at least one and limits second wiring board along the 3rd projection of moving perpendicular to the direction of pillar axes, and fixing of such second wiring board is more reliable.
As further improvement, described pillar is four, two one group, be located at respectively on two opposed inside faces of drain pan, and wiring board is stressed more even like this, more helps the protection to wiring board.
Description of drawings
Fig. 1 is the structural representation of the utility model electric energy meter watchcase.
Fig. 2 is the structural representation that installs first wiring board of the utility model electric energy meter watchcase.
Fig. 3 is the structural representation that installs second wiring board of the utility model electric energy meter watchcase.
Shown in the figure, 1, drain pan, 2, pillar, 3, first wiring board, 4, first opening, 4.1, top, 4.2, the lower part, 5, second wiring board, 6, second opening, 7, elastic part, 7.1, guiding surface, 8, second projection, 9, first projection, the 10, the 3rd projection.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
The utility model electric energy meter watchcase, it comprises drain pan 1, drain pan 1 medial surface is provided with at least three pillars 2; Be equipped with rubber-like first opening 4 that restriction first wiring board 3 moves along pillar 2 axis directions on each pillar 2; At least one also is provided with the elastic part 7 that can be strutted by elasticity outside drain pan 1 that second opening, 6, the second openings 6 that move along pillar 2 axis directions of restriction second wiring board 5 are in pillar 2 in the described pillar 2; Pillar 2 except that the pillar 2 that is provided with second opening 6 all also is provided with a restriction second wiring board 5 along second projection 8 of moving perpendicular to the direction of pillar 2 axis.Concrete structure is shown in Fig. 1 or 2 or 3.In this example, pillar 2 and drain pan 1 are through injection mo(u)lding, and described first opening comprises two parts 4.1,4.2 up and down, and lower part 4.2 is the elastic sheet of excellent toughness, and the elasticity of lower part 4.2 and elastic part 7 is guaranteed by the elasticity of plastic material.
The next door of described first opening 4 is provided with and is used to limit first wiring board 3 along first projection 9 of moving perpendicular to the direction of pillar 2 axis.
Described elastic part 7 is provided with the guiding surface 7.1 that conveniently struts it.
Described drain pan 1 also is provided with at least one and limits second wiring board 5 along the 3rd projection 10 of moving perpendicular to the direction of pillar 2 axis, in this example is 2.
Described pillar 2 is four, two one group, be located at respectively on two opposed inside faces of drain pan 1, what be provided with second opening 6 is two, remaining two are provided with second projection 8, and the pillar 2 that is provided with second opening 6 and second projection 8 is respectively established one on each medial surface.
When first wiring board 3 is installed, can earlier first wiring board, 3 one sides be filled in first opening 4 of two pillars 2 on drain pan 1 one medial surfaces, first wiring board, 3 opposite sides on the another side relative with a described medial surface two pillars 2 and to lower slider, by sliding, first wiring board, 3 opposite sides are slipped in first opening 4 of two pillars 2 on the described another side, and then first wiring board 3 is installed.When second wiring board 5 is installed, can earlier the spacing hole of second wiring board 5 be aimed at each second projection 8, second wiring board 5 is taken advantage of a situation downwards then, one side of second wiring board 5 struts elastic part when second wiring board, the 5 upper limit holes and second projection 8 are matched along guiding surface 7.1 elasticity outside drain pan, part, second wiring board, 5 side snaps in second opening 6, thereby finishes installation.
Claims (6)
1. electric energy meter watchcase, it comprises drain pan, it is characterized in that, the drain pan medial surface is provided with at least three pillars; Be equipped with rubber-like first opening that restriction first wiring board moves along the pillar axes direction on each pillar; At least one also is provided with second opening that moves along the pillar axes direction of restriction second wiring board in the described pillar, and second opening is in the elastic part that can be strutted by elasticity outside drain pan of pillar; Pillar except that the pillar that is provided with second opening all also is provided with restriction second wiring board along second projection of moving perpendicular to the direction of pillar axes.
2. a kind of electric energy meter watchcase according to claim 1 is characterized in that, the next door of described first opening is provided with and is used to limit first wiring board along first projection of moving perpendicular to the direction of pillar axes.
3. a kind of electric energy meter watchcase according to claim 1 is characterized in that described elastic part is provided with the guiding surface that conveniently struts it.
4. a kind of electric energy meter watchcase according to claim 1 is characterized in that, described drain pan also is provided with at least one and limits second wiring board along the 3rd projection of moving perpendicular to the direction of pillar axes.
5. a kind of electric energy meter watchcase according to claim 1 is characterized in that described pillar is four, two one group, is located at respectively on two opposed inside faces of drain pan.
6. a kind of electric energy meter watchcase according to claim 1 is characterized in that, described first opening comprises two parts up and down, and the bottom is divided into the elastic sheet with toughness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206855316U CN201993399U (en) | 2010-12-17 | 2010-12-17 | Casing of energy meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206855316U CN201993399U (en) | 2010-12-17 | 2010-12-17 | Casing of energy meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201993399U true CN201993399U (en) | 2011-09-28 |
Family
ID=44669885
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206855316U Expired - Lifetime CN201993399U (en) | 2010-12-17 | 2010-12-17 | Casing of energy meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201993399U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103698566A (en) * | 2013-12-23 | 2014-04-02 | 上海金陵智能电表有限公司 | Integrated module box of intelligent electric meter |
-
2010
- 2010-12-17 CN CN2010206855316U patent/CN201993399U/en not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103698566A (en) * | 2013-12-23 | 2014-04-02 | 上海金陵智能电表有限公司 | Integrated module box of intelligent electric meter |
CN103698566B (en) * | 2013-12-23 | 2016-09-21 | 上海金陵智能电表有限公司 | A kind of integrated module box of intelligent electric meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201993399U (en) | Casing of energy meter | |
CN201993398U (en) | Electric energy meter housing | |
CN202004396U (en) | Practical distribution box | |
CN202818753U (en) | Flexible PCB board with electronic components mounted on surface thereof | |
CN205847805U (en) | Power fixing frame | |
CN204256009U (en) | Electricity meter box device | |
CN104131633A (en) | Internal parting wall of building | |
CN203706023U (en) | Tablet personal computer with multifunctional fastener system | |
CN204496388U (en) | Video card support and cabinet | |
CN203707646U (en) | Automatic transfer switch controller | |
CN202423859U (en) | Switch cabinet body | |
CN204023843U (en) | A kind of internal partition for building | |
CN206196206U (en) | Positioner of plastic face -piece and PCB board assembly | |
CN202899458U (en) | Waterproof component of portable house roof | |
CN202328427U (en) | Embedded kitchen range with fixed elastic pieces | |
CN203589469U (en) | Electric control cabinet current transformer mounting groove plate and electric control cabinet | |
CN202514207U (en) | Fixing device of transducer control panel | |
CN203377039U (en) | Insulating mat | |
CN211993319U (en) | Embedded edge cutting device for mainboard machining production | |
CN205648289U (en) | Fixing device of circuit board | |
CN203151907U (en) | Combined-type industrial control box | |
CN202262132U (en) | Clamping structure for operation panel of frequency converter | |
CN202532559U (en) | Furnace plate support structure | |
CN203278462U (en) | Novel mechanical rack | |
CN204720121U (en) | A kind of LED module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP03 | Change of name, title or address |
Address after: 315191 Yinzhou Industrial Park, Zhejiang, Ningbo, Yinzhou District, Ningbo Patentee after: NINGBO SANXING MEDICAL ELECTRIC CO., LTD. Address before: 315191 Zhejiang city of Ningbo province Jiangshan town Yinzhou District Mingguang Road No. 1166 Patentee before: Ningbo Sanxing Electric Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20110928 |
|
CX01 | Expiry of patent term |