CN201992247U - Pipeline assembly at root part of integral high-temperature pressure instrument - Google Patents

Pipeline assembly at root part of integral high-temperature pressure instrument Download PDF

Info

Publication number
CN201992247U
CN201992247U CN 201120106549 CN201120106549U CN201992247U CN 201992247 U CN201992247 U CN 201992247U CN 201120106549 CN201120106549 CN 201120106549 CN 201120106549 U CN201120106549 U CN 201120106549U CN 201992247 U CN201992247 U CN 201992247U
Authority
CN
China
Prior art keywords
valve
pipe
pressure instrument
pipeline
short tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201120106549
Other languages
Chinese (zh)
Inventor
杨兴有
李军民
方立
褚以健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shanghai Engineering Co Ltd
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shanghai Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shanghai Engineering Co Ltd filed Critical China Petroleum and Chemical Corp
Priority to CN 201120106549 priority Critical patent/CN201992247U/en
Application granted granted Critical
Publication of CN201992247U publication Critical patent/CN201992247U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model relates to a part of a chemical pipeline and particularly relates to a pipeline assembly at the root part of an integral high-temperature pressure instrument. The pipeline assembly comprises a flange, a short pipe and a valve (can also comprises a bent pipe). The pipeline assembly is characterized in that the pipeline assembly further comprises a reinforcing pipe saddle, wherein a thin pipe is arranged at the upper end of the pipe saddle, and a thick pipe is arranged at the lower end of the pipe saddle. The pipeline at the root part of the integral pressure instrument is prefabricated in a factory, that is to say, the pipeline is welded and thermally treated in the factory; and a valve inner piece is mounted after the thermal treatment. The pipeline assembly solves the problems as follows: firstly, the breakage due to poor strength and the overgreat deformation of the connected part between the pressure instrument and a main pipe is poor at high temperature is avoided; and secondly, a sealing inner piece of the valve is not influenced by thermal treatment, the leakage due to deformation of the sealing inner piece of the valve caused by the thermal treatment in a construction field is overcome and the safe operation of a high temperature overheat steam pipeline of a dehydrogenation reaction zone is ensured.

Description

Integral high-temperature pressure instrument root conduit assembly
Technical field
The utility model relates to the parts of chemical pipeline, particularly a kind of integral high-temperature pressure instrument root conduit assembly.
Background technique
Integral high-temperature pressure instrument root conduit assembly now is mainly used in the core apparatus district-dehydrogenation reaction zone high temperature steam pipeline of production of styrene device.Distinguish from structure, it can be divided into the integral high-temperature pressure instrument root conduit assembly of no bend pipe and the integral high-temperature pressure instrument root conduit assembly of bend pipe is arranged.
As shown in Figure 1, the integral high-temperature pressure instrument root conduit assembly of no bend pipe is first weldolet A4 on main pipe A5, and weld nipple A2 welds valve A3 more again, welds another short tube A2 again, again welded flange A1.Flange A1 is connected with pressure instrument.These welding are all carried out at the construction field (site), need to carry out the high temperature postweld heat treatment after the welding.
As shown in Figure 2, the integral high-temperature pressure instrument root conduit assembly that bend pipe is arranged is the welding-Saddle B5 of elder generation, weld nipple B2 again on main pipe B6, weld ell B4 welds in addition-short tube B2 more again, welds valve B3 again, a welding short tube B2 more again, welded flange B1 more at last.Flange B1 is connected with pressure instrument.These welding are also all carried out at the construction field (site), need to carry out the high temperature postweld heat treatment after the welding.
Said structure has following shortcoming in welding operation with in using.
1) operating temperature is very high, and the general operation temperature is at 870~920 ℃.So the selection of material also special (UNS N08811 INCOLOY 800H or UNS N08811 INCOLOY 800HT), because the operating temperature height, pipe deforming is big during work.
2) all weld seams need the high temperature postweld heat treatment.
Because vinyl benzene superheat steam pipeline and These characteristics that material has, adopt prior art can have two problems: a) under the effect of pressure instrument load and under the high temperature condition, the distortion of assembly short tube is very big, causes the weld seam easy-rupturing between short tube and the Saddle.B) after the field welding during high-temperature heat treatment, make the valve base sealing distortion in the assembly valve wherein, and cause valve leak.
The model utility content
The purpose of this utility model is to provide a kind of integral high-temperature pressure instrument root conduit assembly, the problem that solves is: 1) Yin Gaowen downforce instrument be responsible for the joint insufficient strength, distortion is excessive and the fracture that causes, 2) make the not influence of heat-treated of Sealing of valve, solved because of job site heat treatment causes valve seal internals distortion and cause leakage, it has guaranteed the safe operation of dehydrogenation reaction zone hyperthermia and superheating steam line.
For achieving the above object, the utility model is to realize like this.
A kind of integral high-temperature pressure instrument root conduit assembly, it comprises flange, short tube and valve, it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base of extra heavy pipe; Described reinforced base upper end connects valve one end, and this valve the other end connects an end of short tube, and the other end of this short tube is adpting flange then.
A kind of integral high-temperature pressure instrument root conduit assembly (having bend pipe) with bend pipe, it comprises flange, two short tubes, valve and bend pipe, it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base of extra heavy pipe; One end of described reinforced base upper end bridge piece, the other end of this bend pipe connects an end of first short tube, and the other end of first short tube connects an end of valve, and the other end of valve connects an end of second short tube, and the other end of second short tube is adpting flange then.
By said structure also compared with prior art, advantage of the present utility model is:
The utility model is by adopting special reinforced base with pressure instrument root pipeline, and the integrated piping assembly is in manufacturing works' welding, heat treatment, avoid the leakage of valve in fracture that pressure instrument root strength deficiency causes and the assembly, guaranteed the safe operation of dehydrogenation reaction zone hyperthermia and superheating steam line.
Description of drawings
Fig. 1 is the integral high-temperature pressure instrument root conduit assembly structural representation of existing no bend pipe.
Fig. 2 is the existing integral high-temperature pressure instrument root conduit assembly structural representation that bend pipe is arranged.
Fig. 3 is that the utility model does not have bend pipe integral high-temperature pressure instrument root conduit assembly structural representation.
Fig. 4 is that the utility model has bend pipe integral high-temperature pressure instrument root conduit assembly structural representation.
Embodiment
See also Fig. 3, the utility model discloses a kind of no bend pipe integral high-temperature pressure instrument root conduit assembly.As shown in the figure: it comprises flange 1, short tube 2 and valve 3, it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base 4 of extra heavy pipe; Described reinforced base 4 upper ends connect valve 3 one ends, and these valve 3 the other ends connect an end of short tube 2, and the other end of this short tube 2 is adpting flange 1 then.Flange 1 is connected with pressure instrument.
See also Fig. 4 again, the invention also discloses a kind of integral high-temperature pressure instrument root conduit assembly with bend pipe.As shown in the figure: it comprises flange 1, two short tubes 2, valve 3 and bend pipe 5, it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base 4 of extra heavy pipe; One end of described reinforced base 4 upper end bridge pieces 5, the other end of this bend pipe 5 connects an end of first short tube 2, the other end of first short tube 2 connects an end of valve 3, and the other end of valve 3 connects an end of second short tube 2, and the other end of second short tube 2 is adpting flange 1 then.Flange 1 is connected with pressure instrument.
Primary features of the present utility model is: 1) used the special reinforced base 4 of parts, made instrument root intensity enhancing, solved Yin Gaowen downforce instrument and person in charge joint insufficient strength, be out of shape excessive and breakage problem that cause.2) the root pipeline of whole pressure instrument is connected prefabrication, promptly in factory's welding, heat treatment, mounted valve internals after the heat treatment make the not influence of heat-treated of Sealing of valve, have solved the leakage problem that causes the distortion of valve internals to cause because of job site heat treatment.

Claims (2)

1. integral high-temperature pressure instrument root conduit assembly, it comprises flange (1), short tube (2) and valve (3), it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base (4) of extra heavy pipe; Described reinforced base (4) upper end connects valve (3) one ends, and this valve (3) the other end connects an end of short tube (2), and the other end of this short tube (2) is adpting flange (1) then.
2. integral high-temperature pressure instrument root conduit assembly with bend pipe, it comprises flange (1), two short tubes (2), valve (3) and bend pipe (5), it is characterized in that: it comprises that also a upper end is that tubule, lower end are the reinforced base (4) of extra heavy pipe; One end of described reinforced base (4) upper end bridge piece (5), the other end of this bend pipe (5) connects an end of first short tube (2), the other end of first short tube (2) connects an end of valve (3), the other end of valve (3) connects an end of second short tube (2), and the other end of second short tube (2) is adpting flange (1) then.
CN 201120106549 2011-04-13 2011-04-13 Pipeline assembly at root part of integral high-temperature pressure instrument Expired - Lifetime CN201992247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120106549 CN201992247U (en) 2011-04-13 2011-04-13 Pipeline assembly at root part of integral high-temperature pressure instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120106549 CN201992247U (en) 2011-04-13 2011-04-13 Pipeline assembly at root part of integral high-temperature pressure instrument

Publications (1)

Publication Number Publication Date
CN201992247U true CN201992247U (en) 2011-09-28

Family

ID=44668737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120106549 Expired - Lifetime CN201992247U (en) 2011-04-13 2011-04-13 Pipeline assembly at root part of integral high-temperature pressure instrument

Country Status (1)

Country Link
CN (1) CN201992247U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103162898A (en) * 2011-12-08 2013-06-19 贵阳铝镁设计研究院有限公司 Cooling device of molten salt chlorination furnace top mixed gas pressure measurement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103162898A (en) * 2011-12-08 2013-06-19 贵阳铝镁设计研究院有限公司 Cooling device of molten salt chlorination furnace top mixed gas pressure measurement

Similar Documents

Publication Publication Date Title
CN201810944U (en) Jacket heat-preservation flexible metal tube
CN201992247U (en) Pipeline assembly at root part of integral high-temperature pressure instrument
CN201795230U (en) Prefabricated steel bushing steel direct-buried elbow pipe applicable to steam pipeline
CN201327343Y (en) Thread jointed structure between heat exchange tube and tube plate of heat exchanger
CN206626560U (en) Reheater height for boiler generating set outlet header device again
JP2015017778A (en) Header part structure and heat exchanger using the same
CN202719319U (en) Pressure instrument root part component
CN202064923U (en) Fracture manifold
CN205137520U (en) Ultra supercritical boiler water cold wall pipe row
CN202846004U (en) Boiler stainless steel argon arc welding protector
CN108220627A (en) A kind of distilling apparatus produced during titanium sponge
CN208074928U (en) The header of 630 DEG C of steam parameter station boilers
CN206222683U (en) A kind of multitubular boiler with suspension smoke pipe
CN203948854U (en) A kind of expansion joint load-carrying construction
CN204159779U (en) A kind of Hydraulic expansion-jointing frock
CN204262110U (en) A kind of fitting device for making nuclear power plant's Pressure gauge loop
CN204533937U (en) 90 oraised line screw thread bend pipe
CN205957149U (en) High temperature over heater suitable for high main steam condition boiler
CN108627025A (en) A kind of inlet tube structure of condensate water pot
CN104712872A (en) 90-degree threaded elbow pipe with convex lines
CN207555967U (en) With cylindric three backhaul horizontal internal combustion boiler of flue
CN203731361U (en) Heat pipe type evaporator
CN204421689U (en) Modified form high-temperature heat-exchanging
CN207962617U (en) The superheater improved structure of carbon black waste heat boiler
CN204421688U (en) high temperature resistant heat exchanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee after: Sinopec Corp.

Patentee after: SINOPEC Shanghai Engineering Company Limited

Address before: 100728 Beijing, Chaoyangmen, North Street, No. 22, No.

Patentee before: Sinopec Corp.

Patentee before: Sinopec Shanghai Engineering Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20110928

CX01 Expiry of patent term