CN201935332U - Intelligent control device for group control of air conditioner indoor equipment - Google Patents

Intelligent control device for group control of air conditioner indoor equipment Download PDF

Info

Publication number
CN201935332U
CN201935332U CN2011200286316U CN201120028631U CN201935332U CN 201935332 U CN201935332 U CN 201935332U CN 2011200286316 U CN2011200286316 U CN 2011200286316U CN 201120028631 U CN201120028631 U CN 201120028631U CN 201935332 U CN201935332 U CN 201935332U
Authority
CN
China
Prior art keywords
equipment
computer
control
plc
signal output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011200286316U
Other languages
Chinese (zh)
Inventor
郁松涛
马宏权
李跃
罗磊
张志鹏
沈玲玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rich green construction group Limited
Original Assignee
NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd filed Critical NANJING FENGSHENG NEW ENERGY TECHNOLOGY Co Ltd
Priority to CN2011200286316U priority Critical patent/CN201935332U/en
Application granted granted Critical
Publication of CN201935332U publication Critical patent/CN201935332U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

The utility model discloses an intelligent control device for group control of air conditioner indoor equipment, which comprises a control main body which is a computer, equipment with communication protocols, switching value/digital signal equipment and analog signal equipment. The intelligent control device is characterized in that the device additionally comprises a programmable logic controller (PLC) module, the signal output ends of the switching value/digital signal equipment and the analog signal equipment are connected with the signal input end of the PLC module, the signal output end of the PLC module is connected to the control main body which is the computer, and the signal output end of the equipment with communication protocols is directly connected with the control main body which is the computer. Since the control main body is the computer, by virtue of the powerful computing and storage capacity of the computer, the precision of a control system can be effectively improved. The equipment with communication protocols directly communicates with the computer. Analog value signals and digital value signals communicate through the low-configuration PLC module and then communicate with a unit.

Description

Be applicable to the intelligence controlling device of equipment team control in the Air Conditioning Facilities
Technical field
The utility model relates to a kind of air-conditioning machine room device cluster control system, specifically is a kind of intelligence controlling device that is applicable to equipment team control in the Air Conditioning Facilities.
Background technology
The maximization of modern architecture thing, multifunction and intellectuality must cause the interior air-conditioning equipment of building of a great variety, the technical performance complexity, and the continuous increase of maintenance service maintenance project, management work is unartificial can be dealt with.Therefore, adopt Automatic monitoring systems technology and computer management to become the most important management means of modern architecture.
In the Air Conditioning Facilities intelligent cluster control system central air conditioning machine room a variety of equipment such as heat pump main frame, handpiece Water Chilling Units, water pump, motor-driven valve, sensor are arranged, the control system of Air Conditioning Facilities is generally with PLC to serve as the control main body, and computer only shows as auxiliary.Because communications protocol difference between the equipment needs to add gateway hardware, the communication between the realization equipment between equipment and the PLC.PLC calculating and ability to communicate are limited in traditional control system, how efficiently to utilize the communication of computer itself and computing capability to become one of means that improve air-conditioning system monitoring and control accuracy.
Summary of the invention
Technical problem to be solved in the utility model is at above-mentioned the deficiencies in the prior art, and a kind of raising control accuracy is provided, and reduces the intelligence controlling device that is applicable to equipment team control in the Air Conditioning Facilities of control device cost.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of intelligence controlling device that is applicable to equipment team control in the Air Conditioning Facilities, comprise the control host computer, the equipment of band communications protocol, switching value/digital signal equipment and analog signalling, it is characterized in that: also comprise a PLC module, the signal output part of described switching value/digital signal equipment and analog signalling is connected with the signal input part of described PLC module, the signal output part of PLC module is connected to described control host computer, and the device signal output of described band communications protocol directly is connected with described control host computer.
The equipment of described band communications protocol comprises electrical quantity instrument, source pump/single cooler group and frequency converter; Described switching value/digital signal equipment comprises blower fan of cooling tower, water pump and on-off valve; Described analog signalling comprises control valve, temperature sensor, pressure sensor and flow sensor.
Beneficial effect:
1) tradition control main body is PLC, and data-signal collection, data store, data computation is handled and all realized in PLC, and present technique invention control main body is a computer, by the powerful calculating and the storage capacity of computer, can effectively improve system's control accuracy.
2) for the equipment that has communications protocol, it carries one-chip computer module, and its function is consistent with PLC, and communicating by letter between legacy equipment and the PLC needs to adopt hardware gateway come conversion protocols.The same brand of same equipment can be with a gateway, and devices from different manufacturers agreement difference must be selected different gateways.Patent of the present invention adopts programming to realize the software gateway conversion protocols on computers, does not need hardware gateway, reduces the hardware gateway of band communications protocol equipment, does not need PLC, and direct and computer communication reduces investment.
3) for digital quantity signals such as water pump, on-off valves, analog signals such as pressure, temperature, flow need digital-to-analog amount I/O acquisition module.Integrated this module among the PLC.Because these equipment adopt a PLC with the band communications protocol in the conventional method.The PLC of present technique invention usefulness does not need communication protocol module, only with the PLC of digital-to-analog amount I/O acquisition module, has reduced the PLC configuration requirement, reduces investment.
4) use ethernet communication, realize software gateway.The software of independent research has been integrated Modbus RTU, Modbus ASCII, Modbus TCP, Profibus DP, MPI, communications protocol such as USS, TCP/IP
5) owing to having adopted computer to be the control main body, can be by calculating, the storage capacity of computer, software section has adopted the three-dimensional animation demonstration, MAYA2009, three-dimensional animation softwares such as 3DMAX, SQLserve2000 database, VC#2008 sets up module, the picture image.
Description of drawings
Fig. 1 Air Conditioning Facilities intelligence control system Fig. 2 is not with the PLC module of communication module.
The specific embodiment
As shown in Figure 1, Air Conditioning Facilities inner control object comprises source pump/single cooler group 1, electrical quantity instrument 2, frequency converter 3, water pump 4, blower fan of cooling tower 5, on-off valve 6, control valve 7, temperature sensor 8, pressure sensor 9, flow sensor 10 etc.According to the control method difference, these equipment are divided three classes: source pump/single cooler group 1, electrical quantity instrument 2, frequency converter 3 etc. are for carrying the analog signalling of communications protocol; Water pump 4, blower fan of cooling tower 5, on-off valve 6 etc. are digital signal equipment, and control valve 7, temperature sensor 8, pressure sensor 9, flow sensor 10 etc. are the analog signal control.
This control system only also comprises PLC device 11, personal computer 12 with digital-to-analog amount I/O acquisition module except the control object.Equipment such as source pump/single cooler group 1, electrical quantity instrument 2, frequency converter 3 directly link to each other with computer, realize communication with software gateway, the water pump 4 of switch numbers amount signal, blower fan of cooling tower 5, on-off valve 6, the PLC module 11 that the control valve 7 of analog signal, temperature sensor 8, pressure sensor 9, flow sensor 10 connect low configuration earlier is connected with computer 12 again.
Come into effect after the machine room common apparatus installs, the equipment of need such as source pump in the room system/single cooler group, water pump, cooling tower, control valve, on-off valve control has been reserved wiring.
Hardware devices such as sensor, frequency converter, electrical quantity instrument are installed; Understand the communications protocol of equipment such as main frame, frequency converter.
Equipment such as source pump/single cooler group 1, electrical quantity instrument 2, frequency converter 3 directly link to each other with computer, realize communication with software gateway, the water pump 4 of switch numbers amount signal, blower fan of cooling tower 5, on-off valve 6, the PLC module 11 that the control valve 7 of analog signal, temperature sensor 8, pressure sensor 9, flow sensor 10 connect low configuration earlier is connected with computer 12 again.
Computer communication exploitation, integration Modbus RTU, Modbus ASCII, Modbus TCP, Profibus DP, MPI, communications protocol such as USS, TCP/IP realize the communication of each equipment and computer.
Utilize 3D software development monitoring and self-control software model.
Set up platform with programming softwares such as VC# and realize 3d model, control program, monitor data shows, data are preserved integrated.

Claims (2)

1. intelligence controlling device that is applicable to equipment team control in the Air Conditioning Facilities, comprise control host computer (12), the equipment of band communications protocol, switching value/digital signal equipment and analog signalling, it is characterized in that: also comprise a PLC module, the signal output part of described switching value/digital signal equipment and analog signalling is connected with the signal input part of described PLC module, the signal output part of PLC module is connected to described control host computer (12), and the device signal output of described band communications protocol directly is connected with described control host computer (12).
2. the intelligence controlling device that is applicable to equipment team control in the Air Conditioning Facilities according to claim 1, it is characterized in that: the equipment of described band communications protocol comprises electrical quantity instrument, source pump/single cooler group and frequency converter; Described switching value/digital signal equipment comprises blower fan of cooling tower, water pump and on-off valve; Described analog signalling comprises control valve, temperature sensor, pressure sensor and flow sensor.
CN2011200286316U 2011-01-28 2011-01-28 Intelligent control device for group control of air conditioner indoor equipment Expired - Fee Related CN201935332U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200286316U CN201935332U (en) 2011-01-28 2011-01-28 Intelligent control device for group control of air conditioner indoor equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200286316U CN201935332U (en) 2011-01-28 2011-01-28 Intelligent control device for group control of air conditioner indoor equipment

Publications (1)

Publication Number Publication Date
CN201935332U true CN201935332U (en) 2011-08-17

Family

ID=44446850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200286316U Expired - Fee Related CN201935332U (en) 2011-01-28 2011-01-28 Intelligent control device for group control of air conditioner indoor equipment

Country Status (1)

Country Link
CN (1) CN201935332U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109708279A (en) * 2019-01-21 2019-05-03 珠海格力电器股份有限公司 Group control system and configuration method thereof
CN109838876A (en) * 2019-02-19 2019-06-04 陈娟 Central air-conditioning freezing computer room team control management system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109708279A (en) * 2019-01-21 2019-05-03 珠海格力电器股份有限公司 Group control system and configuration method thereof
CN109708279B (en) * 2019-01-21 2024-05-10 珠海格力电器股份有限公司 Group control system and configuration method thereof
CN109838876A (en) * 2019-02-19 2019-06-04 陈娟 Central air-conditioning freezing computer room team control management system
CN109838876B (en) * 2019-02-19 2022-03-08 陈娟 Group control management system for central air-conditioning refrigerating machine room

Similar Documents

Publication Publication Date Title
CN102072550A (en) Intelligent control device suitable for group control of equipment in air-conditioning machine room
CN104880994A (en) EtherCAT bus-based open-type numerical control system and the method
CN207148601U (en) A kind of industrial control unit (ICU) and system
CN201935332U (en) Intelligent control device for group control of air conditioner indoor equipment
CN204650244U (en) A kind of digital control system in open type based on EtherCAT bus
CN204101967U (en) A kind of network multifunctional data collector
CN207995122U (en) A kind of multi-protocols intelligent gateway based on narrowband Internet of Things
CN214069944U (en) Wisdom oil field edge calculates gateway communication unit
CN205745571U (en) Electromagnetism valve control system based on two-wire system
CN206411479U (en) A kind of intelligent controller for integrating control function and I/O functions
CN107508737A (en) Radio communication device and its communication means based on EtherCAT
CN210566570U (en) Integrated pneumatic actuator intelligent control system
CN207663257U (en) A kind of high-performance steam turbine adjusting control device
CN114019850A (en) Auxiliary equipment IO signal modular processing device of boats and ships
CN209657111U (en) A kind of pneumatics station data monitoring system based on wireless communication
CN204291043U (en) Multi-functional protocol conversion device
CN201837019U (en) Integrated controller of ceiling-mounted air-conditioner
CN206057894U (en) Air compressor machine complex control system
CN201269995Y (en) Communication management apparatus
CN106774081A (en) A kind of synthesis energy saving management system
CN202331862U (en) Novel central air conditioner teaching experimental device
CN205503628U (en) Pneumatic position servo controller based on DSP
CN216278614U (en) Controller special for energy-saving fan
CN213186143U (en) Industrial equipment gateway and air compression station room control system based on wireless communication
CN216670600U (en) Pre-drying room temperature and humidity control system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: FENGSHENG LVJIAN GROUP CO., LTD.

Free format text: FORMER OWNER: NANJING FENGSHENG NEW ENERGY TECHNOLOGY CO., LTD.

Effective date: 20150529

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210012 NANJING, JIANGSU PROVINCE TO: 210038 NANJING, JIANGSU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20150529

Address after: 210038 No. 8 Heng Fei Road, Nanjing economic and Technological Development Zone, Jiangsu, China

Patentee after: Rich green construction group Limited

Address before: 210012, 188 software Avenue, Yuhuatai District, Jiangsu, Nanjing

Patentee before: Nanjing Fengsheng New Energy Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110817

Termination date: 20180128