CN201984480U - 输电线路杆塔设计平台 - Google Patents
输电线路杆塔设计平台 Download PDFInfo
- Publication number
- CN201984480U CN201984480U CN2010206623592U CN201020662359U CN201984480U CN 201984480 U CN201984480 U CN 201984480U CN 2010206623592 U CN2010206623592 U CN 2010206623592U CN 201020662359 U CN201020662359 U CN 201020662359U CN 201984480 U CN201984480 U CN 201984480U
- Authority
- CN
- China
- Prior art keywords
- shaft tower
- tower design
- design
- pole
- tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206623592U CN201984480U (zh) | 2010-12-15 | 2010-12-15 | 输电线路杆塔设计平台 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206623592U CN201984480U (zh) | 2010-12-15 | 2010-12-15 | 输电线路杆塔设计平台 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201984480U true CN201984480U (zh) | 2011-09-21 |
Family
ID=44611936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206623592U Expired - Lifetime CN201984480U (zh) | 2010-12-15 | 2010-12-15 | 输电线路杆塔设计平台 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201984480U (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103438873A (zh) * | 2013-08-28 | 2013-12-11 | 国网河南省电力公司南阳供电公司 | 一种电力线路勘察测量技术 |
CN105069210A (zh) * | 2015-07-30 | 2015-11-18 | 宜昌电力勘测设计院有限公司 | 输电线路掏挖基础系列化典型设计图及设计方法 |
CN105138777A (zh) * | 2015-08-27 | 2015-12-09 | 北京恒华伟业科技股份有限公司 | 一种杆塔选型方法和装置 |
CN107194522A (zh) * | 2017-06-28 | 2017-09-22 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种1100kV特高压直流输电线路杆塔系列策划方法 |
CN109165417A (zh) * | 2018-08-01 | 2019-01-08 | 北京道亨时代科技有限公司 | 一种铁塔司令图自动布置方法及系统 |
-
2010
- 2010-12-15 CN CN2010206623592U patent/CN201984480U/zh not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103438873A (zh) * | 2013-08-28 | 2013-12-11 | 国网河南省电力公司南阳供电公司 | 一种电力线路勘察测量技术 |
CN105069210A (zh) * | 2015-07-30 | 2015-11-18 | 宜昌电力勘测设计院有限公司 | 输电线路掏挖基础系列化典型设计图及设计方法 |
CN105069210B (zh) * | 2015-07-30 | 2017-11-14 | 宜昌电力勘测设计院有限公司 | 输电线路掏挖基础系列化典型设计图及设计方法 |
CN105138777A (zh) * | 2015-08-27 | 2015-12-09 | 北京恒华伟业科技股份有限公司 | 一种杆塔选型方法和装置 |
CN105138777B (zh) * | 2015-08-27 | 2019-03-29 | 北京恒华伟业科技股份有限公司 | 一种杆塔选型方法和装置 |
CN107194522A (zh) * | 2017-06-28 | 2017-09-22 | 中国电力工程顾问集团西南电力设计院有限公司 | 一种1100kV特高压直流输电线路杆塔系列策划方法 |
CN109165417A (zh) * | 2018-08-01 | 2019-01-08 | 北京道亨时代科技有限公司 | 一种铁塔司令图自动布置方法及系统 |
CN109165417B (zh) * | 2018-08-01 | 2023-05-30 | 北京道亨软件股份有限公司 | 一种铁塔司令图自动布置方法及系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201984480U (zh) | 输电线路杆塔设计平台 | |
Liang et al. | Material requirements for low-carbon energy technologies: a quantitative review | |
CN103426122B (zh) | 一种微电网综合评价方法 | |
Zhao et al. | Joint environmental and economic power dispatch considering wind power integration: Empirical analysis from Liaoning Province of China | |
CN110119888A (zh) | 一种基于分布式电源接入的有源网格化规划方法 | |
CN103530817A (zh) | 一种分布式光伏并网适应性评估方法 | |
CN106651140B (zh) | 台风区输电线路风险的模块差异评估方法和装置 | |
Ojo et al. | Designing a green power delivery system for base transceiver stations in Southwestern Nigeria | |
CN103699688A (zh) | 一种支撑终端用户供电可靠性管理的终端模型 | |
Jiang et al. | Analysis of transient energy affection for wind farm under lightning | |
CN201417948Y (zh) | 基于dscada系统的配电网状态与运行方式优化系统 | |
Zhang et al. | What drives the GHG emission changes of the electric power industry in China? An empirical analysis using the Logarithmic Mean Divisia Index method | |
CN204577112U (zh) | 一种采用177个燃料组件的压水堆电站反应堆堆芯 | |
CN204632389U (zh) | 高海拔地区耐寒信号电缆 | |
CN203412351U (zh) | F形窄基三角钢管塔 | |
CN103345659B (zh) | 配电网新增用户优化接入信息处理方法 | |
CN202159592U (zh) | 多用途倒闸操作棒 | |
CN102254071A (zh) | 交流特高压单回紧凑型10分裂导线相间距离确定方法 | |
CN202443779U (zh) | 耐扭转屏蔽电缆 | |
CN205881624U (zh) | 一种抗震式电力变压器底座 | |
CN103821401B (zh) | 一种跨越高速铁路输电杆塔的设计方法 | |
CN203588266U (zh) | 风电场数据存储装置 | |
CN202434306U (zh) | 大电流连续式绕组装置 | |
CN108448502A (zh) | 一种固定电缆用组合式抱箍 | |
CN201788748U (zh) | 抗冰雪用z形型线同心绞架空导线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Wang Gang Inventor after: Zhu Zhongyao Inventor after: Dai Hongbai Inventor before: Fu Weibo Inventor before: Dong Wei Inventor before: Zhao Caidong Inventor before: Liu Aiming Inventor before: Zhu Zhongyao Inventor before: Dai Hongbai Inventor before: Lin Yuanhao Inventor before: Liu Yanchao |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20171226 Address after: 100120 Beijing Xicheng District andelu No. 65-2 Patentee after: BEIJING NORTH-STAR DIGITAL REMOTE SENSING TECHNOLOGY CO., LTD. Address before: 100120 Beijing Xicheng District andelu No. 65-2 Patentee before: Beijing North-Star Electric Power Engineering Co., Ltd. |
|
TR01 | Transfer of patent right | ||
CX01 | Expiry of patent term |
Granted publication date: 20110921 |
|
CX01 | Expiry of patent term |