CN201950062U - Cool type drawing steel tube - Google Patents

Cool type drawing steel tube Download PDF

Info

Publication number
CN201950062U
CN201950062U CN201020643700XU CN201020643700U CN201950062U CN 201950062 U CN201950062 U CN 201950062U CN 201020643700X U CN201020643700X U CN 201020643700XU CN 201020643700 U CN201020643700 U CN 201020643700U CN 201950062 U CN201950062 U CN 201950062U
Authority
CN
China
Prior art keywords
conduit
steel pipe
cooled
big envelope
dialled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020643700XU
Other languages
Chinese (zh)
Inventor
蒋弦弋
陈帆
陈听雨
谭龙海
王晋国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoguan Iron And Steel Group Co Ltd Guandong Prov
SGIS Songshan Co Ltd
Shaogang Songshan Co Ltd Guangdong
Original Assignee
Shaoguan Iron And Steel Group Co Ltd Guandong Prov
Shaogang Songshan Co Ltd Guangdong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoguan Iron And Steel Group Co Ltd Guandong Prov, Shaogang Songshan Co Ltd Guangdong filed Critical Shaoguan Iron And Steel Group Co Ltd Guandong Prov
Priority to CN201020643700XU priority Critical patent/CN201950062U/en
Application granted granted Critical
Publication of CN201950062U publication Critical patent/CN201950062U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Metal Rolling (AREA)

Abstract

The utility model relates to a cool type drawing steel tube, comprising a duct front support, a duct and a duck back support for making a wire pass through and communicated with each other in turn and a guide nozzle for toggling the front part of the wire, a water cooling envelop nested with outside of the duct, wherein two heads of the envelop are respectively provided with a water-in joint of the cool water and a water-out joint. The cool type drawing steel tube uses a cycle cooling device to cool the drawing steel tube, therefore the performance of the drawing steel tube for resisting series deformation is reinforced, the hit rate of the work position switch of the drawing steel tube is increased, the failure rate of the high-speed wire mill is reduced, the service life of the drawing steel tube is prolonged to facilitate promotion and implementation.

Description

A kind of cooled is dialled steel pipe
Technical field
The utility model relates to a kind of metallurgical device, and more particularly, the utility model relates to a kind of metallurgical machinery device of processing wire rod.
Background technology
The rod-rolling mill of high-speed wire production line, subsequent configuration have the 3# flying shear, so that continuous rolled piece is implemented haircut, or in time will remain rolled piece shear cataclasm in case fault expansion when milling train and upstream device break down.And be that the accurate turn-out track in time of rolled piece is navigated to required rolling position or shears the position, key is to be close to 3# flying shear group steel pipe before can accurately and timely swing to required station with workpiece front end.For this reason, the linearity of dialling the steel pipe center line before the 3# flying shear is most important.
The conduit level butt joint form that traditional 3# flying shear is dialled steel pipe is: bearing, conduit, conduit rear support and the guiding of stirring the wire rod front portion are chewed before the conduit that connect to connect in regular turn, the conduit length overall is about 1175mm, diameter of bore is generally φ 30mm, and the conduit external diameter is generally φ 60mm.The guiding of dialling the steel pipe port of export chew and the conduit rear support between utilize the hexagon socket head cap screw of straight tube flange and M6*40 to be connected and fixed; Before and after bearing all be installed on the turn-out track support by cotter way and pin, brushless small machine and drive unit drive the turn-out track support and on dial the steel pipe swing, turn to different stations such as required shearing position, rolling position or cataclasm position thereby drive the wire rod front portion.
But long-term the use finds that tradition is dialled steel pipe and had following shortcoming:
1) because the needs of economical operation, Rolling Production all is that fast pace carries out continuously usually, therefore, in the continuous rolling production process, dial the motion of steel tube inner hole high speed owing to driven the rolled pieces such as wire rod that advance at the 3# flying shear by preceding working procedure, and the rolled piece temperature up to 1000 ℃ about, cause dialling the middle conduit flexural deformation gradually under high temperature and impact of steel pipe front and back bearing, usually, when rolling time continued 48 hours or more than, the deformation of guide tube that the 3# flying shear is dialled in the middle of the steel pipe can be all the more obviously with serious, so that dial the serious flexural deformation of steel pipe and can't drive rolled piece and accurately navigate to rolling position, cause heap steel fault thereby can cause rolled piece to depart from rolling guide groove from shearing the position conversion.
2) the long-term high speed of rolled piece in dialling steel pipe passed through the wearing and tearing that cause dialling the steel pipe inwall, add the influence that is subjected to rolled piece high temperature, microstructure and the mechanical strength of dialling the steel pipe material also can be affected, and this has aggravated the wearing and tearing of group steel pipe inwall, increase along with rolling tonnage, the wearing and tearing of dialling the steel pipe inwall are increasing, even it is worn out and cause heap steel accident to cause dialling steel pipe walls.
3) the 3# flying shear dial steel pipe by the front and back bearing and on cotter way and pin be installed on the turn-out track support, via brushless small machine and drive unit drive the turn-out track support and on the steel pipe of dialling carry out brute force and swing, because the powerful at a high speed turn-out track of drive unit impacts, dial the steel pipe export orientation chew with the conduit rear support between flange be connected with bolt and the phenomenon that gets loose can often occur, thereby directly the linearity of center line in the steel pipe is dialled in influence, cause turn-out track location inaccurate, the branch that rolled piece can hit passage after by haircut causes heap steel accident to plate.
Causing heap steel fault in case dial all distortion of steel pipe because of the 3# flying shear, is to guarantee ordinary production and stable operation, and whole production line just can only be shut down completely, change group steel pipe of distortion by the time after, could start shooting again.
Therefore the serial shortcoming that tradition is dialled steel pipe has not only influenced carrying out smoothly of producing, and has wasted valuable stocking and production time, and the distortion of changing dials steel pipe and can only scrap processing because of repairing also, has increased equipment operating cost.
Summary of the invention
Above-mentioned shortcoming at prior art, the purpose of this utility model is to provide a kind of cooled to dial steel pipe, it has following advantage: adopt cooling back installation to cool off dialling steel pipe, thereby strengthened group steel pipe at one stroke and resisted serial deformation ability, improved the hit rate of group steel pipe conversion station, reduce the high-speed rod-rolling mill equipment failure rate, prolonged the service life of group steel pipe, be convenient to promotion and implementation.
For this reason, technical solution of the present utility model is that a kind of cooled is dialled steel pipe, its be included as wire rod by and before the conduit that connect to connect in regular turn bearing, conduit, conduit rear support and the guiding of stirring the wire rod front portion chew, and described catheter jacket has water-cooled big envelope, is respectively equipped with the water supply connector and the water out adapter of cooling water at two of this big envelope.
The utility model is being dialled one section in the longest conduit of steel pipe, increase by one section water-cooled big envelope, pass to cooling water therein to being subjected to high temperature, at a high speed, impact, wearing and tearing the most very and the easiest deforming, rotten, the conduit of wearing and tearing cools off, thereby strengthened group steel pipe at one stroke and resisted serial deformation ability, both alleviated the directly influence of distortion of high temperature, also alleviated the destructive power of stocking high speed impact and wearing and tearing, substantially eliminated high temperature to dialling the rotten influence of steel pipe material, and the constant intensity of dialling steel pipe under the low temperature also be highly resistant to turn-out track impact for guiding chew with rear support between the influence that gets loose that is connected with set bolt of flange, obviously, the resistance capacity to deformation that the utility model is dialled steel pipe to be increased can improve the hit rate of swing shearing, thereby reduce the high-speed rod-rolling mill equipment failure rate, prolong the service life of dialling steel pipe, and simple in structure, be convenient to promotion and implementation.
Chew for further guaranteeing to lead and rear support between lower temperature, the bigger bonding strength of flange and set bolt place, thereby improve whole non-deformability, the utility model comprises that following concrete structure improves:
Described water supply connector is located near conduit rear support one end, and described water out adapter is located near bearing one end before the conduit.
Described conduit rear support and guiding are chewed is connected corresponding with bolt of ring flange by separately, on the ring flange periphery of butt joint, comprise that also groove welds welding ring or a plurality of equally distributed pad of formation.The connection rigidity of associated joint can be further guaranteed in the groove welding, guarantees this weak part non-deformability fully.
On the ring flange periphery that described conduit rear support and guiding are chewed, described bevel for welding is of a size of 4 * 4mm.
For guaranteeing that further conduit and front and back bearing thereof have lower temperature, bigger non-deformability, the utility model comprises that following concrete structure improves:
The length of described big envelope is the 80-95% of described catheter length.
One end of described big envelope is welded on the end face of the preceding bearing of described conduit, and the other end of big envelope is welded on the end face of described conduit rear support.
Thereby for providing sufficient cooling water inflow to guarantee that further conduit and front and back bearing thereof have lower temperature, bigger non-deformability, the utility model comprises that following concrete structure improves:
Interlayer spacing between described big envelope inwall and conduit outer wall is the 10-30% of described conduit external diameter.
Be the stable supply of further guaranteeing cooling water and the working life of installing, the utility model comprises that following concrete structure improves:
The water supply connector of described big envelope and water out adapter are connected the flexible pipe of recirculated water respectively.
Described big envelope is that stainless steel tube is made.
For guaranteeing that further stocking is connecting smooth and easy the advancing of endoporus high speed, the utility model comprises that following concrete structure improves:
Bearing, conduit, conduit rear support, guiding are chewed the endoporus that all has separately before the described conduit, the successive place of these endoporus or be that smooth aligning connects, or be oblique conical surface connection.
In a word, the utility model provides a kind of long service life, and rate of breakdown is low, and flying shear reliable and stable in the production process is dialled steel pipe; Overcome flying shear in the prior art dial the design of steel pipe unreasonable, in use be easy to generate disadvantages such as getting loose of flexural deformation, wearing and tearing, attaching parts, solved take place frequently the in process of production technical problem of heap steel accident of high-speed rod, prolonged the service life that high-speed rod-rolling mill 3# flying shear is dialled steel pipe, improved the shearing hit rate, reduce the high-speed rod-rolling mill equipment failure rate, also improved the service life that flying shear is dialled steel pipe greatly.
Facts have proved: owing to obtain continuing cooling in the production process, the temperature of the utility model intermediate conductor remains in producing continuously and is lower than 110 ℃, avoided the high temperature rolled piece to dialling the negative effect that bring in the steel pipe stage casing, the wearability and the service life of having improved group steel pipe greatly effectively.Add up by tracking data; tradition is dialled the average rolling tonnage of steel pipe about 5000 tons; can hold 2 days rolling continuous time; and the utility model is dialled the average rolling tonnage of steel pipe and can be reached 100,000 tons of wire rods; can hold 50 days rolling continuous time, thereby significantly reduce the spare part cost, significantly save to shut down and changed the time of dialling steel pipe and dial the heap steel accident that the steel pipe fault causes; provide strong assurance smoothly to the stable of production, significantly improved production efficiency.
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Description of drawings
Fig. 1 is the cross-sectional schematic that tradition is dialled the steel pipe duty.
Fig. 2 is the cross-sectional schematic that tradition is dialled steel pipe.
Fig. 3 is that Fig. 1 tradition is dialled the A-A of steel pipe omission turn-out track support to cross-sectional schematic.
Fig. 4 dials the cross-sectional schematic of steel pipe embodiment for the utility model.
Fig. 5 omits the B-B of turn-out track support to cross-sectional schematic for Fig. 4 embodiment.
As Fig. 1-3, shown in be respectively the schematic diagram that tradition is dialled the multiple visual angle under steel pipe duty and other state.Tradition dial steel pipe be included as wire rod X by and the guiding that connects bearing 10, conduit 20, conduit rear support 30 before the conduit that connects in regular turn and stir the wire rod front portion chews 40, guiding chew 40 with conduit rear support 30 between utilize straight tube flange 31,41 to dock and M6x40 hexagon socket head cap screw L is connected and fixed; Bearing 10, rear support 30 are installed on the turn-out track support 50 by cotter way on it and pin 11,32 respectively before the conduit, via brushless small machine and drive unit (all not giving detailed showing) drive turn-out track support 50 and on the steel pipe of dialling carry out brute force and swing, the head that drives the wire rod X that passes through at a high speed swings up and down (shown in curved arrow), thereby realizes shearing the station conversion of position-rolling position-cataclasm position.Thereby, tradition group steel pipe causes heap steel fault and production line stop accident but being easy to generate all distortion because of high temperature.
The specific embodiment
As Fig. 4,5, shown in be respectively the schematic diagram that the utility model cooled is dialled the different visual angles of steel pipe embodiment.Embodiment be included as wire rod X (referring to Fig. 1) by and before the conduit that connect to connect in regular turn conduit 20, the conduit rear support 30 of bearing 10, diameter of bore φ 30mm external diameter φ 60mm and the guiding of stirring wire rod X front chew 40, bearing 10, conduit 20, conduit rear support 30, guiding are chewed 40 endoporus that all have separately before the described conduit, the successive place of these endoporus or be that smooth aligning connects (between conduit 20 and conduit rear support 30 endoporus) also comprises oblique conical surface connection (chewing between 40 endoporus as conduit rear support 30 and guiding).
Bearing 10, rear support 30 are installed on the turn-out track support 50 by cotter way on it and pin 11,32 before the conduit, via brushless small machine and drive unit (all not giving detailed showing) drive turn-out track support 50 and on the steel pipe of dialling carry out brute force and swing, drive the wire rod that passes through at a high speed and swing up and down (shown in curved arrow), thereby realize the station conversion of shearing position-rolling position-cataclasm position.
And the described conduit 20 outer stainless steel tube formula water cooling big envelopes 60 that are with, an end of big envelope 60 is welded on the end face of the preceding bearing 10 of described conduit, and the other end of big envelope 60 is welded on the end face of described conduit rear support 30.The length of described big envelope is the 80-95% of described catheter length.Interlayer spacing between described big envelope 60 inwalls and conduit 20 outer walls is the 10-30% of described conduit 20 external diameters.Be respectively equipped with the water supply connector 61 and the water out adapter 62 of cooling water at these big envelope 60 two.Described water supply connector 61 is located near conduit rear support 30 1 ends, and described water out adapter is located near bearing 10 1 ends before the conduit.The water supply connector 61 of described big envelope 60 and water out adapter 62 are connected the flexible pipe (not giving detailed showing) of recirculated water respectively.
Described conduit rear support 30 is chewed 40 ring flanges 31,41 that pass through separately with guiding and is connected with bolt L is corresponding, bolt L is changed into the hexagon socket head cap screw of 12.9 grades M8x40 by 8.8 grades of traditional M6x40, increased the intensity of connecting bolt, on ring flange 31,41 peripheries of butt joint, also comprise welding ring H or a plurality of equally distributed pad H that the welding of 4 * 4mm groove forms.

Claims (10)

1. a cooled is dialled steel pipe, its be included as wire rod by and before the conduit that connect to connect in regular turn bearing, conduit, conduit rear support and the guiding of stirring the wire rod front portion chew, it is characterized in that: described catheter jacket has water-cooled big envelope, is respectively equipped with the water supply connector and the water out adapter of cooling water at two of this big envelope.
2. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: described water supply connector is located near conduit rear support one end, and described water out adapter is located near bearing one end before the conduit.
3. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: described conduit rear support and guiding are chewed be connected corresponding with bolt of ring flange by separately, on the ring flange periphery of butt joint, also comprise welding ring or a plurality of equally distributed pad that the groove welding forms.
4. cooled as claimed in claim 3 is dialled steel pipe, it is characterized in that: on the ring flange periphery that described conduit rear support and guiding are chewed, described bevel for welding is of a size of 4 * 4mm.
5. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: the length of described big envelope is the 80-95% of described catheter length.
6. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: an end of described big envelope is welded on the end face of the preceding bearing of described conduit, and the other end of big envelope is welded on the end face of described conduit rear support.
7. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: the interlayer spacing between described big envelope inwall and conduit outer wall is the 10-30% of described conduit external diameter.
8. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: the water supply connector of described big envelope and water out adapter are connected the flexible pipe of recirculated water respectively.
9. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: described big envelope is that stainless steel tube is made.
10. cooled as claimed in claim 1 is dialled steel pipe, it is characterized in that: bearing, conduit, conduit rear support, guiding are chewed the endoporus that all has separately before the described conduit, the successive place of these endoporus or be that smooth aligning connects, or be oblique conical surface connection.
CN201020643700XU 2010-12-06 2010-12-06 Cool type drawing steel tube Expired - Fee Related CN201950062U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020643700XU CN201950062U (en) 2010-12-06 2010-12-06 Cool type drawing steel tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020643700XU CN201950062U (en) 2010-12-06 2010-12-06 Cool type drawing steel tube

Publications (1)

Publication Number Publication Date
CN201950062U true CN201950062U (en) 2011-08-31

Family

ID=44494189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020643700XU Expired - Fee Related CN201950062U (en) 2010-12-06 2010-12-06 Cool type drawing steel tube

Country Status (1)

Country Link
CN (1) CN201950062U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989794A (en) * 2012-11-28 2013-03-27 江苏永钢集团有限公司 Water-cooled shifting block device
CN112474835A (en) * 2020-11-09 2021-03-12 唐山市德龙钢铁有限公司 Outer wall cooling device of high-speed wire slow cooling guide pipe

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102989794A (en) * 2012-11-28 2013-03-27 江苏永钢集团有限公司 Water-cooled shifting block device
CN112474835A (en) * 2020-11-09 2021-03-12 唐山市德龙钢铁有限公司 Outer wall cooling device of high-speed wire slow cooling guide pipe

Similar Documents

Publication Publication Date Title
CN202045436U (en) Thick plate narrow gap rotating arc welding machine
CN201950062U (en) Cool type drawing steel tube
CN202129599U (en) Rack transmission of pipe die dotting machine
CN201317787Y (en) High temperature material transporting auger
CN102554115B (en) Manufacturing method capable of reducing wire scraps and forged part forming machine for implementing method
CN202323101U (en) Water-cooling shaft capable of operating under high-temperature environment of vacuum equipment for long term
CN201196253Y (en) Main transmission mechanism of full electric servo ball screw type numerical control turret punch press
CN101424487A (en) High-temperature material handling spiral
CN103878416A (en) Cooling device for tool handle
CN201850286U (en) Quick replacing device for wire feeding pipe of wire feeder
CN203064623U (en) Coal drop pipe with wear-resistant high chromium lining boards
CN204565355U (en) A kind of combined type screw tap
CN201644281U (en) Spray printing head of continuously cast slab mark spraying machine
CN202786311U (en) Converter alloy feeding rotary device
CN218146760U (en) Light dual-drive feeding device of blast furnace tapping machine
CN207564001U (en) Applied to 500mm diameter cylinder inboard wall circumferential direction strip surfacing devices
CN201501918U (en) Cantilever roller way of steel billet heating furnace
CN208817979U (en) Top-blown spray gun and converting furnace with it
CN214392267U (en) Device for protecting slab driving roller
CN202322906U (en) Steel ladle bottom argon blowing gas supply device
CN216919314U (en) Iron notch opening machine provided with drill rod protection device
CN210438764U (en) Reaming bit for steel mill steel-making furnace
CN217001668U (en) Blast furnace cross drill bit based on manual electric arc welding
CN213559801U (en) Integrated slag discharging detection feeding device
CN2640660Y (en) Lead extracting appts. for lead smelting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110831

Termination date: 20161206

CF01 Termination of patent right due to non-payment of annual fee