CN201972599U CN2010206657391U CN201020665739U CN201972599U CN 201972599 U CN201972599 U CN 201972599U CN 2010206657391 U CN2010206657391 U CN 2010206657391U CN 201020665739 U CN201020665739 U CN 201020665739U CN 201972599 U CN201972599 U CN 201972599U
Authority
CN
China
Prior art keywords
tool body
rib
tool
vertical drilling
turbine generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206657391U
Other languages
Chinese (zh)
Inventor
余雷
白冬青
何其东
林刚
王佳露
任海阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Great Wall Drilling Co
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CN2010206657391U priority Critical patent/CN201972599U/en
Application granted granted Critical
Publication of CN201972599U publication Critical patent/CN201972599U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to a mating device for drilling petroleum and natural gas, in particular to a vertical drilling tool. For the vertical drilling tool, a turbine generator (2) is arranged in a locating cylinder (3) that is fixed on the inner wall of a tool body (5), the turbine generator (2) is connected with a voltage rectifier (4), centering devices (7) are respectively arranged between the voltage rectifier (4) and a gravity accelerometer (6) as well as between the gravity accelerometer (6) and a central controller (8), an oil tank (10), a hydraulic pump (11), a motor (12) and a plunger pump (13) are sealed in the tool body (5) by a pressure cover (9), a wing rib stabilizing block (15) is fixed on the tool body (5), and a wing rib (16) is connected with the plunger pump (13). With the vertical drilling tool, the cutting amount of a drill bit at the low side of a well can be increased when the well has deviation, so as to keep the drill bit to drill on the vertical direction.

Description

A kind of vertical drilling tool
Technical field:
The utility model relates to the corollary apparatus of a kind of oil, gas drilling, particularly a kind of vertical drilling tool.
Background technology:
At present, in drilling process, realize that the deviation prevention and fast on high steep stratum is a ubiquitous technical difficult problem.Domestic existing deviation prevention and fast technology is to utilize tower drilling tool, meet the eye on every side hold angle drilling tool, pendulum assembly, decentralized drill collar or off-axis and carry out deviation prevention and fast, yet these technology are the deviation prevention and fast that cost realizes high steep stratum to sacrifice the pressure of the drill, to reduce rate of penetration mostly.The hole deviation problem on stratum such as solution high inclination-angle that therefore can not economical and efficient, steep structure, and cause problem such as lock of tool drilling easily.
The utility model content:
The technical problems to be solved in the utility model provides a kind of vertical drilling tool, this vertical drilling tool has been realized can be when skew takes place in well, automatically the flash in well produces a thrust, under the reaction force of the borehole wall, increase the cutting output of drill bit on the low limit of well, drill bit is remained to vertical direction creep into, thereby reach the purpose of drop angle.Having overcome prior art is the deficiency that cost realizes the deviation prevention and fast on high steep stratum to sacrifice the pressure of the drill, to reduce rate of penetration mostly.
Technical solution adopted in the utility model is: a kind of vertical drilling tool, and stablize piece, rib and lower contact and form by top connection, turbine generator, positioning tube, voltage rectifier, tool body, acceleration of gravity meter, centralizer, central controller, gland, fuel tank, hydraulic pump, motor, plunger displacement pump, interior six rib nuts, rib; Turbine generator is installed in the positioning tube, positioning tube is fixed on the tool body inwall, turbine generator links to each other with voltage rectifier, between voltage rectifier and the acceleration of gravity meter, between acceleration of gravity meter and the central controller centralizer is installed all, gland seal fuel tank, hydraulic pump, motor, plunger displacement pump are in tool body inside, rib is stablized piece and is fixed on the tool body, and rib is connected with plunger displacement pump.
The groove milling of described tool body upper surface institute is 3, is distributed on the same circumference of tool body, and corresponding plunger displacement pump is 3.
It is to be fixed on the tool body with interior six rib nuts that described rib is stablized piece.
The beneficial effects of the utility model are: the utility model is owing to adopted turbine generator to be installed in the positioning tube, positioning tube is fixed on the tool body inwall, turbine generator links to each other with voltage rectifier, between voltage rectifier and acceleration of gravity meter, centralizer all is installed between acceleration of gravity meter and the central controller, the gland seal fuel tank, hydraulic pump, motor, plunger displacement pump is in tool body inside, rib is stablized piece and is fixed on the tool body, the structure that rib is connected with plunger displacement pump, thereby have can be when skew takes place in well, automatically the flash in well produces a thrust, under the reaction force of the borehole wall, increase the cutting output of drill bit, make drill bit remain the function of creeping into to vertical direction on the low limit of well.In addition, the utility model is dynamic bias backup bit system, and is simple and practical, esy to use, safe and reliable, press consumption to hang down and be applicable to multiple offshore boring island, do not have relative stationary part with well, help the cleaning of well, make well Paint Gloss, frictional force and resistance are little, help the pressure of the drill and directly be added on the drill bit, improve bit speed, reduce drilling cost.
Description of drawings:
The utility model is described in more detail below in conjunction with the drawings and specific embodiments.
Accompanying drawing is a structural representation of the present utility model.
The specific embodiment:
As shown in drawings, a kind of vertical drilling tool is stablized piece 15, rib 16 and lower contact 17 and is formed by top connection 1, turbine generator 2, positioning tube 3, voltage rectifier 4, tool body 5, acceleration of gravity meter 6, centralizer 7, central controller 8, gland 9, fuel tank 10, hydraulic pump 11, motor 12, plunger displacement pump 13, interior six rib nuts 14, rib.Top connection 1 directly is connected with drill string, transmits the drill string moment of torsion and drives the utility model and drill bit rotary drilling.Turbine generator 2 is installed in the positioning tube 3, positioning tube 3 is fixed on tool body 5 inwalls, turbine generator 2 links to each other with voltage rectifier 4, and the current commutates one-tenth of turbine generator 2 is stablized direct current, electric current supply acceleration of gravity meter 6, central controller 8 and motor 12.Between voltage rectifier 4 and the acceleration of gravity meter 6, between acceleration of gravity meter 6 and the central controller 8 centralizer 7 is installed all, thereby reduce the influence of vibrations to Instrument measuring precision.Acceleration of gravity meter 6 is measured the variation of hole deviation in the drilling process in good time, measured value directly is sent to central controller 8, when measuring hole deviation above setting value, 12 work of central controller 8 control motors, utilize hydraulic pump 11 to extract hydraulic oil from fuel tank 10 and suppress to plunger displacement pump 13, drive rib 16 and stretch out, its reaction force acts is on drill bit, increase the cutting output of drill bit, guarantee the vertical of well track on the low limit of well.Gland 9 leakproof fuel cells 10, hydraulic pump 11, motor 12, plunger displacement pump 13 prevent that in tool body 5 inside the mud in the well from entering.Rib is stablized the interior six rib nuts 14 of piece 15 usefulness and is fixed on the tool body 5, avoids rib 16 to break away under down hole problem, brings difficulty to construction.Rib 16 is connected with plunger displacement pump 13.The groove milling of tool body 5 upper surfaces institute is 3, is distributed on the same circumference of tool body 5, and corresponding plunger displacement pump 13 is 3.
When skew took place well track, the utility model produced a thrust at the flash of well automatically, and under the reaction force of the borehole wall, the increase drill bit remains to vertical direction drill bit and creeps in the cutting output on the low limit of well, thereby reached the purpose of drop angle.

Claims (3)

1. a vertical drilling tool is stablized piece (15), rib (16) and lower contact (17) and is formed by top connection (1), turbine generator (2), positioning tube (3), voltage rectifier (4), tool body (5), acceleration of gravity meter (6), centralizer (7), central controller (8), gland (9), fuel tank (10), hydraulic pump (11), motor (12), plunger displacement pump (13), interior six rib nuts (14), rib; It is characterized in that: turbine generator (2) is installed in the positioning tube (3), positioning tube (3) is fixed on tool body (5) inwall, turbine generator (2) links to each other with voltage rectifier (4), between voltage rectifier (4) and acceleration of gravity meter (6), between acceleration of gravity meter (6) and the central controller (8) centralizer (7) is installed all, gland (9) leakproof fuel cell (10), hydraulic pump (11), motor (12), plunger displacement pump (13) is in tool body (5) inside, rib is stablized piece (15) and is fixed on the tool body (5), and rib (16) is connected with plunger displacement pump (13).
2. according to the described vertical drilling tool of claim 1, it is characterized in that: the groove milling of described tool body (5) upper surface institute is 3, is distributed on the same circumference of tool body (5), and corresponding plunger displacement pump (13) is 3.
3. according to the described vertical drilling tool of claim 1, it is characterized in that: it is to be fixed on the tool body (5) with interior six rib nuts (14) that described rib is stablized piece (15).
CN2010206657391U 2010-12-17 2010-12-17 Vertical drilling tool Expired - Fee Related CN201972599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206657391U CN201972599U (en) 2010-12-17 2010-12-17 Vertical drilling tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206657391U CN201972599U (en) 2010-12-17 2010-12-17 Vertical drilling tool

Publications (1)

Publication Number Publication Date
CN201972599U true CN201972599U (en) 2011-09-14

Family

ID=44577706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206657391U Expired - Fee Related CN201972599U (en) 2010-12-17 2010-12-17 Vertical drilling tool

Country Status (1)

Country Link
CN (1) CN201972599U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400645A (en) * 2011-11-25 2012-04-04 中国石油集团长城钻探工程有限公司 Mechanical part of continuous oil pipe guiding tool
CN103321592A (en) * 2013-06-13 2013-09-25 中国石油集团西部钻探工程有限公司 Special type guard plate
CN109723383A (en) * 2017-10-30 2019-05-07 裴绪建 A kind of hydraulic automatic vertical drilling tool

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102400645A (en) * 2011-11-25 2012-04-04 中国石油集团长城钻探工程有限公司 Mechanical part of continuous oil pipe guiding tool
CN103321592A (en) * 2013-06-13 2013-09-25 中国石油集团西部钻探工程有限公司 Special type guard plate
CN103321592B (en) * 2013-06-13 2015-09-09 中国石油集团西部钻探工程有限公司 Special type guard plate
CN109723383A (en) * 2017-10-30 2019-05-07 裴绪建 A kind of hydraulic automatic vertical drilling tool

Similar Documents

Publication Publication Date Title
CN202926259U (en) Annular pulsed water jet generator
CN102322219B (en) Submarine jet drilling vehicle
CN104165027A (en) Three-dimensional turbine vibrator for petroleum drilling
CN201972599U (en) Vertical drilling tool
CN202220554U (en) Inclined disk plunger type rotary guide well-drilling tool
CN203257328U (en) Drilling machine for exploiting shale gas
CN204113106U (en) Washing pipe assembly and top drive drilling system are driven in mechanical seal top
CN203161424U (en) Slurry turbine power generation mechanism for well drilling
CN102635486A (en) Turbine driven downhole slurry generator
CN104453711A (en) Automatic vertical well drilling tool
CN203701958U (en) Small hydraulic drilling machine with pressure
CN201050301Y (en) Vertically drilling tool
CN202392109U (en) Two-stage seal structure for dynamic seal of underground dynamic drilling tool
CN214200744U (en) A sampling device for hydraulic and hydroelectric engineering ground detects
CN102080570A (en) Twin-turbine underground high-power generator
CN201068734Y (en) Vertical drilling tool
CN201924828U (en) Bidirectional power swivel device for multifunctional testing machine
CN201891379U (en) Top driving device of drilling platform
CN205638222U (en) Rig for oil development
CN201535161U (en) Signal generator of magnetic source
CN203891800U (en) Normally-closed hydraulic chuck with quick-change slip
CN103437701B (en) Local electric rotary drilling device
CN202545099U (en) Turbine driving type downhole mud generator
CN203374200U (en) Air distribution device for power-head drilling rig and rotary-table drilling rig
CN203035182U (en) Underground pulsating pressure simulator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110914