CN201943611U - Device for collecting and releasing steel wire rope of workover rig - Google Patents

Device for collecting and releasing steel wire rope of workover rig Download PDF

Info

Publication number
CN201943611U
CN201943611U CN201120008303XU CN201120008303U CN201943611U CN 201943611 U CN201943611 U CN 201943611U CN 201120008303X U CN201120008303X U CN 201120008303XU CN 201120008303 U CN201120008303 U CN 201120008303U CN 201943611 U CN201943611 U CN 201943611U
Authority
CN
China
Prior art keywords
wire rope
roller seat
steel wire
bearing support
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201120008303XU
Other languages
Chinese (zh)
Inventor
刘鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201120008303XU priority Critical patent/CN201943611U/en
Application granted granted Critical
Publication of CN201943611U publication Critical patent/CN201943611U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

A device for collecting and releasing a steel wire rope of a workover rig comprises a first roller seat, a second roller seat, a first steel wire rope roller, a second steel wire rope roller and a steel wire rope, wherein the first roller seat is supported on a bearing seat by a vertical shaft through a bearing, and the upper end and the lower end of the vertical shaft are respectively and fixedly connected with an upper plate and a lower plate; the second roller seat is supported on the bearing seat by a revolving shaft through the bearing, and the upper end and the lower end of the revolving shaft are respectively and fixedly connected with a top plate and a bottom plate; the first steel wire rope roller and the second steel wire rope roller are respectively fixed on the first roller seat and the second roller seat; and two ends of the steel wire rope are respectively fixed on the first roller seat and the second roller seat and are respectively wound on the first steel wire rope roller and the second steel wire rope roller. When the steel wire rope on the second roller seat is stretched to rotate, the first roller seat is driven to rotate, so that the steel wire rope can be collected and released. With the device, the efficiency for measuring and cutting the steel wire rope is greatly improved, the consumption of labor and materials is reduced, the operation is simple, the assembly and the disassembly are simple, and the device is flexible and convenient.

Description

Workover rig wire rope draw off gear
Technical field
The utility model relates to rope rig, particularly relates to the workover rig wire rope draw off gear of oil well repairing operation.
Background technology
Since the appearance of oil field workover rig, solved the demand of oil well repairing operation substantially.The important component part of workover rig is hook block and wire rope, and the wire rope link seems particularly important.In the past in intercepting lay winding wire ropes process, mostly be to adopt manually-operated, as the time standby fork truck that intercepts wire rope is adjusted the position of wire rope drum, 2 people are put wire rope, 5 people drag and pull wire rope, 1 people measures length, need 8 people's complete operations, operate very loaded down with trivial details, when measuring steel wire rope length, wire rope can land unavoidably and be stained with sandy soil, will reduce its life-span like this when using wire rope, cylinder " disorder cable " phenomenon also can appear in the long-term wire rope that is stained with sandy soil that uses, and influences the workover rig operate as normal, inefficiency consumes a large amount of man power and materials.
The utility model content
The technical problems to be solved in the utility model provides a kind of saving human and material resources, improves rope service-life, is convenient to measuring steel wire rope length, loads and unloads simple and easy, flexible, simple to operate workover rig wire rope draw off gear.
The technical scheme that adopts is:
Workover rig wire rope draw off gear comprises first roller seat, second tin roller seat, first wire rope drum, second wire rope drum and wire rope.Described first roller seat is made up of vertical shaft, bearing support, upper plate, lower plate, base plate and bearing gland.Fixedly connected with lower plate in the bottom of bearing support, and by lower plate bearing support is fixed on the base plate, the bearings of vertical shaft by the bearing support upper and lower settings is on bearing support, and the upper plate suit also is fixed on the upper end of vertical shaft, bearing gland constitutes first roller seat by the lower end of screw at vertical shaft.Described second tin roller seat is made up of rotating shaft, bearing support, top board, base plate, base, positioning sleeve and location gland.Fixedly connected with base plate in the bottom of bearing support, and bearing support is fixed on the base by base plate, positioning sleeve is contained in the bearing support, rotating shaft is passed through the bearings of bearing support upper and lower settings on bearing support, top board is fixed on the upper end of rotating shaft, the location gland constitutes the second tin roller seat by the lower end of screw in rotating shaft.First wire rope drum and second wire rope drum are separately fixed on the top board of the upper plate of first roller seat and second tin roller seat, the two ends of wire rope are wrapped in respectively on first wire rope drum and second wire rope drum, stretch wire rope rotation on the second tin roller seat, drive first roller seat and rotate, realize wire rope folding and unfolding action.
The utility model has improved the efficient of intercepting wire rope greatly, and the scale error of having corrected wire rope plays the safeguard protection effect to wire rope, has saved manpower and has reduced material resources consumption again, and is simple to operate, loads and unloads simple and easy, flexible.
Description of drawings
Fig. 1 is the utility model fundamental diagram.
Fig. 2 is the first roller seat structural representation of the present utility model.
Fig. 3 is a second tin roller holder structure schematic diagram of the present utility model.
The specific embodiment
Workover rig wire rope draw off gear comprises first roller seat 1, second tin roller seat 2, first wire rope drum 3, second wire rope drum 4 and wire rope 7.Described first roller seat 1 is made up of vertical shaft 9, bearing support 8, upper plate 10, lower plate 11, base plate 5 and bearing gland 12.Fixedly connected with lower plate 11 in the bottom of bearing support 8, and bearing support 8 is fixed on the base plate 5 by lower plate 11, vertical shaft 9 passes through the bearings of bearing support 8 upper and lower settings on bearing support 8, upper plate 10 suits also are fixed on the upper end of vertical shaft 9, bearing gland 12 constitutes first roller seat 1 by the lower end of screw at vertical shaft 9.Described second tin roller seat 2 is made up of rotating shaft 14, bearing support 13, top board 15, base plate 17, base 6, positioning sleeve 16 and location gland 18.Fixedly connected with base plate 17 in the bottom of bearing support 13, and bearing support 13 is fixed on the base 6 by base plate 17, positioning sleeve 16 is contained in the bearing support 13, rotating shaft 14 is passed through the bearings of bearing support 13 upper and lower settings on bearing support 13, top board 15 is fixed on the upper end of rotating shaft 14, location gland 18 constitutes second tin roller seat 2 by the lower end of screw in rotating shaft 14.First wire rope drum 3 and second wire rope drum 4 are separately fixed on the top board 15 of the upper plate 10 of first roller seat 1 and second tin roller seat 2, the two ends of wire rope 7 are wrapped in respectively on first wire rope drum 3 and second wire rope drum 4, stretch wire rope rotation on the second tin roller seat 2, drive first roller seat 1 and rotate, realize wire rope 7 folding and unfoldings action.The rotating disk girth of the second tin roller seat 2 that this is routine is 2m, and changeing 10 circles is exactly 20m, and length controlled has made things convenient for measurement.

Claims (1)

1. workover rig wire rope draw off gear, comprise first roller seat (1), second tin roller seat (2), first wire rope drum (3), second wire rope drum (4) and wire rope (7), it is characterized in that described first roller seat (1) is by vertical shaft (9), bearing support (8), upper plate (10), lower plate (11), base plate (5) and bearing gland (12) are formed, fixedly connected with lower plate (11) in the bottom of bearing support (8), and bearing support (8) is fixed on the base plate (5) by lower plate (11), vertical shaft (9) passes through the bearings of bearing support (8) upper and lower settings on bearing support (8), upper plate (10) suit also is fixed on the upper end of vertical shaft (9), bearing gland (12) constitutes first roller seat (1) by the lower end of screw in vertical shaft (9); Described second tin roller seat (2), by rotating shaft (14), bearing support (13), top board (15), base plate (17), base (6), positioning sleeve (16) and location gland (18) are formed, fixedly connected with base plate (17) in the bottom of bearing support (13), and bearing support (13) is fixed on the base (6) by base plate (17), positioning sleeve (16) is contained in the bearing support (13), rotating shaft (14) is passed through the bearings of bearing support (13) upper and lower settings on bearing support (13), top board (15) is fixed on the upper end of rotating shaft (14), location gland (18) constitutes second tin roller seat (2) by the lower end of screw in rotating shaft (14); Described first wire rope drum (3) and second wire rope drum (4) are separately fixed on the top board (15) of the upper plate (10) of first roller seat (1) and second tin roller seat (2), and the two ends of wire rope (7) are wrapped in respectively on first wire rope drum (3) and second wire rope drum (4).
CN201120008303XU 2011-01-13 2011-01-13 Device for collecting and releasing steel wire rope of workover rig Expired - Fee Related CN201943611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201120008303XU CN201943611U (en) 2011-01-13 2011-01-13 Device for collecting and releasing steel wire rope of workover rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201120008303XU CN201943611U (en) 2011-01-13 2011-01-13 Device for collecting and releasing steel wire rope of workover rig

Publications (1)

Publication Number Publication Date
CN201943611U true CN201943611U (en) 2011-08-24

Family

ID=44470960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201120008303XU Expired - Fee Related CN201943611U (en) 2011-01-13 2011-01-13 Device for collecting and releasing steel wire rope of workover rig

Country Status (1)

Country Link
CN (1) CN201943611U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104310124A (en) * 2014-10-23 2015-01-28 北京海蓝科技开发有限责任公司 Rope winder, petroleum instrument fishing system and petroleum instrument lifting system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104310124A (en) * 2014-10-23 2015-01-28 北京海蓝科技开发有限责任公司 Rope winder, petroleum instrument fishing system and petroleum instrument lifting system
US10087054B2 (en) 2014-10-23 2018-10-02 Beijing Hailan Science & Technology Development Co., Ltd. Rope winder, petroleum instrument salvaging system and petroleum instrument hoisting system

Similar Documents

Publication Publication Date Title
CN204237493U (en) A kind of substation equipment maintenance Simple hanger
CN204085952U (en) Reservoir stratified pumping sampling device
CN206573987U (en) It is a kind of can stationary computer rotation bracket
CN201943611U (en) Device for collecting and releasing steel wire rope of workover rig
CN204549970U (en) Glass transportation fitting machine
CN207946242U (en) A kind of sampler for soil remediation detection
CN104554641B (en) A kind of fishing boat is fished for and is used hauling device
CN203050645U (en) Beam-pumping unit
CN208795530U (en) A kind of geologic prospect drawing out soil equipment
CN102992216A (en) Lifting device of submerged pump
CN205838451U (en) A kind of novel architecture lowering or hoisting gear
CN201443221U (en) Flag hoisting tool
CN205222544U (en) Electrodynamic type immersible pump hoisting device
CN203354356U (en) Horizontal sterilizer cover
CN204297784U (en) Electric wire copper wire payingoff mechanism
CN204682282U (en) A kind of transmission device of automation detecting and reporting pest information equipment
CN202963518U (en) Drilling equipment with counterweight
CN202562772U (en) Soil sampling device
CN205777552U (en) A kind of new concrete material distributing machine
CN206052706U (en) A kind of piling machine multi-functional control mechanism
CN206298197U (en) A kind of portable winding device
CN203994255U (en) Diesel powered stirs drags pump
CN202387299U (en) Cover plate connecting device of filter
CN217434644U (en) Material storage device is used in building engineering construction
CN203095464U (en) Submersible pump lifting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824

Termination date: 20150113

EXPY Termination of patent right or utility model