CN201991561U - Reinforced coal bunker for coal mining area - Google Patents

Reinforced coal bunker for coal mining area Download PDF

Info

Publication number
CN201991561U
CN201991561U CN 201120069446 CN201120069446U CN201991561U CN 201991561 U CN201991561 U CN 201991561U CN 201120069446 CN201120069446 CN 201120069446 CN 201120069446 U CN201120069446 U CN 201120069446U CN 201991561 U CN201991561 U CN 201991561U
Authority
CN
China
Prior art keywords
coal bunker
reinforced
metal net
fixed
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120069446
Other languages
Chinese (zh)
Inventor
王增全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Coking Coal Group Co Ltd
Original Assignee
Shanxi Coking Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Coking Coal Group Co Ltd filed Critical Shanxi Coking Coal Group Co Ltd
Priority to CN 201120069446 priority Critical patent/CN201991561U/en
Application granted granted Critical
Publication of CN201991561U publication Critical patent/CN201991561U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model provides a reinforced coal bunker capable of preventing cracking and deformation for a coal mining area, which is characterized in that: a metal net is fixed on the inner side of the wall of the coal bunker, and a concrete layer is poured on the inner surface of the metal net; an outer clamping ring is fixed on the inner surface of the concrete layer, and a steel shed joint support of which the two ends are supported on the metal net is arranged in the concrete layer; and uniformly distributed reinforced ladder beams are fixed on the inner surface of the metal net and are connected with trays, and the anchor rods are also connected onto the trays and sequentially penetrate through the trays, the reinforced ladder beams, the metal net and the bunker wall. In the reinforced coal bunker, the coal bunker can be effectively reinforced, and the defects that the traditional coal bunker is easily deformed and cracked can be overcome. The reinforced coal bunker hasa reasonable and compact structural design, and can be transformed in short time that the coal bunker is maintained, so that the normal production of a mine can not be affected, and accidents can be effectively eliminated.

Description

The exploiting field, colliery reinforces coal bunker
Technical field
The utility model relates to a kind of coal bunker, is specially exploiting field, a kind of colliery and reinforces coal bunker.
Background technology
As everyone knows, coal bunker is the key link in the transportation system of down-hole, is special chamber, is subjected to geological conditions and mining influence very big, especially be arranged in the High Ground Stress Areas incompetent bed and moisture, the infiltration rock stratum in, the more yielding destruction of coal bunker wall.Traditional coal bunker is rectilinear cylinder coal bunker, adopts anchor net spray combined supporting mode.Owing to be subjected to the exploiting field water burst, geological structure changes, and waits that influence bulkhead cracking obscission serious, and the local groove that forms forms the trend that accelerates the failure, and in addition in the infiltration storehouse that comes off, often causes and scurries the building and block up the building, brings major hidden danger to safety in production.Safeguard coal bunker exist influence the production time long, frequency of maintenance height and perishable difficulty such as repair at problem repeatedly.So research is explored a kind of coal bunker that is suitable for fast and is safeguarded that reinforcing technique is the common difficulty of each mine.
Summary of the invention
Technical problem to be solved in the utility model provides a kind of exploiting field, colliery of craze and transfiguration that prevents and reinforces coal bunker.
For addressing the above problem, the scheme that the utility model adopts is: exploiting field, a kind of colliery reinforces coal bunker, be fixed with wire lath in coal bunker bulkhead inboard, be cast with layer of concrete on the wire lath inner surface, the inner surface of layer of concrete is fixed with outer collar, layer of concrete inside is provided with the steel canopy combined supporting frame of two end supports on wire lath, be fixed with equally distributed reinforcing bar ladder beam on the inner surface of wire lath, the reinforcing bar ladder beam is connected with pallet, also be connected with anchor pole on the pallet, anchor pole passes pallet, reinforcing bar ladder beam, wire lath and bulkhead successively.
The utility model is a supporting overall structure, and coal bunker is effectively reinforced, and has overcome the defective of former coal bunker easy deformation and cracking.Reasonable in design, compactness can be utilized the interior transformation of short time of coal bunker maintenance, do not influence the ordinary production of mine, and the generation that can effectively stop accident.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Among the figure, 1-bulkhead, 2-wire lath, 3-layer of concrete, the outer collar of 4-, 5-steel canopy combined supporting frame, 6-reinforcing bar ladder beam, 7-pallet, 8-anchor pole.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is done and to be specified.
Exploiting field, a kind of colliery described in the utility model reinforces coal bunker, be fixed with wire lath 2 in coal bunker bulkhead 1 inboard, be cast with layer of concrete 3 on wire lath 2 inner surfaces, the inner surface of layer of concrete 3 is fixed with outer collar 4, layer of concrete 3 inside are provided with the steel canopy combined supporting frame 5 of two end supports on wire lath 2, be fixed with equally distributed reinforcing bar ladder beam 6 on the inner surface of wire lath 2, reinforcing bar ladder beam 6 is connected with pallet 7, also be connected with anchor pole 8 on the pallet 7, anchor pole 8 passes pallet 7, reinforcing bar ladder beam 6, wire lath 2 and bulkhead 1 successively.
Can be in the following ways during concrete enforcement, anchor pole 8 adopts Φ 20mm, strong twisted steel anchor rods such as the vertical muscle of the left-handed nothing of L=2000mm, array pitch 600 * 600mm, 20 on every circle, anchor pole 8 is vertical with bulkhead 1, and anchor pole 8 exposes 10-30mm.Pallet 7 specifications are: length * wide * dish-shaped supporting plate in thick=100 * 100 * 10 (mm).Wire lath 2 adopts the electric welding of Φ 15mm reinforcing bar to form, specification: length * wide=2000 * 1000mm, wire lath 2 laterally presses stubble to lay along the borehole wall, compressed steel muscle ladder beam 6: adopt Φ 15mm round steel, wide is 80mm, long 4000mm, and steel canopy combined supporting frame 5 is selected Φ 15mm steel pipe for use, outer collar 4 is a channel-section steel, and radian is consistent with the storehouse tube.The spray concrete: the material proportioning is a cement: sand: stone=1:2:2, and water/binder ratio 0.4-0.45, accelerating admixture volume are 5% of cement weight, and cement adopts portland cement, and label is not less than 425#, and sand, stone must clean.Spray the thick 100mm that is no more than, concrete strength is not less than C20.
Concrete work progress is: beats 8 of anchor poles, annotates resin anchor, and close plating net 2, compressed steel muscle ladder beam 6, top tray 7 nuts are installed steel canopy combined supporting frame 5, and outer collar 4 is fixed with nut on the card, and whole whitewashing forms layer of concrete 3.

Claims (1)

1. exploiting field, a colliery reinforces coal bunker, it is characterized in that: be fixed with wire lath (2) in coal bunker bulkhead (1) inboard, be cast with layer of concrete (3) on wire lath (2) inner surface, the inner surface of layer of concrete (3) is fixed with outer collar (4), layer of concrete (3) inside is provided with the steel canopy combined supporting frame (5) of two end supports on wire lath (2), be fixed with equally distributed reinforcing bar ladder beam (6) on the inner surface of wire lath (2), reinforcing bar ladder beam (6) is connected with pallet (7), also be connected with anchor pole (8) on the pallet (7), anchor pole (8) passes pallet (7) successively, reinforcing bar ladder beam (6), wire lath (2) and bulkhead (1).
CN 201120069446 2011-03-17 2011-03-17 Reinforced coal bunker for coal mining area Expired - Fee Related CN201991561U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120069446 CN201991561U (en) 2011-03-17 2011-03-17 Reinforced coal bunker for coal mining area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120069446 CN201991561U (en) 2011-03-17 2011-03-17 Reinforced coal bunker for coal mining area

Publications (1)

Publication Number Publication Date
CN201991561U true CN201991561U (en) 2011-09-28

Family

ID=44668051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120069446 Expired - Fee Related CN201991561U (en) 2011-03-17 2011-03-17 Reinforced coal bunker for coal mining area

Country Status (1)

Country Link
CN (1) CN201991561U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660979A (en) * 2012-05-28 2012-09-12 中国水利水电科学研究院 Large-caliber shallow well
CN103233751A (en) * 2013-05-07 2013-08-07 中国矿业大学 Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103422869A (en) * 2013-08-22 2013-12-04 山东科技大学 Jet grouting and anchoring comprehensive construction method of soft rock tunnel
CN103510983A (en) * 2013-10-08 2014-01-15 中国矿业大学 Wall-mounting-type vertical coal bunker without coal feeder chamber
CN112144905A (en) * 2020-09-22 2020-12-29 九州职业技术学院 Waste coal storage bin reinforcing method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660979A (en) * 2012-05-28 2012-09-12 中国水利水电科学研究院 Large-caliber shallow well
CN102660979B (en) * 2012-05-28 2014-04-30 中国水利水电科学研究院 Large-caliber shallow well
CN103233751A (en) * 2013-05-07 2013-08-07 中国矿业大学 Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103233751B (en) * 2013-05-07 2015-06-17 中国矿业大学 Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103422869A (en) * 2013-08-22 2013-12-04 山东科技大学 Jet grouting and anchoring comprehensive construction method of soft rock tunnel
CN103510983A (en) * 2013-10-08 2014-01-15 中国矿业大学 Wall-mounting-type vertical coal bunker without coal feeder chamber
CN103510983B (en) * 2013-10-08 2015-05-20 中国矿业大学 Wall-mounting-type vertical coal bunker without coal feeder chamber
CN112144905A (en) * 2020-09-22 2020-12-29 九州职业技术学院 Waste coal storage bin reinforcing method

Similar Documents

Publication Publication Date Title
CN201991561U (en) Reinforced coal bunker for coal mining area
CN103821677B (en) Prefabricated PC RPC wind power tower
CN103867019B (en) Assembling external prestressing RPC wind power tower
CN103075158B (en) Steel plate and steel reinforced concrete well wall
CN203755778U (en) Assembly external pre-stress reactive powder concrete wind power tower
CN102562093A (en) Full-length anchoring supporting method with intensive resin anchor rod and anchor-shotcrete net
CN102733836A (en) Roadway support method for fully mechanized caving mining of weak extra-thick coal seam
CN107217551A (en) A kind of assembly concrete-filled steel tube double-block type sleeper
CN202768012U (en) Tunnel primary lining prefabricated concrete block assembly
CN202914107U (en) Roadway support truss
CN202164621U (en) Tower crane foundation capable of being arranged and assembled
CN204457800U (en) Large Cross-section Tunnel in Subway Engineering two serves as a contrast the simple and easy chassis mould of arch wall separate type and builds construction equipment
CN203145974U (en) Crosswise-arranged U-shaped through anchor coal and rock pillar supporting device
CN205577187U (en) Prefabricated steel pipe concrete constructional column rammed earth wall
CN208816145U (en) A kind of locked instrument of Tunnel steelframe
CN203113868U (en) Gantry tower for construction cableway
CN204212264U (en) Large span steel reinforced concrete braced structures
CN208518676U (en) A kind of shield sky pushes away the section of jurisdiction support system of spelling section of jurisdiction section
CN202000266U (en) Supporting structure of bridge coping template
CN208310200U (en) A kind of expansion joint two side columns template reinforcing device
CN105804293A (en) Prefabricated concrete-filled steel tube construction column rammed earth wall
CN112814699A (en) Coal bunker support and construction process thereof
CN206053364U (en) Building construction hoist support meanss
CN205296579U (en) Combination reinforcing bar girder construction
CN204140109U (en) Shotcreting anchorage-netting Support Structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110928

Termination date: 20160317

CF01 Termination of patent right due to non-payment of annual fee