A kind of insulating corrosion prestressed concrete pipe pile
Technical field
The utility model relates to a kind of pile tube, relates in particular to a kind of insulating corrosion prestressed concrete pipe pile.
Background technology
Being widely used of prestressed concrete pipe pile, the mechanical performance that it is good and easily manufacturing process make it become the constructional materials of all kinds of building first-selections.
This prestressed concrete pipe pile is when going deep into ground; circumstance complication of living in; especially in the unusual occasion of some acid-base value; though the outermost layer of prestressed concrete pipe pile is coated with cement mortar protective course; but still after being difficult to guarantee the several years; this cement mortar protective course is destroyed, causes the performance of this prestressed concrete pipe pile to be affected.
The utility model content
The utility model provides a kind of insulating corrosion prestressed concrete pipe pile at the drawback of prior art.
Insulating corrosion prestressed concrete pipe pile described in the utility model; comprise the steel pipe tube; described steel pipe drum outer wall is coated with cement mortar protective course; steel pipe drum outer wall in cement mortar protective course is wound with compressor wire; described steel pipe tube inwall is provided with the steel fibrous concrete layer, and described cement mortar protective course surface-coated has the three-layer polyethylene corrosion-inhibiting coating.
In the insulating corrosion prestressed concrete pipe pile described in the utility model; by surface-coated three-layer polyethylene corrosion-inhibiting coating at cement mortar protective course; can strengthen preserving and sealing greatly, effectively improve mechanical strength, and the water proofing property of this insulating corrosion prestressed concrete pipe pile is strong, steady quality, easy construction, applicability are strong, free from environmental pollution.
Description of drawings
Fig. 1 is the structural representation of insulating corrosion prestressed concrete pipe pile described in the utility model.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described in further detail, can implements according to this with reference to the manual literal to make those skilled in the art.
As shown in Figure 1; insulating corrosion prestressed concrete pipe pile described in the utility model; comprise steel pipe tube 1; described steel pipe tube 1 outer wall is coated with cement mortar protective course 3; steel pipe tube 1 outer wall in cement mortar protective course 3 is wound with compressor wire 2; described steel pipe tube 1 inwall is provided with steel fibrous concrete layer 5, and described cement mortar protective course 3 surface-coated have three-layer polyethylene corrosion-inhibiting coating 4.
The three-layer polyethylene aseptic technic is at present most widely used general, technology that antiseptic property is the best; in the insulating corrosion prestressed concrete pipe pile described in the utility model; by surface-coated three-layer polyethylene corrosion-inhibiting coating at cement mortar protective course; can strengthen preserving and sealing greatly, effectively improve mechanical strength, and the water proofing property of this insulating corrosion prestressed concrete pipe pile is strong, steady quality, easy construction, applicability are strong, free from environmental pollution.
Although embodiment of the present utility model is open as above, but it is not restricted to listed utilization in manual and the embodiment, it can be applied to the various fields of the present utility model that are fit to fully, for those skilled in the art, can easily realize other modification, therefore under the universal that does not deviate from claim and equivalency range and limited, the legend that the utility model is not limited to specific details and illustrates here and describe.