CN201955432U - 一种基于电缆零起升压的电缆耐压试验装置 - Google Patents
一种基于电缆零起升压的电缆耐压试验装置 Download PDFInfo
- Publication number
- CN201955432U CN201955432U CN2010206636431U CN201020663643U CN201955432U CN 201955432 U CN201955432 U CN 201955432U CN 2010206636431 U CN2010206636431 U CN 2010206636431U CN 201020663643 U CN201020663643 U CN 201020663643U CN 201955432 U CN201955432 U CN 201955432U
- Authority
- CN
- China
- Prior art keywords
- cable
- transformer
- voltage
- zero
- power supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Relating To Insulation (AREA)
Abstract
本实用新型涉及一种基于电缆零起升压的电缆耐压试验装置,该装置包括电源、调压器、升压试验变压器、补偿电抗器、500kV主变、被试电缆,所述的电源与调压器连接,所述的调压器与升压试验变压器连接,所述的升压试验变压器与补偿电抗器连接,所述的补偿电抗器与500kV主变连接,所述的500kV主变与被试电缆连接。与现有技术相比,本实用新型具有连接结构简单、试验成本低、试验周期短、可靠性高等优点。
Description
技术领域
本实用新型涉及电缆耐压试验装置,尤其是涉及一种基于电缆零起升压的电缆耐压试验装置。
背景技术
随着上海世博会的召开,上海电网的用电负荷逐年攀升。为适应上海电网发展的需要,缓解中心城区供电压力,并确保2010年“世博会”的电力供应,500千伏世博输变电工程将深入中心城区。500kV世博输变电工程是2010年上海世博会的重要配套项目,已被列为上海市重大工程。世博站的建设可大大增强上海市区电网的受电能力,满足中心城区用电的需要。
世博工程中,将敷设两回从浦东三林站到浦西世博站500kV交联电缆,线路长度超过15km。由于500kV长距离交联电缆属国内首次使用,长距离的500kV交联电缆系统(电缆本体、中间接头与终端)在世界上的应用也不多,仅日本东京电力公司新丰洲-京叶线于2000年投入实际使用。因此,交联电缆投运前应进行全面的竣工验收,以评价电缆的生产和安装质量。但由于交联电缆线路长、电容量大,竣工验收主绝缘试验难度较大。
实用新型内容
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种连接结构简单、试验成本低、试验周期短、可靠性高的基于电缆零起升压的电缆耐压试验装置。
本实用新型的目的可以通过以下技术方案来实现:一种基于电缆零起升压的电缆耐压试验装置,其特征在于,该装置包括电源、调压器、升压试验变压器、补偿电抗器、500KV主变、被试电缆,所述的电源与调压器连接,所述的调压器与升压试验变压器连接,所述的升压试验变压器与补偿电抗器连接,所述的补偿电抗器 与500KV主变连接,所述的500KV主变与被试电缆连接。
所述的电源为35KV电源。
所述的补偿电抗器为单向串并联结构,2个单相电抗串联成1组,再3组并联。
所述的调压器为调节范围0~35kV的调压器。
与现有技术相比,本实用新型具有连接结构简单、试验成本低、试验周期短、可靠性高的优点。
附图说明
图1为本实用新型的结构示意图。
具体实施方式
下面结合附图和具体实施例对本实用新型进行详细说明。
实施例
如图1所示,一种基于电缆零起升压的电缆耐压试验装置,该装置包括电源6、调压器1、升压试验变压器2、补偿电抗器3、500KV主变4、被试电缆5。电源6与调压器1连接,向调压器1提供电能。调压器1与升压试验变压器2连接。升压试验变压器2与补偿电抗器3连接。补偿电抗器3与500KV主变4连接。500KV主变4与被试电缆5连接。电源为35KV电源。补偿电抗器为单向串并联结构,2个单相电抗串联成1组,再3组并联。调压器为调节范围0~35kV的调压器。
试验电缆每根无功为:113.7Mvar。
利用主变66kV侧补偿电抗器,2个单相电抗串联成1组,再3组并联,按1.1倍电压考虑补偿容量为119.9Mvar,另加主变本身无功补偿0.33Mvar,已过补偿电缆的容性无功。经估算,试验变压器需要输出的无功约为:6.5MVar,试验回路的有功损耗估计约为700kW,所以升压试验变压器和调压器的容量需7MVA,相应要求世博站内电源达到7MVA。本实用新型充分利用了站内补偿电抗器,因此成本低,且在试验中即使发生电缆绝缘击穿,也不会危及高压电网的安全。
Claims (4)
1.一种基于电缆零起升压的电缆耐压试验装置,其特征在于,该装置包括电源、调压器、升压试验变压器、补偿电抗器、500KV主变、被试电缆,所述的电源与调压器连接,所述的调压器与升压试验变压器连接,所述的升压试验变压器与补偿电抗器连接,所述的补偿电抗器与500KV主变连接,所述的500KV主变与被试电缆连接。
2.根据权利要求1所述的一种基于电缆零起升压的电缆耐压试验装置,其特征在于,所述的电源为35KV电源。
3.根据权利要求1所述的一种基于电缆零起升压的电缆耐压试验装置,其特征在于,所述的补偿电抗器为单向串并联结构,2个单相电抗串联成1组,再3组并联。
4.根据权利要求1所述的一种基于电缆零起升压的电缆耐压试验装置,其特征在于,所述的调压器为调节范围0~35kV的调压器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206636431U CN201955432U (zh) | 2010-12-16 | 2010-12-16 | 一种基于电缆零起升压的电缆耐压试验装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206636431U CN201955432U (zh) | 2010-12-16 | 2010-12-16 | 一种基于电缆零起升压的电缆耐压试验装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201955432U true CN201955432U (zh) | 2011-08-31 |
Family
ID=44499540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206636431U Expired - Fee Related CN201955432U (zh) | 2010-12-16 | 2010-12-16 | 一种基于电缆零起升压的电缆耐压试验装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201955432U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104849613A (zh) * | 2015-05-08 | 2015-08-19 | 北京电力经济技术研究院 | 一种500kV及以上电压等级的电缆试验检测一体化移动平台 |
CN113466643A (zh) * | 2021-06-29 | 2021-10-01 | 国网陕西省电力公司电力科学研究院 | 一种带有单相并联电抗器的电缆线路耐压试验方法 |
-
2010
- 2010-12-16 CN CN2010206636431U patent/CN201955432U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104849613A (zh) * | 2015-05-08 | 2015-08-19 | 北京电力经济技术研究院 | 一种500kV及以上电压等级的电缆试验检测一体化移动平台 |
CN113466643A (zh) * | 2021-06-29 | 2021-10-01 | 国网陕西省电力公司电力科学研究院 | 一种带有单相并联电抗器的电缆线路耐压试验方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wang et al. | Grid-connected wind farm power control using VRB-based energy storage system | |
CN109698495B (zh) | 一种基于超级电容的直流微电网系统 | |
CN103607032A (zh) | 可再生能源发电、输变电和电网接入一体化系统 | |
Li et al. | Prospect of new pumped-storage power station | |
CN203951202U (zh) | 一种风光互补户用微电网供电系统 | |
CN110474321A (zh) | 组合式清洁能源发电系统及其运行方法 | |
CN104410091A (zh) | 基于变流器控制的风储能量管理系统及其控制方法 | |
CN103078329B (zh) | 海上风电场长距离220kV海缆送出无功补偿分析方法 | |
CN102738807A (zh) | 风电场集中接入公用变电站的全站无功优化控制方法 | |
CN203589824U (zh) | 可再生能源发电、输变电和电网接入一体化系统 | |
CN108347067A (zh) | 一种含有电池储能和发电机的微网架构和控制方法 | |
CN103346584B (zh) | 光伏并网系统及功率补偿方法 | |
CN201955432U (zh) | 一种基于电缆零起升压的电缆耐压试验装置 | |
Li et al. | Requirement analysis on large-scale renewable energy DC collection and transmission technology | |
CN203056604U (zh) | 一种新型智能微电网 | |
CN203574397U (zh) | 多功能可再生能源供电系统 | |
CN203840063U (zh) | 储能装置 | |
CN201286066Y (zh) | 能量可双向流动的双pwm逆变器 | |
CN203536974U (zh) | 一种区域分布式光伏供电并网系统 | |
CN101656485A (zh) | 能量可双向流动的双pwm逆变器 | |
CN203537052U (zh) | 多功能可再生能源转换系统 | |
CN103490500A (zh) | 多功能可再生能源转换系统 | |
CN208674926U (zh) | 一种移动式储能充电系统 | |
CN208158135U (zh) | 一种含有电池储能和发电机的微网架构 | |
He et al. | Simulation of large-scale energy storage to improve high-voltage DC stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110831 Termination date: 20191216 |