A kind of perpendicular material syndeton of unit glass curtain wall
Technical field
The utility model relates to architectural decoration, more particularly, relates to a kind of perpendicular material syndeton of unit glass curtain wall.
Background technology
At architectural decoration, unit glass curtain wall has penetrating effect because of it and installation rate is fast, precision is high, and indoor environment and outdoor view are combined together, so be subjected to building designers' favor deeply always, is adopted in a large number on building external decoration.Traditional unit glass curtain wall bearing link position majority is in invisible positions such as beam sides, is connected and fixed on the agent structure by bolt.Because present architectural image novelty, of a great variety, more and more building locals floor superelevation, when this type of building external decoration adopts the unit type curtain wall type, tend to erect the material bearing and be arranged on visible location because of modular perpendicular material cross section and force request, consider that bearing exposes meeting and impact the interior architecture effect, needs will expose bearing and connecting bolt stashes.
The utility model content
The technical problems to be solved in the utility model is, exposes the defective that influences the interior architecture effect at the bearing of prior art, and a kind of perpendicular material syndeton that can hide the unit glass curtain wall of bearing and connecting bolt is provided.
The technical scheme that its technical problem that solves the utility model adopts is: the perpendicular material syndeton of constructing a kind of unit glass curtain wall, comprise perpendicular material, bearing, the horizontal material of fixedlying connected with described perpendicular material, be fixed on the unit glass plate of described perpendicular material and horizontal material front end, comprise that also two are fixed on suspension member on the described bearing with described perpendicular material, and the buckle of accommodating described bearing, described perpendicular material package is drawn together perpendicular material of the moon that links together and the perpendicular material of sun, the perpendicular material of described buckle and described the moon, the perpendicular material of sun buckle connects, and described buckle is housed in described bearing in the cavity of described buckle; The inside wall of the perpendicular material of described the moon is provided with first connecting portion, and the inside wall of the perpendicular material of described sun is provided with second connecting portion, and the front end of two described suspension members is fixedlyed connected with described first connecting portion, second connecting portion respectively.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, described buckle comprises cloudy buckle, positive buckle, and described cloudy buckle, positive buckle buckle connect; Form the cavity of accommodating described bearing between described cloudy buckle, the positive buckle.In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the rear end of described cloudy buckle is connected with the rear end buckle of described positive buckle; The front end of described cloudy buckle is connected with the rear end buckle of the perpendicular material of described the moon, and the front end of described positive buckle is connected with the rear end buckle of the perpendicular material of described sun.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the rear inside wall of described cloudy buckle is provided with the buckle connecting portion, described buckle connecting portion is have two steps stepped, and the first step of described buckle connecting portion and the inside wall of described cloudy buckle form the buckle draw-in groove; Have and the suitable trip of described buckle draw-in groove on the described positive buckle rear inside face, described first step is provided with projection.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the second step of described buckle connecting portion is fixedlyed connected with described bearing.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the rear end of the perpendicular material of described the moon is provided with first draw-in groove, and the front end inside wall of described cloudy buckle is provided with and the first suitable trip of described first draw-in groove; The sidewall of described first draw-in groove is provided with first boss.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the rear end of the perpendicular material of described sun is provided with second draw-in groove, the front end inside wall of described positive buckle is provided with and the second suitable trip of described second draw-in groove, and the sidewall of described second draw-in groove is provided with second boss.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, the front end of described bearing is welded with connector, and the rear end of two described suspension members and described connector tie and connect.
In the perpendicular material syndeton of unit glass curtain wall described in the utility model, be provided with cushion block between described buckle and the described bearing.
Implement the perpendicular material syndeton of unit glass curtain wall of the present utility model, have following beneficial effect: suspension member and the connecting portion design of erecting material are erected in material and the perpendicular inner chamber of expecting of sun at the moon, can hide suspension member and the connecting bolt that erects material; Utilize buckle, the connecting bolt between bearing and bearing and suspension member is housed in the cavity of buckle, can hide bearing and connecting bolt, avoid bearing and connecting bolt to influence the interior architecture effect; Total utilizes bolt and buckle to connect, and is convenient to installation and removal.
Description of drawings
The utility model is described in further detail below in conjunction with drawings and Examples, in the accompanying drawing:
Fig. 1 is the horizontal cross that is connected with the suspension member place in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 2 is the horizontal cross at no suspension member place in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 3 is the enlarged drawing of A portion among Fig. 2 in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 4 is the enlarged drawing of B portion among Fig. 2 in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 5 is the enlarged drawing of C portion among Fig. 2 in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 6 is the sectional view of vertical direction in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 7 is the structural representation after assembling in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall;
Fig. 8 is the structural representation that conceals part buckle and perpendicular material after assembling in the perpendicular material syndeton preferred embodiment of the utility model unit glass curtain wall.
The specific embodiment
Understand for technical characterictic of the present utility model, purpose and effect being had more clearly, now contrast accompanying drawing and describe the specific embodiment of the present utility model in detail.
As shown in Figures 1 and 2, the preferred embodiment of the perpendicular material syndeton of a kind of unit glass curtain wall of the utility model, comprise perpendicular material, bearing 2, the horizontal material 3 of fixedlying connected, be fixed on the unit glass plate 4 that erects material and horizontal material 3 front ends with perpendicular material, also comprise two respectively with perpendicular material 11 of the moon and the perpendicular material of sun 12 buckles 5 that are fixed on the suspension member 6 on the bearing 2 and are used to accommodate bearing 2, perpendicular material package is drawn together perpendicular material 11 of the moon that links together and the perpendicular material 12 of sun, and buckle 5 is housed in bearing 2 in the cavity of buckle 5; Buckle 5 comprises cloudy buckle 51, positive buckle 52, and cloudy buckle 51, positive buckle 52 buckles connect; Form the cavity of accommodating bearing 2 between cloudy buckle 51, the positive buckle 52.
As Fig. 2 and shown in Figure 6, the inwall of cloudy perpendicular material 11 is provided with first connecting portion 111, the inwall of the perpendicular material 12 of sun is provided with second connecting portion 121, the front end of two suspension members 6 is fixedlyed connected with first connecting portion 111, second connecting portion 121 respectively, particularly, the inwall of first connecting portion 111 for having in cloudy perpendicular material 11 inner chambers, form a cavity between first connecting portion 111 and cloudy perpendicular material 11 outer walls, suspension member 6 enters in the described cavity from the rear end of the perpendicular material 11 of the moon, and fixedlys connected with first connecting portion 111 by bolt.The inwall of second connecting portion 121 for having in the perpendicular material of sun 12 inner chambers forms a cavity between second connecting portion 121 and the perpendicular material of sun 12 outer walls, and suspension member 6 enters in the described cavity from the rear end of the perpendicular material 12 of sun, and fixedlys connected with second connecting portion 121 by bolt.Be illustrated in figure 8 as the structural representation that conceals part buckle and perpendicular material after assembling.
The rear end that the front end of bearing 2 is welded with 21, two suspension members 6 of two connectors is connected with connector 21 bolts.One of them suspension member and a connector are locked by bolt, and the another one suspension member is connected with another reserves the move left and right space, make the plate of unit type curtain wall can hold the horizontal movement that produces under the side direction wind action.
Buckle 5 is connected with cloudy perpendicular material 11, the perpendicular material of sun 2 buckles; The rear end of cloudy buckle 51 is connected with the rear end buckle of positive buckle 52; The front end of cloudy buckle 51 is connected with the rear end buckle of cloudy perpendicular material 11, and the front end of positive buckle 52 is connected with the rear end buckle of the perpendicular material 12 of sun.Particularly, as shown in Figure 3, the rear inside wall of cloudy buckle 51 is provided with buckle connecting portion 511, and buckle connecting portion 511 is for having the stepped of two steps, and the first step 513 of buckle connecting portion 511 forms buckle draw-in groove 53 with the inside wall of cloudy buckle 51; Have the trip 521 suitable with buckle draw-in groove 53 on the sun buckle 52 rear inside faces, first step 513 is provided with projection 515, and projection 515 is spacing in buckle draw-in groove 53 with trip 521, is difficult for deviating from.The second step 514 of buckle connecting portion 511 is connected with bearing 2 bolts.
As shown in Figure 4, the rear end of cloudy perpendicular material 11 is provided with first draw-in groove 112, and the front end inside wall of cloudy buckle 51 is provided with and the first suitable trip 516 of first draw-in groove 112; The sidewall of first draw-in groove 112 is provided with first boss, 116, the first boss 116 can be spacing in first draw-in groove 112 with first trip 516, is difficult for deviating from.
As shown in Figure 5, the rear end of the perpendicular material 12 of sun is provided with second draw-in groove 122, the front end inside wall of sun buckle 52 is provided with and the second suitable trip 526 of second draw-in groove 122, the sidewall of second draw-in groove 122 is provided with second boss 126, second boss 126 can be spacing in first draw-in groove 122 with second trip 526, is difficult for deviating from.
Be provided with cushion block 7 between buckle 5 and the bearing 2, can be used for supporting cloudy buckle 51, positive buckle 52, make cloudy buckle 51, positive buckle 52 not yielding.
In the preferred embodiment of the perpendicular material syndeton of the utility model unit glass curtain wall, suspension member and the connecting portion design of erecting material are erected in material and the perpendicular inner chamber of expecting of sun at the moon, can hide suspension member and the connecting bolt that erects material; Utilize buckle, the connecting bolt between bearing and bearing and suspension member is housed in the cavity of buckle, can hide bearing and connecting bolt, as shown in Figure 7, avoided bearing and connecting bolt to influence the interior architecture effect after assembling; Total utilizes bolt and buckle to connect, and is convenient to installation and removal.
In the preferred embodiment of the perpendicular material syndeton of the utility model unit glass curtain wall, preferably, the second step of buckle connecting portion is connected with carrier setting bolt, bolt is connected between suspension member and the connector, bolt is connected between suspension member and the perpendicular material, can be so that installation and removal, it will be appreciated that, its connected mode is not limited thereto, and can be welding or riveted joint or other fixedly connected modes.
In conjunction with the accompanying drawings embodiment of the present utility model is described above; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; rather than it is restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away under the scope situation that the utility model aim and claim protect, also can make a lot of forms, these all belong within the protection of the present utility model.