CN201921631U - Flue gas-desulfurizing series tower treatment apparatus - Google Patents

Flue gas-desulfurizing series tower treatment apparatus Download PDF

Info

Publication number
CN201921631U
CN201921631U CN 201120011308 CN201120011308U CN201921631U CN 201921631 U CN201921631 U CN 201921631U CN 201120011308 CN201120011308 CN 201120011308 CN 201120011308 U CN201120011308 U CN 201120011308U CN 201921631 U CN201921631 U CN 201921631U
Authority
CN
China
Prior art keywords
housing
absorption tower
flue gas
flue
circulating pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120011308
Other languages
Chinese (zh)
Inventor
李建浏
陶爱平
金颖姗
沈煜晖
Original Assignee
China Huadian Engineering Group Co Ltd
Huadian Environmental Protection Engineering and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huadian Engineering Group Co Ltd, Huadian Environmental Protection Engineering and Technology Co Ltd filed Critical China Huadian Engineering Group Co Ltd
Priority to CN 201120011308 priority Critical patent/CN201921631U/en
Application granted granted Critical
Publication of CN201921631U publication Critical patent/CN201921631U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a flue gas-desulfurizing series tower treatment apparatus, which comprises an absorption tower A (1), an absorption tower B (2) and a flue gas pipeline (3), and the top of the absorption tower A (1) is connected with the middle of the absorption tower B (2) through the flue gas pipeline (3). The treatment apparatus can effectively remove the sulfur dioxide and the sulfur trioxide in flue gas, and moreover, the treatment apparatus has the advantages of simple equipment structure and low manufacturing cost, and is applicable to the desulfurization equipment alteration projects of power plants using high-sulfur coal.

Description

Flue gas desulfurization column in series treating apparatus
Technical field
The utility model relates to a kind of desulfurizing tower, particularly a kind of flue gas desulfurization column in series treating apparatus.
Background technology
At present, sulfur removal technology is a lot, and wherein the limestone-gypsum wet desulfurizing process has accounted for more than 80%.Power plant is equipped with desulfurizer at present, to satisfy environmental requirement.But because the actual coal-fired sulfur content of a lot of power plant is considerably beyond design load, and environmental emission standard will bring up to 200mg/Nm3 by 400mg/Nm3, and existing desulfurizer can not satisfy discharge standard, so need to transform.If with former be that desulfurizing tower is dismantled, build new desulfurizing tower, equipment such as the absorption tower in the so original desulfurizing tower, oxidation fan, circulating pump, agitator all can not utilize again.Therefore the cost of building new desulfurizing tower is very high.
The utility model content
The purpose of this utility model is, a kind of flue gas desulfurization column in series treating apparatus is provided, and it can effectively remove sulfur in smoke and sulfur trioxide, and it is simple to have a device structure, advantage of low manufacturing cost.
The technical solution of the utility model: a kind of flue gas desulfurization column in series treating apparatus, comprise A absorption tower, B absorption tower and flue, the top on A absorption tower is connected by the middle part of flue with the B absorption tower.In the desulphurization plant transformation project, use the mode of this double-column in series, the old absorption tower of both need not having dismantled, can simplify the internal structure on new absorption tower again, make the desulphurization plant transformation project not only save improvement cost but also made full use of old resource, and the flue gas after the improved equipment desulfurization can also reach national specified discharge standard.
In the aforesaid flue gas desulfurization column in series treating apparatus, the A absorption tower comprises housing one, smoke inlet one, exhanst gas outlet one, agitator one, oxidation fan one and circulating pump one, smoke inlet one is located at the middle part of housing one, top in the housing one is provided with spray equipment one, spray equipment one is connected by the end of circulating line one with the circulating pump one of being located at housing one bottom, the other end of circulating pump is connected by the liquid outlet one of pipeline with housing one bottom, the bottom of housing one also is provided with oxidation fan and agitator one, and exhanst gas outlet one is located at the top of housing one and is connected with flue.
In the aforesaid flue gas desulfurization column in series treating apparatus, the B absorption tower comprises housing two, smoke inlet two, exhanst gas outlet two, circulating pump two, agitator two, oxidation fan two and demister, smoke inlet two is located at the middle part of housing two and is connected with flue, circulating pump two, agitator two and oxidation fan two all are located at the bottom of housing two, one end of circulating pump two is connected with liquid outlet two on the housing two by pipeline, the other end is connected with the spray equipment two of housing two internal upper parts by circulating line two, exhanst gas outlet two is located at the top of housing two, is provided with demister between exhanst gas outlet two and the spray equipment two.The effect of demister is the SO that removes in the flue gas 3And droplet.
Compared with prior art, the utility model is cascaded two desulfurizing towers, reaches national specified discharge standard after making flue gas desulfurization.Particularly in the desulphurization plant transformation project of using sulphur coal power plant, original desulfurizing tower need not to dismantle, only needing that the preliminary treatment absorption tower of connecting is again transformed on former absorption tower a little gets final product, can either make flue gas after the processing reach discharge standard and can make full use of existing equipment again, save improvement cost.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Being labeled as in the accompanying drawing: 1-A absorption tower, 2-B absorption tower, 3-flue, 4-housing one, 5-smoke inlet one, 6-exhanst gas outlet one, 7-agitator one, 8-oxidation fan one, 9-circulating pump one, 10-spray equipment one, 11-circulating line one, 12-demister, 13-housing two, 14-smoke inlet two, 15-exhanst gas outlet two, 16-circulating pump two, 17-liquid outlet one, 18-circulating line two, 19-spray equipment two, 20-oxidation fan two, 21-agitator two, 22-liquid outlet two.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is further described.
Embodiment of the present utility model: a kind of flue gas desulfurization column in series treating apparatus, comprise A absorption tower 1, B absorption tower 2 and flue 3, the top on A absorption tower 1 is connected with the middle part on B absorption tower 2 by flue 3.A absorption tower 1 comprises housing 1, smoke inlet 1, exhanst gas outlet 1, agitator 1, oxidation fan 1 and circulating pump 1, smoke inlet 1 is located at the middle part of housing 1, top in the housing 1 is provided with spray equipment 1, spray equipment 1 is connected by the end of circulating line 1 with the circulating pump 1 of being located at housing one 4 bottoms, the other end of circulating pump 9 is connected by the liquid outlet 1 of pipeline with housing one 4 bottoms, the bottom of housing 1 also is provided with oxidation fan 8 and agitator 7, and exhanst gas outlet 1 is located at the top of housing 1 and is connected with flue 3.B absorption tower 2 comprises housing 2 13, smoke inlet 2 14, exhanst gas outlet 2 15, circulating pump 2 16, agitator 2 21, oxidation fan 2 20 and demister 12, smoke inlet 2 14 is located at the middle part of housing 2 13 and is connected with flue 3, circulating pump 2 16, agitator 2 21 and oxidation fan 2 20 all are located at the bottom of housing 2 13, one end of circulating pump 2 16 is connected with liquid outlet 2 22 on the housing 2 13 by pipeline, the other end is connected with the spray equipment 2 19 of housing 2 13 internal upper parts by circulating line 2 18, exhanst gas outlet 2 15 is located at the top of housing 2 13, is provided with demister 12 between exhanst gas outlet 2 15 and the spray equipment 2 19.
Operation principle: sulfur-containing smoke gas enters in the A absorption tower 1 by smoke inlet 1, the absorption liquid of 1 bottom, A absorption tower enters circulating line 1 by circulating pump 1, and ejection from the spray equipment 1 of housing one 4 internal upper parts on A absorption tower 1, the absorption liquid and the sulfur-containing smoke gas generation chemical reaction of ejection, most of sulfur dioxide in the flue gas and sulfur trioxide are removed, flue gas after the processing is discharged from exhanst gas outlet 1, and enter in the B absorption tower 2 along flue 3, the absorption liquid of 2 bottoms, B absorption tower enters circulating line 2 18 by circulating pump 2 16, and ejection from the spray equipment 2 19 on housing 2 13 tops, pretreated flue gas is carried out the secondary desulfurization, flue gas after the desulfurization enters the demister 12 at housing 2 13 tops, demister 12 is removed the droplet in remaining sulfur trioxide and the flue gas in the flue gas, discharges from exhanst gas outlet 2 15 at last.

Claims (3)

1. flue gas desulfurization column in series treating apparatus is characterized in that: comprise A absorption tower (1), B absorption tower (2) and flue (3), the top of A absorption tower (1) is connected with the middle part of B absorption tower (2) by flue (3).
2. flue gas desulfurization column in series treating apparatus according to claim 1, it is characterized in that: A absorption tower (1) comprises housing one (4), smoke inlet one (5), exhanst gas outlet one (6), agitator one (7), oxidation fan one (8) and circulating pump one (9), smoke inlet one (5) is located at the middle part of housing one (4), top in the housing one (4) is provided with spray equipment one (10), spray equipment one (10) is connected by the end of circulating line one (11) with the circulating pump one (9) of being located at housing one (4) bottom, the other end of circulating pump (9) is connected by the liquid outlet one (17) of pipeline with housing one (4) bottom, the bottom of housing one (4) also is provided with oxidation fan (8) and agitator one (7), and exhanst gas outlet one (6) is located at the top of housing one (4) and is connected with flue (3).
3. flue gas desulfurization column in series treating apparatus according to claim 1, it is characterized in that: B absorption tower (2) comprise housing two (13), smoke inlet two (14), exhanst gas outlet two (15), circulating pump two (16), agitator two (21), oxidation fan two (20) and demister (12), smoke inlet two (14) is located at the middle part of housing two (13) and is connected with flue (3), circulating pump two (16), agitator two (21) and oxidation fan two (20) all are located at the bottom of housing two (13), one end of circulating pump two (16) is connected with liquid outlet two (22) on the housing two (13) by pipeline, the other end is connected with the spray equipment two (19) of housing two (13) internal upper parts by circulating line two (18), exhanst gas outlet two (15) is located at the top of housing two (13), is provided with demister (12) between exhanst gas outlet two (15) and the spray equipment two (19).
CN 201120011308 2011-01-14 2011-01-14 Flue gas-desulfurizing series tower treatment apparatus Expired - Fee Related CN201921631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120011308 CN201921631U (en) 2011-01-14 2011-01-14 Flue gas-desulfurizing series tower treatment apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120011308 CN201921631U (en) 2011-01-14 2011-01-14 Flue gas-desulfurizing series tower treatment apparatus

Publications (1)

Publication Number Publication Date
CN201921631U true CN201921631U (en) 2011-08-10

Family

ID=44425503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120011308 Expired - Fee Related CN201921631U (en) 2011-01-14 2011-01-14 Flue gas-desulfurizing series tower treatment apparatus

Country Status (1)

Country Link
CN (1) CN201921631U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103623691A (en) * 2013-12-24 2014-03-12 营口东邦冶金设备耐材有限公司 Flue gas desulfurization device
CN103721555A (en) * 2013-12-24 2014-04-16 营口东邦冶金设备耐材有限公司 Combined flue gas desulfurization device
CN104353338A (en) * 2014-10-28 2015-02-18 南京大学(苏州)高新技术研究院 Cross flow-type desulfurization device
CN115400589A (en) * 2022-10-10 2022-11-29 安徽天诚环保机械有限公司 Boiler workshop is with smoke and dust treatment environmental protection equipment that has SOx/NOx control

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103623691A (en) * 2013-12-24 2014-03-12 营口东邦冶金设备耐材有限公司 Flue gas desulfurization device
CN103721555A (en) * 2013-12-24 2014-04-16 营口东邦冶金设备耐材有限公司 Combined flue gas desulfurization device
CN104353338A (en) * 2014-10-28 2015-02-18 南京大学(苏州)高新技术研究院 Cross flow-type desulfurization device
CN115400589A (en) * 2022-10-10 2022-11-29 安徽天诚环保机械有限公司 Boiler workshop is with smoke and dust treatment environmental protection equipment that has SOx/NOx control

Similar Documents

Publication Publication Date Title
CN201921631U (en) Flue gas-desulfurizing series tower treatment apparatus
CN103394274B (en) System device and method for carrying out combined denitrification, demercuration and desulfurization of flue gas
CN202881200U (en) Desulfurizing device for gas of finery
CN204502771U (en) Boiler smoke horizontal type level desulfurizing tower
CN204469492U (en) Industrial Boiler flue gas desulfurization dust arrester
CN101927125B (en) Dual-circulation absorption tower
CN202263522U (en) Flue gas desulfurization serial-column device
CN104383800A (en) Flue gas desulfurizing device
CN103285728B (en) Method and device for treating sulfur dioxide in sulfuric acid tail gas
CN102527183A (en) Desulfurization device special for oil burning boiler
CN202224053U (en) Cascade flow gas liquid separation device for eliminating desulfurized white smoke
CN202638262U (en) Twin-tower dual-cycle ammonia desulphurization-denitration device
CN203507812U (en) Single-tower double-medium desulfurizer
CN202666681U (en) Pretreatment device at inlet of flue gas desulfurization tower
CN202527058U (en) Demisting and desulfurizing tower
CN202224019U (en) Flue gas purification equipment
CN204485632U (en) A kind of emission-control equipment
CN105032161A (en) System for removing high-concentration sulfur dioxide in flue gas by means of cascading twin-tower wet method
CN203043825U (en) Wet process integration desulphurization and denitrification device
CN205007845U (en) Series connection double tower wet process desorption flue gas high concentration sulfur dioxide system
CN203990249U (en) High-efficiency desulfurization denitration compound dust-collection device
CN204619685U (en) A kind of injecting type membrane filtration fine de-sulfur equipment being applicable to refinery
CN203281197U (en) Flue gas purification device
CN204952654U (en) Connection structure of desulfurization absorption tower thick liquid spray piping and nozzle
CN203494369U (en) Device for preparing liquid sulfur dioxide by using sulfur dioxide flue gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100035, B, building 5, Huadian building, No. 273 Xizhimen Main Street, Beijing, Xicheng District

Patentee after: Huadian Environmental Protection System Engineering Co., Ltd.

Patentee after: CHINA HUADIAN ENGINEERING CO., LTD.

Address before: 100035, B, building 5, Huadian building, No. 273 Xizhimen Main Street, Beijing, Xicheng District

Patentee before: Huadian Environmental Protection System Engineering Co., Ltd.

Patentee before: China Huadian Engineering (Group) Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810

Termination date: 20200114