Clean flue device for flue gas desulfurization works Download PDF

Info

Publication number
CN201935204U
CN201935204U CN2011200466427U CN201120046642U CN201935204U CN 201935204 U CN201935204 U CN 201935204U CN 2011200466427 U CN2011200466427 U CN 2011200466427U CN 201120046642 U CN201120046642 U CN 201120046642U CN 201935204 U CN201935204 U CN 201935204U
Authority
CN
China
Prior art keywords
flue
clean
works
gas desulfurization
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011200466427U
Other languages
Chinese (zh)
Inventor
杨小刚
唐小健
崔社
王强
李斌
陈勇
秦福初
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CPI Yuanda Environmental Protection Engineering Co Ltd
Original Assignee
CPI Yuanda Environmental Protection Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CPI Yuanda Environmental Protection Engineering Co Ltd filed Critical CPI Yuanda Environmental Protection Engineering Co Ltd
Priority to CN2011200466427U priority Critical patent/CN201935204U/en
Application granted granted Critical
Publication of CN201935204U publication Critical patent/CN201935204U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a clean flue device for flue gas desulfurization works, which comprises a flue made of an FPR (fiber reinforced plastics) material; a smoke inlet of the flue is communicated with a smoke vent of a desulfurization tower; in the clean flue device for the flue gas desulfurization works, the flue made of the FPR material is highly anti-corrosive; no anti-corrosive material is required to be stuck in the flue; the flue has low cost and light weight; a span can reach 40m in the erecting works of the flue; therefore, many support devices and much civil engineering investment can be reduced.

Description

The clean flue device of flue-gas desulfurizing engineering
Technical field
The utility model relates to a kind of flue, the flue gas desulphurization flue that particularly a kind of corrosion resistance is strong.
Background technology
At present, the clean flue behind the known fume desulfurating absorption tower adopts carbon steel material, be corroded in order to prevent steel flue gas duct, inner anticorrosion process all be according to national regulation with scale or serve as a contrast nickelic plate and carry out preservative treatment.But in the prior art, according to panel method or serve as a contrast nickelic plate method to carry out preservative treatment all be to adopt the homogeneous antisepsis, inside, absorption tower antiseptic power everywhere all is identical.But, since the difference of the corrosion-resistant degree of the inner zones of different in absorption tower, the zonal corrosion degree height that has, the zonal corrosion degree that has is low, therefore, adopts the homogeneous corrosion protection design, all sites all must advance according to the easiest requirement for anticorrosion that is corroded the zone, and resource and cost are caused huge waste.And steel matter flue quality is big, and from great, so the flue span is little, and the backing material of employing is also more.So the clean flue cost of present known flue gas is higher.
Therefore need improve clean cigarette flue of the prior art, when making it have the good corrosion resistance advantage, have also that quality is little, span is big, support member is few, characteristics such as low cost of manufacture.
Summary of the invention
In view of this, the purpose of this utility model provides the clean flue device of a kind of flue-gas desulfurizing engineering, and characteristics such as it has good corrosion resistance, light weight, span is big, support member is few, low cost of manufacture have good practice and are worth.
The clean flue device of the utility model flue-gas desulfurizing engineering comprises the flue of being made by the FRP material, and described flue advances mouth and is communicated with the exhaust opening of desulfurizing tower.
Further, the span of described flue is 30~40m;
Further, described flue below is provided with support column, and described support column is one.
The beneficial effects of the utility model: the clean flue device of the utility model flue-gas desulfurizing engineering, the flue of being made by the FRP material has excellent corrosion resisting performance, need not in flue, to paste anti-corrosion material, the flue low cost, and flue light weight, set up the span that can reach 40m in the engineering at flue, thereby can reduce a large amount of bracing or strutting arrangements and civil engineering input.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further described.
Accompanying drawing is the clean flue device structural representation of the utility model flue-gas desulfurizing engineering.
The specific embodiment
Accompanying drawing is the clean flue device structural representation of the utility model flue-gas desulfurizing engineering.
As shown in the figure, the clean flue device of the utility model flue-gas desulfurizing engineering comprises the flue of being made by the FRP material 1, and described flue 1 advances mouth and is communicated with the exhaust opening of desulfurizing tower 2.The flue of being made by the FRP material itself has excellent corrosion resisting performance, need not to paste in flue anti-corrosion material, flue low cost, and flue light weight, and it is big to set up in the engineering span at flue, thereby can reduce a large amount of bracing or strutting arrangements and civil engineering input.
In the present embodiment: the span of described flue 1 is 40m, and the flue span is comparatively reasonable between 30~40m in concrete enforcement certainly, both can save a large amount of bracing or strutting arrangements and civil engineering input, can guarantee that again flue has enough intensity and steadiness.
In the present embodiment: described flue 1 below is provided with support column 3, and described support column 3 is one, support column is set can makes flue structure more firm, and reliability is higher, and support column quantity is few, the civil engineering less investment.
Explanation is at last, above embodiment is only unrestricted in order to the explanation the technical solution of the utility model, although the utility model is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement the technical solution of the utility model, and not breaking away from the aim and the scope of technical solutions of the utility model, it all should be encompassed in the middle of the claim scope of the present utility model.

Claims (3)

1. clean flue device of flue-gas desulfurizing engineering, it is characterized in that: comprise the flue of being made by the FRP material, described flue advances mouth and is communicated with the exhaust opening of desulfurizing tower.
2. the clean flue device of flue-gas desulfurizing engineering according to claim 1 is characterized in that: the span of described flue is 30~40m.
3. the clean flue device of flue-gas desulfurizing engineering according to claim 2 is characterized in that: described flue below is provided with support column, and described support column is one.
CN2011200466427U 2011-02-24 2011-02-24 Clean flue device for flue gas desulfurization works Expired - Lifetime CN201935204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011200466427U CN201935204U (en) 2011-02-24 2011-02-24 Clean flue device for flue gas desulfurization works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011200466427U CN201935204U (en) 2011-02-24 2011-02-24 Clean flue device for flue gas desulfurization works

Publications (1)

Publication Number Publication Date
CN201935204U true CN201935204U (en) 2011-08-17

Family

ID=44446722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011200466427U Expired - Lifetime CN201935204U (en) 2011-02-24 2011-02-24 Clean flue device for flue gas desulfurization works

Country Status (1)

Country Link
CN (1) CN201935204U (en)

Similar Documents

Publication Publication Date Title
CN201381670Y (en) Chimney adopting sectional glass reinforced plastic inner cylinder for exhausting low-temperature flue gas after wet desulfurization
CN102561787A (en) Anticorrosive composite chimney unit and chimney
CN205145961U (en) Take desulfurizing tower of rectification increase grid
CN201935204U (en) Clean flue device for flue gas desulfurization works
CN201666029U (en) Multitube bundling type ultrahigh glass fiber reinforced plastics chimney
CN201748457U (en) Chimney outlet condensed fluid collection drainage device
CN202581368U (en) Switching device for exhausting desulfurization flue gas
CN201772472U (en) Smoke wet desulphurization chimney
CN101893250A (en) Chimney for wet flue gas desulfurization
CN207413056U (en) A kind of fume dust remover
CN203777924U (en) Absorption tower wet chimney
CN205340570U (en) SOx/NOx control purifies exhaust apparatus
CN204841336U (en) Equipment is taken off to hydrogen sulfide essence in landfill gas
CN203971233U (en) A kind of fire-fighting spray device of protecting chimney internal cylinder
CN202017016U (en) Methane equipment
CN201216919Y (en) Fiberglass gas distributor used in column device
CN203147782U (en) Combined chimney capable of exhausting dry and wet smoke
CN203777930U (en) Novel system for improving desulfurization spray gun type oxidation air utilization rate
CN203721825U (en) Electric pile of flow battery and flow battery system with electric pile
CN210495813U (en) Double-tower double-circulation desulfurization device
CN202823160U (en) Spraying layer main pipe of wet process flue gas desulphurization absorption tower
CN202155144U (en) Outlet elbow pipe of slurry circulating pump
CN203494341U (en) Novel high-efficiency and energy-saving mining boiler desulfurization device
CN202377098U (en) Device for preventing loosening and breaking of electrode lead
CN207085650U (en) A kind of brick field desulphurization system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110817