CN201965788U - Simulation system for oil-gas storing and transporting depot - Google Patents
Simulation system for oil-gas storing and transporting depot Download PDFInfo
- Publication number
- CN201965788U CN201965788U CN2011200959937U CN201120095993U CN201965788U CN 201965788 U CN201965788 U CN 201965788U CN 2011200959937 U CN2011200959937 U CN 2011200959937U CN 201120095993 U CN201120095993 U CN 201120095993U CN 201965788 U CN201965788 U CN 201965788U
- Authority
- CN
- China
- Prior art keywords
- oil
- pump
- sand table
- valve
- flow process
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Loading And Unloading Of Fuel Tanks Or Ships (AREA)
Abstract
The utility model discloses a simulation system for an oil-gas storing and transporting depot, which comprises a sand table, a touch screen and a flow panel, wherein the sand table is provided with an oil-gas storing and transporting device and a pipeline connected with the storing and transporting device; an access pipeline of the storing and transporting device is internally provided with a control valve and an LED (Light Emitting Diode) lamp band; the storing and transporting device is distributed in a train trestle (1), a tank field (2), a pump house zone (3), a fire pump zone (4), a marine valve house (5), a dock (6), a gasoline supplying zone (7), a filling zone (8) and an office (9) according to functions; and a PLC (Programmable Logic Controller) is arranged below the sand table and connected with the control valve on the sand table, the LED lamp band and a computer inside the touch screen. In the simulation system, the technical flow of the oil depot is simulated in the form of a sand table and cartoons, so that whether the operation of students on the sand table is suitable can be dynamically and alternatively demonstrated on the flow panel in real time, therefore, the students feel like on the scene, and further, the training effect is improved, and the training cost is reduced.
Description
Technical field
The utility model relates to a kind of oil gas accumulating oil depot simulation system.
Background technology
The oil gas accumulating is connecting the inner product of petroleum industry, fortune, each link of pin, its general character to practitioner's knowledge and skills requires more and more, adaptive requirement is also more and more strong, slight error of operating personnel or careless, might cause serious quality accident or security incident, for the country and people brings great loss, therefore oil gas accumulating practitioner's knowledge training on duty and professional skill training just seem very important, but because nearly all oil gas accumulating is on-the-spot and facility all is distributed in the field, the training scene of being put into can not be carried out, if only rely on conventional classroom instruction or laboratory operation, owing to lack lifelike image, lively supplementary means and mode directly perceived, be absorbed in simple uninteresting difficult situation unavoidably, training is difficult to get a desired effect.
Present oil gas accumulating oil depot simulation system all can only be come the technological process of emulation oil depot accumulating by interface operation, facility on the sand table is fixing uncontrollable, the for example adjusting of valve, can only on operation interface, select " opening " or " closing " valve, the student can not take action on one's own to regulate the valve on the sand table, teaching, training lacks the necessary sense of reality, furthermore, because the facility on the sand table cannot be regulated, simulated program is the actual effect of mirror operation dynamically just also, and training is difficult to realize the purpose envisioned equally.
The utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, a kind of novel oil gas accumulating oil depot simulation system is provided, this system adopts forms such as sand table and animation, intuitively, simulate the technological process of oil depot vividly, realistically, allow the student have sensation on the spot in person, the enhancement training effect reduces training cost.
The purpose of this utility model is achieved through the following technical solutions: oil gas accumulating oil depot simulation system, it comprises sand table, touch-screen and flow process plate, the pipeline that sand table is provided with the oil gas warehousing and transportation facilities and connects warehousing and transportation facilities, be provided with operation valve and LED lamp band in the import and export pipeline of warehousing and transportation facilities, described warehousing and transportation facilities is distributed in the train trestle by function, the tank field, the pump house district, the fire extinguishing pump district, valve chamber peculiar to vessel, harbour, gasoline hair oil district, barrel filling district and Office Area, sand table has the PLC controller, the input of PLC controller is connected with operation valve, the output of PLC controller is connected with LED lamp band, simultaneously the PLC controller also is connected with computing machine in the touch-screen, and computing machine is connected with the flow process plate.
Flow process plate described in the utility model is a LCD.
Be provided with at least one oil pumping crane pipe in the train trestle described in the utility model; Be provided with at least one gasoline cistern and at least one diesel fuel tank in the tank field; Be provided with the clear groove jar of at least one gasoline, the clear groove jar of at least one diesel oil, the clear groove pump of at least one gasoline, the clear groove pump of at least one diesel oil, defeated pump and the defeated pump that changes of at least one diesel oil of changeing of at least one gasoline in the pump house district; Be provided with foam tank, fire-water pond, at least one foam fire pump and at least one fire pump in the fire extinguishing pump district, foam fire pump is connected with fire-water pond with foam tank by pipeline, and fire pump is connected with fire-water pond by pipeline; Be provided with the pump of unloading a ship, stripping pump and at least one oil filling riser peculiar to vessel in the harbour; Be provided with at least one storage tank and automobile hair oil oil filling riser thereof in the gasoline hair oil district; Be provided with at least one storage tank and barrel filling pipeline thereof in the barrel filling district.
The course of work of oil gas accumulating oil depot simulation system is as follows:
(1) be provided with a sand table that is used to simulate oil depot accumulating technological process, be used to gather the PLC controller of sand table upper pipeline state, the flow process plate that is used to control the touch-screen of PLC controller and shows oil depot accumulating technological process, the pipeline that sand table is provided with some warehousing and transportation facilities and connects warehousing and transportation facilities, be respectively arranged with the LED lamp band of liquid in operation valve and the simulative tube in the import and export pipeline of each warehousing and transportation facilities, the PLC controller flows to by acquisition controlling valve state and warehousing and transportation facilities State Control pipeline liquid;
(2) oil depot accumulating simulated program of operation on the touch-screen, operating personnel open or close one or more operation valves on the sand table according to the requirement of technological process, the variation of the real-time collection tube line state of simulated program, the change dynamics simulation process flow process according to technological requirement and pipeline state also is presented on the flow process plate with the form of animation in real time simultaneously.
The utility model adopts forms such as sand table and animation to simulate the technological process of oil depot accumulating intuitively, vividly, realistically, the student the operation of being done on the sand table whether appropriately also can be dynamically, in real time and interactively be illustrated on the flow process plate, allow the student have sensation on the spot in person, improve result of training, reduced training cost.
Description of drawings
Fig. 1 is a structured flowchart of the present utility model
Fig. 2 is a sand table structural representation of the present utility model
Fig. 3 receives oily process flow diagram for train
Fig. 4 is a train hair oil process flow diagram
Fig. 5 is an automobile hair oil process flow diagram
Fig. 6 receives oily process flow diagram for ship
Fig. 7 receives and dispatches oily process flow diagram during for failure of pump
Fig. 8 is for pouring in down a chimney process flow diagram
Among the figure, 1-train trestle, 2-tank field, 3-pump house district, 4-fire extinguishing pump district, 5-valve chamber peculiar to vessel, 6-harbour, 7-gasoline hair oil district, 8-barrel filling district, 9-Office Area.
Embodiment
Further describe the technical solution of the utility model below in conjunction with accompanying drawing:
As shown in Figure 1, oil gas accumulating oil depot simulation system, it comprises sand table, touch-screen and flow process plate, and sand table has the PLC controller, and the PLC controller is connected with the computing machine of sand table with touch-screen inside respectively, and computing machine is connected with outside flow process plate.
The pipeline that sand table is provided with the oil gas warehousing and transportation facilities and connects warehousing and transportation facilities is provided with operation valve and LED lamp band in the import and export pipeline of warehousing and transportation facilities, operation valve is connected with the PLC controller with LED lamp band.
As shown in Figure 2, sand table is provided with train trestle 1, tank field 2, pump house district 3, fire extinguishing pump district 4, valve chamber peculiar to vessel 5, harbour 6, gasoline hair oil district 7, barrel filling district 8 and Office Area 9, and wherein the composition of each subregion and function are as follows:
(1) train trestle: four tool oil pumping crane pipes 6 are arranged on the train trestle, be used for receiving oil and hair oil to train tanker vehicle from train tanker vehicle.
(2) tank field: the tank field is made up of four storage tanks, is respectively No. 93 gasoline tanks, No. 97 gasoline tanks, No. 0 diesel oil tank and-No. 10 diesel oil tanks, is used to store the oil product of respective type.
(3) pump house: pump house is one of core of whole oil depot system, and its major equipment is two centrifugal pumps on two vacuum tanks in left side, middle two vacuum pumps and right side.Vacuum tank and vacuum pump are used for the train sweeping, and centrifugal pump is used to carry oil product.
(4) fire extinguishing pump district: the fire extinguishing pump district is made up of a foam tank, two fire pumps, two foam fire pumps, two fire pumps are used for drawing water from fire-water pond and enter fire line, foam fire pump and foam tank are used to produce fire-fighting foams, and fire-fighting foams is sent into the fire-fighting foams pipeline.
(5) valve chamber peculiar to vessel: valve chamber peculiar to vessel is made up of a plurality of valves, is used to control harbour and receives the position that oil enters the station gut line.
(6) harbour: the major equipment of harbour is a vacuum pump and a centrifugal pump, and centrifugal pump is used for transporting oil products, and vacuum pump is used for sweeping.
(7) Office Area: the Office Area is made up of office building and pond, and this part does not have valid function equipment.
(8) automobile hair oil district: be provided with at least one storage tank and automobile hair oil oil filling riser thereof in the gasoline hair oil district, be used for oil product is delivered to truck tank.
(9) barrel filling district: be provided with at least one storage tank and barrel filling pipeline thereof in the barrel filling district, be used for oil product is packed in the barreled oil tank.
The course of work of oil gas accumulating oil depot simulation system is as follows:
(1) be provided with a sand table that is used to simulate the oil depot technological process, be used to gather the PLC controller of sand table upper pipeline state, the flow process plate that is used to control the touch-screen of PLC controller and shows oil depot accumulating technological process, the pipeline that sand table is provided with some warehousing and transportation facilities and connects warehousing and transportation facilities, be respectively arranged with operation valve in the import and export pipeline of each warehousing and transportation facilities, the PLC controller is by operation valve collection tube line state;
(2) oil depot accumulating simulated program of operation on the touch-screen, operating personnel open or close one or more operation valves on the sand table according to the requirement of technological process, the variation of the real-time collection tube line state of simulated program, the change dynamics simulation process flow process according to technological requirement and pipeline state also is presented on the flow process plate with the form of animation in real time simultaneously.
Simulated program comprises flow process demonstration, flow operations step, wherein, flow process demonstration comprises that train receives oily flow process, train hair oil flow process, automobile hair oil flow process, ship is received oily flow process, receive and dispatch oily operating process during failure of pump and pour in down a chimney the flow process substep, described flow operations comprises that equally train receives oily flow process, train hair oil flow process, automobile hair oil flow process, and ship is received oily flow process, receives and dispatches oily operating process during failure of pump and pours in down a chimney the flow process substep.
The difference of flow process demonstration and flow operations is that the flow process demonstration can only demonstrate technological process, is not subjected to foreign intervention in the presentation process, is unidirectional, and flow operations according to the actual conditions displaying technological process of operation, is interactively then.
Train receive oily flow process comprise a plurality of dissimilar steps such as train pump receive oil, train sweeping, train from current oil receiver, sweeping vacuum tank to storage tank etc., its effect is that the gasoline of various labels or diesel oil are transported to the product oil storage tank from train trestle district by pipeline and the defeated pump that changes, and Fig. 3 is delivered to the operation steps of the storage tank in barrel filling district from the oil filling riser in train trestle district:
(1) confirms starting point train trestle oil filling riser, open the valve on this oil filling riser then;
(2) confirm the terminal point storage tank, open the into valve of this storage tank then;
(3) open the defeated valve that changes between the pump of storage tank and gasoline;
(4) turn on pump:
1. open the pump inspection: inlet valve and the outlet valve of confirming pump are all closed;
2. prepare before opening pump: slowly open the pump intake valve, determine that the pump housing is full of medium;
3. turn on pump: slowly open the pump discharge valve, click " the defeated pump that changes of gasoline " corresponding on the touch-screen or " the defeated pump that changes of diesel oil " icon then, open the defeated pump that changes of gasoline or diesel oil, so far, flow process is finished.
Train hair oil flow process such as Fig. 4, its effect is by the defeated pump that changes the gasoline or the diesel oil of various labels to be transported to train trestle oil filling riser from storage tank, the concrete operations step is as follows:
(1) confirms the starting point storage tank, open out the valve of this storage tank then;
(2) confirm terminal point train trestle oil filling riser, open the valve on this oil filling riser then;
(3) open the defeated valve that changes between pump and the terminal point of gasoline;
(4) turn on pump:
1. open the pump inspection: inlet valve and the outlet valve of confirming pump are all closed;
2. prepare before opening pump: slowly open the pump intake valve, click " the defeated pump that changes of gasoline " corresponding on the touch-screen or " the defeated pump that changes of diesel oil " icon then, open the defeated pump that changes of gasoline or diesel oil, so far, flow process is finished.
Automobile hair oil flow process such as Fig. 5, its effect is by the defeated pump that changes the gasoline or the diesel oil of various labels to be transported to train trestle oil filling riser from storage tank, the concrete operations step is as follows:
(1) confirms the starting point storage tank, open out the valve of this storage tank then;
(2) turn on pump:
1. open the pump inspection: the inlet valve of confirming pump cuts out;
2. prepare before opening pump: slowly open the inlet valve of pump, determine that the pump housing is full of medium;
3. turn on pump: click " the defeated pump that changes of gasoline " corresponding on the touch-screen or " the defeated pump that changes of diesel oil " icon, open the defeated pump that changes of gasoline or diesel oil, so far, flow process is finished.
Ship is received oily flow process such as Fig. 6, and its effect is by the pump of unloading a ship the gasoline or the diesel oil of various labels to be transported to storage tank from oil filling riser peculiar to vessel, and the concrete operations step is as follows:
(1) confirms the terminal point storage tank, open the into valve of this storage tank then;
(2) open this storage tank and the valve between the pump of unloading a ship;
(3) turn on pump:
1. open the pump inspection: inlet valve and the outlet valve of confirming pump are closed;
2. prepare before opening pump: slowly open the pump intake valve, determine that the pump housing is full of medium;
3. turn on pump: slowly open the pump discharge valve, click " pump of unloading a ship " icon corresponding on the touch-screen then to open the pump of unloading a ship, so far, flow process is finished.
Receive and dispatch oily flow process such as Fig. 7 during failure of pump, its effect is when petrol pump breaks down, and train is received gasoline and carried from train trestle oil filling riser to storage tank or oppositely by the defeated pump that changes of diesel oil; Perhaps when diesel pump breaks down, train is received diesel oil and is carried from train trestle oil filling riser to storage tank or oppositely by the defeated pump that changes of gasoline, and clear groove pump is when fault occurring, train gasoline or diesel oil sweeping.When below being the petrol pump fault gasoline is transported to the operation steps of storage tank from train trestle oil filling riser:
(1) confirms starting point train trestle oil filling riser, open the valve on this oil filling riser then;
(2) confirm the terminal point storage tank, open the into valve of this storage tank then;
(3) open the defeated valve that changes between the pump of this storage tank and diesel oil;
(4) turn on pump:
1. open the pump inspection: inlet valve and the outlet valve of confirming pump are closed;
2. prepare before opening pump: slowly open the pump intake valve, determine that the pump housing is full of medium;
3. turn on pump: slowly open the pump discharge valve, click " the defeated pump that changes of diesel oil " icon corresponding on the touch-screen then to start the defeated pump that changes of diesel oil, so far, flow process is finished.
Pour in down a chimney flow process such as Fig. 8, its effect is to change pump to another storage tank from a storage tank by failing, and below is that gasoline is failed the operation steps that forwards another storage tank to from a storage tank:
(1) confirms the starting point storage tank, open out the valve of this storage tank then;
(2) confirm the terminal point storage tank, open the into valve of this storage tank then;
(3) open the defeated valve that changes between pump and the terminal point of gasoline;
(4) turn on pump:
1. open the pump inspection: inlet valve and the outlet valve of confirming pump are all closed;
2. prepare before opening pump: slowly open the pump intake valve, determine that the pump housing is full of medium;
3. turn on pump: slowly open the pump discharge valve, click " the defeated pump that changes of gasoline " icon corresponding on the touch-screen then to open the defeated pump that changes of gasoline, so far, flow process is finished.
Claims (2)
1. oil gas accumulating oil depot simulation system, it is characterized in that: it comprises sand table, touch-screen and flow process plate, the pipeline that sand table is provided with the oil gas warehousing and transportation facilities and connects warehousing and transportation facilities, be provided with operation valve in the import and export pipeline of warehousing and transportation facilities, described warehousing and transportation facilities is distributed in train trestle (1) by function, tank field (2), pump house district (3), fire extinguishing pump district (4), valve chamber peculiar to vessel (5), harbour (6), gasoline hair oil district (7), barrel filling district (8) and Office Area (9), sand table has PLC controller and LED lamp band, the input of PLC controller is connected with operation valve, the output of PLC controller is connected with LED lamp band, the PLC controller also is connected with computing machine in the touch-screen, and computing machine is connected with the flow process plate.
2. oil gas accumulating oil depot simulation system according to claim 1, it is characterized in that: described flow process plate is a LCD.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200959937U CN201965788U (en) | 2011-04-02 | 2011-04-02 | Simulation system for oil-gas storing and transporting depot |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011200959937U CN201965788U (en) | 2011-04-02 | 2011-04-02 | Simulation system for oil-gas storing and transporting depot |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201965788U true CN201965788U (en) | 2011-09-07 |
Family
ID=44528337
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011200959937U Expired - Fee Related CN201965788U (en) | 2011-04-02 | 2011-04-02 | Simulation system for oil-gas storing and transporting depot |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201965788U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102314783A (en) * | 2011-04-02 | 2012-01-11 | 成都盛特石油装备模拟技术开发有限公司 | System and method for simulating oil depot for oil and gas storage and transportation |
CN104732863A (en) * | 2015-03-16 | 2015-06-24 | 中国民航大学 | Airport fuel feed system simulation experimental device |
-
2011
- 2011-04-02 CN CN2011200959937U patent/CN201965788U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102314783A (en) * | 2011-04-02 | 2012-01-11 | 成都盛特石油装备模拟技术开发有限公司 | System and method for simulating oil depot for oil and gas storage and transportation |
CN104732863A (en) * | 2015-03-16 | 2015-06-24 | 中国民航大学 | Airport fuel feed system simulation experimental device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11624326B2 (en) | Methods and systems for supplying fuel to gas turbine engines | |
US20210079852A1 (en) | Methods and systems for supplying fuel to gas turbine engines | |
CN102313134B (en) | Oil and gas storage and transportation process flow simulating system and method | |
CN104157176A (en) | Airport oil depot work simulating and training system | |
CN102314783B (en) | System and method for simulating oil depot for oil and gas storage and transportation | |
CN204204305U (en) | Storage tank is kidney-yang training simulation device | |
CN201965835U (en) | Simulation system of oil-gas storage and transportation LNG (Liquefied Natural Gas) receiving station | |
CN201965788U (en) | Simulation system for oil-gas storing and transporting depot | |
CN202056520U (en) | Oil and gas storage and transportation process flow simulation system | |
CN107807603B (en) | A kind of machine level ground pipe network constant pressure Control system simulation device | |
CN102314793B (en) | System and method for simulating LNG (Liquefied Natural Gas) receiving station for oil and gas storage and transportation | |
CN2699941Y (en) | Combined foam distributing and mixing device in ratio | |
CN202730244U (en) | Solution preparation and supplement device for pickling tank | |
CN202018748U (en) | Fracture acidizing simulator | |
CN204463525U (en) | Gas-oil separation analogue simulation system | |
CN105858579B (en) | A kind of liquid storage pot, liquid reserve tank docking tapping control system and method | |
CN102313135B (en) | Oil and gas storage and transportation crude oil long-transportation simulating system and method | |
CN201271446Y (en) | Foam-mixing system with digital definite proportion | |
CN211455073U (en) | Simulation teaching sand table for liquefied hydrocarbon storage tank area | |
CN109949643A (en) | A kind of civil aviation fuel filling equipment training platform | |
CN203415120U (en) | Fire-fighting facility teaching demonstration device for oil tank in gas station | |
CN114220333A (en) | Full-pressure tank liquid storage leakage simulation method and system | |
CN104616555A (en) | Oil-gas separation analogue simulation system | |
CN109671327A (en) | A kind of airfield POL storage operation simulation system of environmental protection | |
CN203415156U (en) | Fire-fighting facility training sand table in gas station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 610061 Xiaojiahe high tech Zone, Chengdu, No. 46 street, Sichuan Patentee after: Chengdu petroleum equipment simulation technology Limited by Share Ltd Address before: 610061 Xiaojiahe high tech Zone, Chengdu, No. 46 street, Sichuan Patentee before: Chengdu Esimtech Petroleum Equipment Simulation Technology Exploitation Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110907 Termination date: 20190402 |
|
CF01 | Termination of patent right due to non-payment of annual fee |