CN201933497U - Solid tendon stop-grouting plug - Google Patents

Solid tendon stop-grouting plug Download PDF

Info

Publication number
CN201933497U
CN201933497U CN2010202242464U CN201020224246U CN201933497U CN 201933497 U CN201933497 U CN 201933497U CN 2010202242464 U CN2010202242464 U CN 2010202242464U CN 201020224246 U CN201020224246 U CN 201020224246U CN 201933497 U CN201933497 U CN 201933497U
Authority
CN
China
Prior art keywords
grouting plug
stop
hole
anchor
anchor hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202242464U
Other languages
Chinese (zh)
Inventor
陈佑新
付梅
刘辉
段英丽
薛立波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
Beijing Engineering Co Ltd of China Railway Urban Construction Group Co Ltd
China Railway Urban Construction Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN2010202242464U priority Critical patent/CN201933497U/en
Application granted granted Critical
Publication of CN201933497U publication Critical patent/CN201933497U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a solid tendon stop-grouting plug comprising a hard outer ring and a stop-grouting plug. The hard outer ring is made of galvanized iron material; the section of the outer ring is wedge-shaped zigzag-shaped; the section of the stop-grouting plug is wedge-shaped; and the stop-grouting plug is provided with an injected hole and a vent hole and is led into an anchor hole. The solid tendon stop-grouting plug solves the problems of leaking slurry, venting and fixing an anchor rod when injecting in the injected hole, ensures that the anchor hole is injected with the slurry fully, prevents the slurry from leaking, and has low manufacturing cost.

Description

Gu muscle stop grouting plug
Technical field
The utility model relates to a kind of solid muscle stop grouting plug, especially relates to the solid muscle stop grouting plug that a kind of alternative anchor pole stop grouting plug uses.
Background technology
Anchor pole stop grouting plug at present relatively more commonly used be a side shaft to cracking, the anchor pole stop grouting plug is sent into anchor hole, anchor pole stop grouting plug endoporus is subjected to can diminish after the anchor hole extruding, and then anchor pole is clamped.Simultaneously, anchor pole stop grouting plug pressurized tightens up back shutoff anchor hole external port.This anchor pole stop grouting plug deficiency is: the extruding by anchor hole can not make stop grouting plug that a side is cracked reach the effect in abundant closely knit anchor hole slit, when slip casting, can not avoid the generation of spillage phenomenon so fully, and above utility model can not effectively be discharged the continuous compressed gas in anchor hole depths when slip casting, causes slip casting not full inhomogeneous easily.
Summary of the invention
The fixing problem of spillage exhaust and anchor pole when the utility model solves anchor hole slip casting, the technical scheme that is adopted is: embed the elastic body that has injected hole and steam vent between hard outer shroud and anchor pole.The hard outer shroud is the galvanized iron material, outer shroud section wedgewise zigzag.Because the section wedgewise of stop grouting plug, so in the process of wedging anchor hole, the elastic body of stop grouting plug constantly tightens up, the anchor pole that is wrapped up by elastic body has been fixed in closely knit anchor hole slit simultaneously.What link to each other with steam vent in addition is one section tubule, through anchor hole deep end.In the process of slip casting, gas is gradually reduced like this, discharges from the pore of anchor hole deep end, and when slip casting was near completion, along with last gas is discharged anchor hole, anchor hole also slip casting was finished.
The beneficial effects of the utility model are: as long as will send into anchor hole with the anchor pole of stop grouting plug, by the injected hole slip casting in the elastic body, gas in the slip casting process in the anchor hole is discharged from steam vent, guaranteed that slip casting is full in the anchor hole, because elastomeric existence, also avoided the generation of spillage phenomenon, made it have the effect of fixing anchor bar concurrently owing to the outer shroud section is the wedge shape zigzag in addition.
Description of drawings
Fig. 1 is the plane of solid muscle stop grouting plug;
Fig. 2 is solid muscle stop grouting plug sectional drawing.
The specific embodiment
Figure DEST_PATH_GSB00000508669200021
Between hard outer shroud and anchor pole, embed the elastic body that has injected hole and steam vent.The hard outer shroud is the galvanized iron material, outer shroud section wedgewise zigzag.Because the section wedgewise of stop grouting plug, so in the process of wedging anchor hole, the elastic body of stop grouting plug constantly tightens up, the anchor pole that is wrapped up by elastic body has been fixed in closely knit anchor hole slit simultaneously.What link to each other with steam vent in addition is one section tubule, through anchor hole deep end.
During use, make a call to earlier the anchor hole of a diameter 60mm, the degree of depth is pressed design value.Then stop grouting plug is enclosed within the anchor pole end, notices in the process that the tubule that will link to each other with steam vent is fixed on the anchor pole.Then will be with the anchor pole wedging anchor hole of slurry plug sleeve.By the injected hole slip casting in the elastic body, compressed gas is drained by steam vent in the process of slip casting gradually in the anchor hole at last.

Claims (1)

1. a solid muscle stop grouting plug is characterized in that, be provided with injected hole and steam vent in the elastic body of parcel anchor pole, elastic body is outward that section is the jagged hard outer shroud of wedge shape in addition.
CN2010202242464U 2010-06-12 2010-06-12 Solid tendon stop-grouting plug Expired - Fee Related CN201933497U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202242464U CN201933497U (en) 2010-06-12 2010-06-12 Solid tendon stop-grouting plug

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202242464U CN201933497U (en) 2010-06-12 2010-06-12 Solid tendon stop-grouting plug

Publications (1)

Publication Number Publication Date
CN201933497U true CN201933497U (en) 2011-08-17

Family

ID=44445024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202242464U Expired - Fee Related CN201933497U (en) 2010-06-12 2010-06-12 Solid tendon stop-grouting plug

Country Status (1)

Country Link
CN (1) CN201933497U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953742A (en) * 2012-11-14 2013-03-06 山东大学 End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN103195061A (en) * 2013-04-07 2013-07-10 浙江华东建设工程有限公司 Multi-functional casing pipe part and anchor rod construction method using same
CN104164874A (en) * 2013-05-16 2014-11-26 建研地基云南有限公司 Expansive soil anchor rope stop-grouting plug, and anchor rope structure using same and construction method thereof
CN105544550A (en) * 2016-02-07 2016-05-04 北京市勘察设计研究院有限公司 Anti-gravity pressurizing grouting method using air bag plugging device
CN105696599A (en) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 Pressurizing grouting method utilizing air bag blockage device
CN109281695A (en) * 2018-12-03 2019-01-29 赵国柱 The hollow grouting anchor body of rod
CN109723481A (en) * 2019-01-08 2019-05-07 王康华 A kind of anchor rod pallet board and stop grouting plug integral structure

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953742A (en) * 2012-11-14 2013-03-06 山东大学 End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN102953742B (en) * 2012-11-14 2015-03-25 山东大学 End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN103195061A (en) * 2013-04-07 2013-07-10 浙江华东建设工程有限公司 Multi-functional casing pipe part and anchor rod construction method using same
CN103195061B (en) * 2013-04-07 2015-05-06 浙江华东建设工程有限公司 Multi-functional casing pipe part and anchor rod construction method using same
CN104164874A (en) * 2013-05-16 2014-11-26 建研地基云南有限公司 Expansive soil anchor rope stop-grouting plug, and anchor rope structure using same and construction method thereof
CN105696599A (en) * 2016-02-06 2016-06-22 北京市勘察设计研究院有限公司 Pressurizing grouting method utilizing air bag blockage device
CN105696599B (en) * 2016-02-06 2018-06-12 北京市勘察设计研究院有限公司 A kind of grouting under pressure method by using air bag plugging device
CN105544550A (en) * 2016-02-07 2016-05-04 北京市勘察设计研究院有限公司 Anti-gravity pressurizing grouting method using air bag plugging device
CN109281695A (en) * 2018-12-03 2019-01-29 赵国柱 The hollow grouting anchor body of rod
CN109281695B (en) * 2018-12-03 2024-05-31 赵国柱 Hollow grouting anchor rod body
CN109723481A (en) * 2019-01-08 2019-05-07 王康华 A kind of anchor rod pallet board and stop grouting plug integral structure
CN109723481B (en) * 2019-01-08 2020-08-14 湖北省鄂东南基础工程公司 Stock tray and end thick liquid stopper integral type structure

Similar Documents

Publication Publication Date Title
CN201933497U (en) Solid tendon stop-grouting plug
CN209642270U (en) A kind of novel power cable protection pipe
CN204308234U (en) A kind of internal expansion type fixture
CN202662899U (en) Mesh tail structure of electric wire
CN204826420U (en) Bury special construction tool of ground tackle deeply
CN204913239U (en) Hydraulic pressure pretightning force device
CN203585369U (en) Valve core sealing structure of angle seat valve
CN103015426B (en) Refined grouting bamboo pipe, and machining cutting ring for refined grouting bamboo pipe
CN204554130U (en) Compound anti-wear spigot and socket type steel pipe joint
CN201336450Y (en) Meshed tail end structure of power plug
CN204532393U (en) To the wooden stop grouting plug of long cable supporting grouting on a kind of
CN204805399U (en) High -temperature and corrosion resistance wave mode spring
CN203926270U (en) The mechanical anchor at a kind of end of autotomying
CN203395290U (en) Small-caliber counter weight type check valve
CN203498833U (en) Rotary jet grouting anchor rod body device
CN202391506U (en) Sealing device for air valve rod of natural gas engine
CN203081332U (en) Spiral sealing gasket
CN209164310U (en) A kind of wear-resistant long-life bolt of wheel
CN204312894U (en) Cubic hydraulic press oil-feed flange
CN201843207U (en) Water discharge pipe with prepared holes
CN201165690Y (en) Draining valve water stop lower cover structure
CN203395289U (en) Large-diameter heavy-hammer type check valve
CN204510245U (en) A kind of high-power blower single pile jacket structure
CN201580984U (en) Adsorption type portable oil pipe head
CN203309269U (en) By-pass structure in stop valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILW

Free format text: FORMER OWNER: BEIJING ENGINEERING COMPANY LIMITED OF CHINA RAILWAY URBAN CONSTRUCTION GROUP

Effective date: 20150417

C41 Transfer of patent application or patent right or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee after: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Patentee after: China Railway Urban Construction Group Beijing Engineering Co.,Ltd.

Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee before: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Patentee before: CHINA RAILWAY 16TH BUREAU GROUP BEIJING ENGINEERING Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20150417

Address after: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee after: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Patentee after: China Railway Urban Construction Group Beijing Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY URBAN CONSTRUCTION GROUP Co.,Ltd.

Address before: 100018 Beijing city Chaoyang District No. 2 North Pine dam Park

Patentee before: CHINA RAILWAY 16TH BUREAU GROUP Co.,Ltd.

Patentee before: China Railway Urban Construction Group Beijing Engineering Co.,Ltd.

DD01 Delivery of document by public notice

Addressee: Fu Mei

Document name: Notification of Passing Examination on Formalities

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110817

Termination date: 20180612

CF01 Termination of patent right due to non-payment of annual fee