CN201952102U - Hoisting clamp - Google Patents

Hoisting clamp Download PDF

Info

Publication number
CN201952102U
CN201952102U CN2011200499492U CN201120049949U CN201952102U CN 201952102 U CN201952102 U CN 201952102U CN 2011200499492 U CN2011200499492 U CN 2011200499492U CN 201120049949 U CN201120049949 U CN 201120049949U CN 201952102 U CN201952102 U CN 201952102U
Authority
CN
China
Prior art keywords
hook
clamping plate
bearing pin
stone tongs
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200499492U
Other languages
Chinese (zh)
Inventor
朱毅
朱洪兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Hongxing Industry & Trade Co Ltd
Original Assignee
Sichuan Hongxing Industry & Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Hongxing Industry & Trade Co Ltd filed Critical Sichuan Hongxing Industry & Trade Co Ltd
Priority to CN2011200499492U priority Critical patent/CN201952102U/en
Application granted granted Critical
Publication of CN201952102U publication Critical patent/CN201952102U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hoisting clamp comprising a first hook, a second hook, clamp plates and a steel wire rope, wherein the first hook is intersected and flexibly connected with the second hook; the top end of the first hook is flexibly connected with the clamp plate A; the top end of the second hook is flexibly connected with the clamp plate B; and the steel wire rope penetrates through the clamp plates A and B in sequence. The hoisting clamp is mainly formed by intersecting and flexibly connecting two hooks, therefore the hoisting clamp is firm in clamping, simple in structure, low in cost, convenient to operate and suitable for use in various situations.

Description

Stone tongs
Technical field
The utility model relates to a kind of anchor clamps that various materials are used that are used to clamp and lift.
Background technology
When big part material or product needed are carried, often need operate by locomotive, the suspender on the locomotive plays an important role in the whole operation process.But existing suspender clamps not strongly admittedly when the clamping object, and held object comes off easily, thereby causes damage product easily, accidentally injures accidents such as operating personal.
The utility model content
The purpose of this utility model is the deficiency that overcomes existing suspender, provides a kind of simple in structure, flexible operation, convenience, the stone tongs that clamping is firm.
For achieving the above object, the technical scheme that the utility model adopted is: a kind of stone tongs, comprise first hook, second hook, clamping plate and steel cable, and it is characterized in that: first hook and second is linked up with and to be intersected flexible connection; The first hook top and A clamping plate flexibly connect, and the second hook top and B clamping plate flexibly connect; Described steel cable passes A clamping plate and B clamping plate successively.
Described first hook is gone up with the second hook infall and is provided with the through hole that passes for second hook.Described first hook be connected by bearing pin between second links up with.The top of described first hook is through in the A clamping plate and by bearing pin and interconnects, and the second hook top is through in the B clamping plate and also interconnects by bearing pin.
Described A clamping plate and B clamping plate all are made up of two steel plates, and two steel plates, one end connects by bearing pin, and the other end connects by double-screw bolt; Double-screw bolt is provided with pulley.
The knotting of described steel cable two ends, the centre is walked around pulley and is passed two A clamping plate and B clamping plate.
The utility model mainly adopts two hooks intersect to flexibly connect and forms, so holding articles is firm, and simple in structure, with low cost, handled easily, maintenance, is suitable for various occasions and uses.
Description of drawings
Fig. 1 is the utility model structural representation
Fig. 2 is the first hook through hole local structure scheme drawing
Fig. 3 is the clamp region scheme drawing
Among the figure: 1-first hook; 2-second hook, the 3-through hole; The 4-A bearing pin; The 5-steel cable; The 6-B bearing pin; 6.1-C bearing pin; The 7-double-screw bolt; The 8-pulley; The 9-A clamping plate; The 10-B clamping plate.
The specific embodiment
Below in conjunction with accompanying drawing the technical solution of the utility model is described further,
As shown in Figure 1, 2: stone tongs is made up of first hook, 1, second hook 2, two clamping plate and steel cable 5.Second hook 2 passes that the through hole 3 of first hook on 1 intersects mutually with first hook 1 and by 4 flexible connections of A bearing pin.First hook 1 top and A clamping plate 9 flexibly connect, and second hook 2 tops and B clamping plate 10 flexibly connect, the knotting of described steel cable 5 two ends, and the centre is passed A clamping plate and B clamping plate successively.The top of first hook 1 is through in the A clamping plate 9 and by B bearing pin 6 and interconnects, and second hook, 2 tops are through in the B clamping plate 10 and interconnect by C bearing pin 6.1.
As shown in Figure 3: A clamping plate and B clamping plate all are made up of two steel plates, and two steel plates, one end connects by bearing pin, and the other end connects by double-screw bolt.The top of first hook and second hook all is to be through between two steel plates of clamping plate to be flexibly connected with clamping plate by B bearing pin 6 and C bearing pin 6.1 respectively.The double-screw bolt 7 of clamping plate is provided with pulley 8, and steel cable 5 is to pass two clamping plate on pulley 8 then, is using like this, and pulling steel cable 5 just can make two hooks draw close to the centre, and the clamping operand reaches the purpose of clamping, transportation and clamping and firmly can not produce and come off.

Claims (7)

1. stone tongs comprises first hook (1), second hook (2), clamping plate and the steel cable (5), it is characterized in that: first hook (1) and second is linked up with (2) and is intersected flexible connection; First hook (1) top and A clamping plate (9) flexibly connect, and second hook (2) top and B clamping plate (10) flexibly connect; Described steel cable (5) passes A clamping plate and B clamping plate successively.
2. stone tongs according to claim 1 is characterized in that described first hook (1) is gone up and second hook (2) infall is provided with the through hole (3) that passes for second hook (2).
3. stone tongs according to claim 1 is characterized in that described A clamping plate and B clamping plate all are made up of two steel plates, and two steel plates, one end is connected with C bearing pin (6.1) by B bearing pin (6), and the other end passes through double-screw bolt (7) connection.
4. stone tongs according to claim 3 is characterized in that described double-screw bolt (7) is provided with pulley (8).
5. stone tongs according to claim 1 is characterized in that the knotting of described steel cable (5) two ends, and the centre is walked around pulley (8) and passed two A clamping plate and B clamping plate.
6. stone tongs according to claim 1 is characterized in that described first hook (1) and second is linked up with between (2) to be connected by A bearing pin (4).
7. stone tongs according to claim 1, the top that it is characterized in that described first hook (1) is through in the A clamping plate and interconnects by B bearing pin (6); Second hook (2) top is through in the B clamping plate and interconnects by C bearing pin (6.1).
CN2011200499492U 2011-02-28 2011-02-28 Hoisting clamp Expired - Fee Related CN201952102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200499492U CN201952102U (en) 2011-02-28 2011-02-28 Hoisting clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200499492U CN201952102U (en) 2011-02-28 2011-02-28 Hoisting clamp

Publications (1)

Publication Number Publication Date
CN201952102U true CN201952102U (en) 2011-08-31

Family

ID=44496224

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200499492U Expired - Fee Related CN201952102U (en) 2011-02-28 2011-02-28 Hoisting clamp

Country Status (1)

Country Link
CN (1) CN201952102U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950826A (en) * 2014-05-17 2014-07-30 南昌航空大学 Width-adjustable clamping lifting tool for lifting square tubular objects
CN106113134A (en) * 2016-07-26 2016-11-16 浙江川洋家居股份有限公司 A kind of removable scissor Handling device of sponge
CN108726347A (en) * 2017-11-20 2018-11-02 江苏核电有限公司 A kind of partition board of steam turbine lifting tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103950826A (en) * 2014-05-17 2014-07-30 南昌航空大学 Width-adjustable clamping lifting tool for lifting square tubular objects
CN106113134A (en) * 2016-07-26 2016-11-16 浙江川洋家居股份有限公司 A kind of removable scissor Handling device of sponge
CN108726347A (en) * 2017-11-20 2018-11-02 江苏核电有限公司 A kind of partition board of steam turbine lifting tool

Similar Documents

Publication Publication Date Title
CN201315445Y (en) Slinger fixing device for hanging iron tower angle steel pulley
CN204474157U (en) For the equipment for supporting patient with burn of steel box-girder
CN201952102U (en) Hoisting clamp
CN201670644U (en) Roof truss hoisting device
CN203781627U (en) Component lifting device
CN203656054U (en) Fastening-type wedge-shaped connector
CN103010939A (en) Mine lifting hook device
CN202575711U (en) Appliance for lifting ring pieces
CN205973449U (en) Jack -up handling rigging of buffering pulley
CN203998573U (en) A kind of overhead hoist
CN203319501U (en) Lifting device for charging chinlon slices
CN201932808U (en) Lifting appliance
CN204057671U (en) A kind of hanging clamp of barreled adhesives
CN202131014U (en) Fork hook
CN202897773U (en) Combined balance beam
CN201789387U (en) Fixture rotor dispersing sheet overlapping clamp
CN202897793U (en) Lifting appliance for overturning steel
CN201686400U (en) None-pressing fast suspension hook for suspending
CN201907916U (en) Hoisting device
CN202448063U (en) Clamping mechanism suitable for small clamping stroke
CN203269338U (en) Motor lifting device
CN204057672U (en) A kind of combined material suspender
CN220787795U (en) Horizontal clamping device for hoisting steel plate
CN102581787A (en) Clamping mechanism suitable for small clamping travel
CN202245684U (en) Fixture for wind power main shaft forged piece with high safety

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20140228