CN201916599U - Pipeline anchoring pipe stabilizing device - Google Patents

Pipeline anchoring pipe stabilizing device Download PDF

Info

Publication number
CN201916599U
CN201916599U CN2010206853363U CN201020685336U CN201916599U CN 201916599 U CN201916599 U CN 201916599U CN 2010206853363 U CN2010206853363 U CN 2010206853363U CN 201020685336 U CN201020685336 U CN 201020685336U CN 201916599 U CN201916599 U CN 201916599U
Authority
CN
China
Prior art keywords
extension rod
pipeline
anchor pole
fixing belt
importing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206853363U
Other languages
Chinese (zh)
Inventor
丁英利
张英奎
苏飞
杨新娜
李岩
曹永利
吴寅虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum Pipeline Engineering Corp
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN2010206853363U priority Critical patent/CN201916599U/en
Application granted granted Critical
Publication of CN201916599U publication Critical patent/CN201916599U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pipeline anchoring pipe stabilizing device, which is applied to pipe stabilization and buoyancy control of a long-distance pipeline in a water network marsh land and relates to the technical field of pipeline systems. The pipeline anchoring pipe stabilizing device is characterized in that: an extension rod (3) is a hollow rod; the joint between the extension rod (3) and a lead-in anchor rod (4) is provided with a screw thread; the lead-in anchor rod (4) is a hollow rod, and is provided with a plurality of small holes (10) for injecting cement paste; the periphery of the lead-in anchor rod is provided with a plurality of spiral disks (7); the upper part of the lead-in anchor rod (4) is provided with a screw thread; and an extension rod connecting piece (6) with an internal thread is in threaded fit with the screw thread and the end part of the extension rod (3), so that the extension rod (3) is connected with the lead-in anchor rod (4). The lead-in anchor rod (4) and the extension rod have high connecting intensity, the soft soil layer foundation of a water network region can be quickly reinforced by injection paste through the lead-in anchor rod, and the anchoring withdrawal resistance is enhanced.

Description

A kind of pipeline anchoring underwater pipeline stabilizing device
Technical field
The utility model is a kind of a kind of pipeline anchoring underwater pipeline stabilizing device that is used for swampy area, network of rivers long distance pipeline underwater pipeline stabilizing and buoyancy control, relates to the pipe-line system technical field.
Background technique
When long distance pipeline is constructed, often pass through the network of rivers, swampy area, this groundwater level height, easily buried pipeline is produced buoyancy, thereby cause pipeline unfixing, under this situation, move for a long time, can make the tired even distortion of pipeline, bring hidden danger for the pipeline security of operation.At present, long distance pipeline generally adopts counterweight type saddle weight or assembling type saddle weight at this regional underwater pipeline stabilizing and buoyancy controlling method, because the prefabricated cycle of saddle weight is long, transportation is difficult, mounting cost is high, often influences pipeline construction progress and project expense.
CN201041259Y discloses a kind of pipeline earth anchor of resisting the fixing tube of marsh dense waterway net region pipeline buoyancy, and many pipeline fixing belts laterally stride across the pipeline that places in the pipe trench, and the bail at every pipeline fixing belt two ends hangs over and imports the anchor pole upper end; Corresponding pipeline fixing belt, respectively there is one group of anchor on both sides; This anchor is that an extension rod or many extension rods being connected with each other are connected by the extension rod joint with the ground anchor head, and this technology can be effectively with the pipeline anchoring, but setting depth is big when construction and installation, and construction cost is high.
The model utility content
The purpose of this utility model is design swampy area, a kind of network of rivers long distance pipeline underwater pipeline stabilizing and the buoyancy control pipeline anchoring underwater pipeline stabilizing device that construction cost is low, withdrawal resistance is strong, anchoring is firm.
The formation of this anchoring underwater pipeline stabilizing device is seen Fig. 1-Fig. 4, and is the same with prior art, by import anchor pole 4, extension rod 3, pipeline fixing belt 5, fixing belt link 8, extension rod link 6, helical disk 7, sacrificial anode 1, location cover 2 and bolt 9 form.Many pipeline fixing belt 5 laterally strides across the pipeline 12 that places in the pipe trench 13, and the bail at every pipeline fixing belt 5 two ends hangs over and imports anchor pole 4 upper ends; Corresponding pipeline fixing belt 5, respectively there is one group of anchor on both sides, this anchor is an extension rod 3 or the many extension rods 3 that are connected with each other and import anchor pole 4 and be connected by extension rod link 6, the upper end of extension rod 3 is fixed with fixing belt link 8 on the lower side, the hook that hanging tube road fixing belt 5 is arranged on the fixing belt link 8, the upper tip of extension rod 3 cover 2 by the location that is threaded, and covers on 2 by the fixing sacrificial anode 1 of bolt 9 locating; After importing anchor pole 4 location, form slurry body 11 on every side.When reality is used, according to circumstances can increase extension rod 3 quantity and increase the anchor setting depth.Connection between the extension rod 3 also is with extension rod link 6.It is characterized in that extension rod 3 is hollow stem, screw thread is arranged with importing anchor pole 4 joints; Importing anchor pole 4 is hollow stem, is importing the aperture 10 that has a plurality of cement injections on the anchor pole 4, and the bar periphery has a plurality of helical disk 7 (see figure 2)s; Importing anchor pole 4 tops has screw thread, by the screw-thread fit of a female extension rod link 6 with this screw thread and extension rod 3 ends, extension rod 3 and importing anchor pole 4 is linked together; Helical disk 7 is the spiral ring of opening, and the collar extension two ends are welded on and import on the anchor pole 4.
Wherein:
The location is covered 2 and is the cap of inner bolt hole foreign side, and there are 2 fixedly screws of sacrificial anode 1 in the one outside;
Extension rod link 6 is female short tube;
Fixing belt link 8 is the pipe that a side has hook.
By import anchor pole 4 respectively slip casting be when setting depth meets the demands, adopt the method for high-pressure slip-casting around importing anchor pole 4, to form slurry body 11, in order to improve network of rivers areal geology situation, reinforced soil layer hardness, and then improve the withdrawal resistance that imports anchor pole 4, reach the effect of anchoring underwater pipeline stabilizing.
Importing anchor pole of the present utility model and extension rod join strength are strong, can reinforce dense waterway net region weak soil layer basis rapidly by importing bolt grouting, have increased the anchoring withdrawal resistance.
Description of drawings
Schematic representation after Fig. 1 anchoring underwater pipeline stabilizing Unit Installation is finished
Fig. 2 anchor pole precession scheme of installation
Fig. 3 imports and reaches connection diagram between the extension rod between anchor pole, the extension rod
Fig. 4 anchor pole end scheme of installation
Wherein: 1-sacrificial anode 2-locatees lid
3-extension rod 4-imports anchor pole
5-pipeline fixing belt 6-extension rod link
7-helical disk 8-fixing belt link
9-bolt 10-aperture
11-slurry body 12-pipeline
The 13-pipe trench
Embodiment
Embodiment. this example is an experimental setup and construction method, it constitutes as Fig. 1-shown in Figure 4, by import anchor pole 4, extension rod 3, pipeline fixing belt 5, fixing belt link 8, extension rod link 6, helical disk 7, sacrificial anode 1, locate cover 2 and bolt 9 form.Many pipeline fixing belt 5 laterally strides across the pipeline 12 that places in the pipe trench 13, and the bail at every pipeline fixing belt 5 two ends hangs over and imports anchor pole 4 upper ends; Corresponding pipeline fixing belt 5, respectively there is one group of anchor on both sides, this anchor is an extension rod 3 or the many extension rods 3 that are connected with each other and import anchor pole 4 and be connected by extension rod link 6, the upper end of extension rod 3 is fixed with fixing belt link 8 on the lower side, the hook that hanging tube road fixing belt 5 is arranged on the fixing belt link 8, the upper tip of extension rod 3 cover 2 by the location that is threaded, and covers on 2 by the fixing sacrificial anode 1 of bolt 9 locating; After importing anchor pole 4 location, form slurry body 11 on every side.
This routine extension rod 3 is a hollow stem, with importing anchor pole 4 joints screw thread is arranged; Importing anchor pole 4 is hollow stem, is importing the aperture 10 that has a plurality of cement injections on the anchor pole 4, and the bar periphery has a plurality of helical disk 7 (see figure 2)s; Importing anchor pole 4 tops has screw thread, by the screw-thread fit of a female extension rod link 6 with this screw thread and extension rod 3 ends, extension rod 3 and importing anchor pole 4 is linked together; Helical disk 7 is the spiral ring of opening, and the collar extension two ends are welded on and import on the anchor pole 4.
Wherein:
The location is covered 2 and is the cap of inner bolt hole foreign side, and there are 2 fixedly screws of sacrificial anode 1 in the one outside;
Extension rod link 6 is female short tube;
Fixing belt link 8 is the pipe that a side has hook.
Size according to different geological conditions and opposing buoyancy, anchoring underwater pipeline stabilizing device can select the hollow anchor bar of different-diameter and fixedly bringing of different size to mate, owing to when anchoring underwater pipeline stabilizing device is constructed, can implement the slip casting function, can improve weak soil layer geological state greatly, the weak soil layer is reinforced, help increasing anchor force more, also can reduce the setting depth of anchor pole simultaneously, reduce the cost and the construction cost of anchor.
Concrete size:
The location is covered 2 and is the cap of inner bolt hole foreign side, and there are 2 fixedly screws of sacrificial anode 1 in the one outside; Inner bolt hole is M48mm, and boundary dimension is 100 * 100 * 150mm;
Extension rod 3 is selected Ф 40mm, long 1000mm-3000mm steel pipe for use;
Import anchor pole 4 and select Ф 40mm, long 3000mm steel pipe for use; Evenly have 20 Ф 10mm apertures 10 on importing anchor pole 4, the bar periphery has 3 helical disk 7 (see figure 2)s; Importing anchor pole 4 tops has screw thread, by the screw-thread fit of a female extension rod link 6 with this screw thread and extension rod 3 ends, extension rod 3 and importing anchor pole 4 is linked together;
Extension rod link 6 is female Ф 40 * 200mm short tube;
Helical disk 7 is the spiral plate-like of opening, is that the steel plate of 12mm processes by thickness, and the helical disk internal orifice is welded on and imports on the anchor pole 4;
Fixing belt link 8 is the Ф 100mm in hole, a side, long 150mm steel part.
This example is through test, and anchoring underwater pipeline stabilizing installation weight is light, and construction and installation are simple, is convenient to operation; Construction equipment is few, only needs 1 excavator, 1 small-sized grouting pump and 1 tableland anchor fitting machine can finish construction; Can reinforce dense waterway net region weak soil layer basis rapidly by slip casting, increase the anchoring withdrawal resistance.

Claims (3)

1. a pipeline anchoring underwater pipeline stabilizing device comprises importing anchor pole (4), extension rod (3), pipeline fixing belt (5), fixing belt link (8), extension rod link (6), helical disk (7), sacrificial anode (1), location lid (2) and bolt (9); Many pipeline fixing belts (5) laterally stride across the pipeline (12) that places in the pipe trench (13), and the bail at every pipeline fixing belt (5) two ends hangs over extension rod (3) upper end; A corresponding pipeline fixing belt (5), respectively there is one group of anchor on both sides, this anchor is an extension rod (3) or the many extension rods (3) that are connected with each other and import anchor pole (4) and be connected by extension rod link (6), the upper end of extension rod (3) is fixed with fixing belt link (8) on the lower side, the hook that hanging tube road fixing belt (5) is arranged on the fixing belt link (8), the upper tip of extension rod (3) is by the location lid (2) that is threaded, and goes up by the fixing sacrificial anode (1) of bolt (9) at location lid (2); After importing anchor pole (4) location, form slurry body (11) on every side; It is characterized in that extension rod (3) is a hollow stem, screw thread is arranged with importing anchor pole (4) joint; Importing anchor pole (4) is hollow stem, is importing the aperture (10) that has a plurality of cement injections on the anchor pole (4), and the bar periphery has a plurality of helical disks (7); Importing anchor pole (4) top has screw thread, by the screw-thread fit of a female extension rod link (6) with this screw thread and extension rod (3) end, extension rod (3) and importing anchor pole (4) is linked together.
2. a kind of pipeline anchoring underwater pipeline stabilizing device according to claim 1 is characterized in that described helical disk (7) is the spiral ring of opening, and the collar extension two ends are welded on and import on the anchor pole (4).
3. a kind of pipeline anchoring underwater pipeline stabilizing device according to claim 1 is characterized in that described fixing belt link (8) is the pipe that a side has hook.
CN2010206853363U 2010-12-23 2010-12-23 Pipeline anchoring pipe stabilizing device Expired - Lifetime CN201916599U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206853363U CN201916599U (en) 2010-12-23 2010-12-23 Pipeline anchoring pipe stabilizing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206853363U CN201916599U (en) 2010-12-23 2010-12-23 Pipeline anchoring pipe stabilizing device

Publications (1)

Publication Number Publication Date
CN201916599U true CN201916599U (en) 2011-08-03

Family

ID=44416395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206853363U Expired - Lifetime CN201916599U (en) 2010-12-23 2010-12-23 Pipeline anchoring pipe stabilizing device

Country Status (1)

Country Link
CN (1) CN201916599U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103542173A (en) * 2012-07-12 2014-01-29 中国石油天然气集团公司 Pipeline ballast construction method
CN105065777A (en) * 2015-07-24 2015-11-18 天津大学 Anchoring plate type naked pipeline lateral displacement control device
CN107066688A (en) * 2017-02-26 2017-08-18 中国石油天然气集团公司 Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters
CN108662282A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Muddy ground conduit jacking and pipe jacking construction method
CN111622209A (en) * 2020-05-27 2020-09-04 中国一冶集团有限公司 Composite roadbed drainage pipe network anti-floating structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103542173A (en) * 2012-07-12 2014-01-29 中国石油天然气集团公司 Pipeline ballast construction method
CN105065777A (en) * 2015-07-24 2015-11-18 天津大学 Anchoring plate type naked pipeline lateral displacement control device
CN107066688A (en) * 2017-02-26 2017-08-18 中国石油天然气集团公司 Bore the anti-floating design methods of GFRP of quick-fried Tunnel Passing pipeline in a kind of waters
CN107066688B (en) * 2017-02-26 2020-07-10 中国石油天然气集团有限公司 GFRP anti-floating design method for water area drilling and blasting tunnel crossing pipeline
CN108662282A (en) * 2018-05-31 2018-10-16 成都金玉雄辉建筑工程有限公司 Muddy ground conduit jacking and pipe jacking construction method
CN111622209A (en) * 2020-05-27 2020-09-04 中国一冶集团有限公司 Composite roadbed drainage pipe network anti-floating structure

Similar Documents

Publication Publication Date Title
CN101122131B (en) Foundation pit supporting pile using pipe casting pile embedding in rock
CN201916599U (en) Pipeline anchoring pipe stabilizing device
CN103031839B (en) Construction method of hand-dug piles
CN202689031U (en) Deep foundation pit retaining and protecting retaining wall
CN201241335Y (en) Pile and post in one foundation structure of underground engineering
CN203034464U (en) Truss type foundation pit supporting structure
CN105350531A (en) Pipe pile-anchor rod composite foundation capable of bearing pulling and pressing bidirectional loads and construction technology
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN107964979A (en) A kind of transmission line of electricity combining structure assembled cushion cap anchor rod foundation
CN105714819A (en) Novel prestressed anchor cable outer anchor head multiple protection device and fixing method thereof
CN103343537A (en) Drilling machine of high-pressure rotary-spraying anchor rod and construction method of high-pressure rotary-spraying anchor rod
CN103938641A (en) Foundation construction technology of large-scale photovoltaic power station in desert
CN103397634A (en) Anchoring construction method for fastener steel tube pile cofferdam
CN103669383B (en) A kind of method of installation and leveling caisson on ground, seabed
CN108842792A (en) A kind of layering is interior to draw anchor pole and construction method with being lifted discharging type
CN203361150U (en) Composite anti-floating anchor pile
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN204298836U (en) A kind of pile film cofferdam skeleton structure
CN103924592B (en) A kind of pressure-type PHA anchor pole and construction method thereof
CN108221954B (en) Easy-to-detach prefabricated underground diaphragm wall, lifting appliance and construction method
JP2012167473A (en) Reinforcement structure and reinforcement method of columnar structure
CN204875851U (en) Underground structure's antidetonation reinforced structure
CN201738286U (en) Tetrapod pier type structure
CN205530250U (en) Novel outer anchor head multiple protection of prestressed anchorage cable device
CN103334445B (en) Spring mouth water sealing structure under geological conditions of moderately weathered rock and construction method of water sealing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170309

Address after: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee after: China National Petroleum Corporation

Patentee after: China Petroleum Pipeline Bureau Engineering Co., Ltd.

Address before: 100007 Beijing, Dongzhimen, North Street, No. 9, No.

Patentee before: China National Petroleum Corporation

Patentee before: China Petroleum and Natural Gas Pipeline Bureau

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20110803

CX01 Expiry of patent term