CN201915644U - Trowel - Google Patents
Trowel Download PDFInfo
- Publication number
- CN201915644U CN201915644U CN2010206888470U CN201020688847U CN201915644U CN 201915644 U CN201915644 U CN 201915644U CN 2010206888470 U CN2010206888470 U CN 2010206888470U CN 201020688847 U CN201020688847 U CN 201020688847U CN 201915644 U CN201915644 U CN 201915644U
- Authority
- CN
- China
- Prior art keywords
- handle
- trowel
- patter
- model
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a trowel, which comprises a handle (1) and a troweling plate (2) connected to one end of the handle (1). The other end of the handle (1) extends outwards linearly. The handle of the trowel extends outwards linearly so that the extremely long trowel can be manufactured conveniently, the troweling plate can extend to a further range, and the trowel can be used for leveling a large-area concrete part at a far distance, and can solve the problem that an existing trowel needs to be configured with a bridge frame when used for leveling a large-area concrete part at a far distance.
Description
Technical field
The utility model relates to a kind of trowel.
Background technology
Trowel is concreting when leveling instrument commonly used, a large amount of is applied to various construction occasions.
The handle of existing trowel is a bridge shape, the two ends of bridge shape handle all are fixed on the patter, such handle is convenient to grasping and is exerted all one's strength, but since handle can not make very big very long, be not easy to flatten large-area concrete, the leveling of the large area concrete of building simultaneously such as flooring concrete, pavement concrete etc.
So this trowel need increase crane span structure when flattening this concrete, the workman stands on the crane span structure, just can touch the place of large tracts of land concrete distance to be flattened, and need expend a large amount of extra manpower and materials like this.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of trowel that is used for flattening large area concrete.
For solving the problems of the technologies described above, according to an aspect of the present utility model, provide a kind of trowel, comprise handle and the patter that is connected handle one end, the other end of handle stretches out along straight line.
Further, the both sides of handle are provided with reinforced pole, and reinforced pole one end is fixed on the handle, and the other end is fixed on the patter.
Further, the tie point of handle and two reinforced poles and patter is triangularly arranged.
Further, two reinforced pole symmetry handles setting.
Further, handle is connected by screw with patter.
Further, handle is connected the middle part of patter.
Further, handle and patter are arranged vertically.
The utlity model has following beneficial effect:
Trowel of the present utility model comprises handle and is connected the patter of handle one end, the other end of handle stretches out along straight line, the handle linear extension of trowel can be made into very long easily, patter can reach farther scope, can be used for flattening the part of large area concrete distance, the part that can solve existing trowel leveling large area concrete distance has to dispose the problem of crane span structure.
Description of drawings
Accompanying drawing is used to provide further understanding of the present utility model, constitutes the application's a part, and illustrative examples of the present utility model and explanation thereof are used to explain the utility model, do not constitute improper qualification of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation according to trowel master apparent direction of the present utility model;
Fig. 2 is a structural representation of overlooking direction according to trowel of the present utility model.
The specific embodiment
Below in conjunction with accompanying drawing embodiment of the present utility model is elaborated, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
First kind of embodiment of the present utility model as shown in Figure 1, this trowel comprise handle 1 and are connected the patter 2 of handle 1 one ends that the other end of handle 1 stretches out along straight line.The handle 1 linear extension of trowel can be made into very long easily, patter 2 can reach farther scope, can be used for flattening the part of large area concrete distance, the part that can solve existing trowel leveling large area concrete distance has to dispose the problem of crane span structure.
Preferably, handle 1 is arranged vertically with patter 2.Such structure makes the people at the movement locus of better firmly controlling trowel with trowel when flattening concrete, improves the planeness of concrete integral body.
Preferably, the both sides of handle 1 are provided with reinforced pole 3, and reinforced pole 3 one ends are fixed on the handle 1, and the other end is fixed on the patter 2.Reinforced pole 3 is used for guaranteeing the rigidity of trowel, and patter 2 is indeformable when guaranteeing to flatten concrete.
As shown in Figure 2, handle 1 and two reinforced poles 3 are triangularly arranged with the tie point of patter 2.Such structure can better guarantee the rigidity of trowel, and patter 2 is indeformable when guaranteeing to flatten concrete.Preferably, two reinforced pole 3 symmetrical handles 1 are provided with.Being provided with like this can better guarantee patter 2 maintenance level in flattening course, improves the planeness of concrete integral body.Preferably, handle 1 and patter 2 are connected by screw.Such fixed form is firm and simple.Preferably, handle 1 is connected the middle part of patter 2.Being provided with like this can better guarantee patter 2 maintenance level in flattening course, improves the planeness of concrete integral body.
The above is a preferred embodiment of the present utility model only, is not limited to the utility model, and for a person skilled in the art, the utility model can have various changes and variation.All within spirit of the present utility model and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within the protection domain of the present utility model.
Claims (7)
1. trowel comprises handle (1) and is connected the patter (2) of described handle (1) one end, it is characterized in that the other end of described handle (1) stretches out along straight line.
2. trowel according to claim 1 is characterized in that, the both sides of described handle (1) are provided with reinforced pole (3), and described reinforced pole (3) one ends are fixed on the described handle (1), and the other end is fixed on the described patter (2).
3. trowel according to claim 4 is characterized in that, the tie point of described handle (1) and described two reinforced poles and described patter (2) is triangularly arranged.
4. trowel according to claim 2 is characterized in that, the symmetrical described handles of described two reinforced poles (3) (1) are provided with.
5. trowel according to claim 1 is characterized in that, described handle (1) is connected by screw with described patter (2).
6. trowel according to claim 1 is characterized in that, described handle (1) is connected the middle part of described patter (2).
7. trowel according to claim 1 is characterized in that, described handle (1) is arranged vertically with described patter (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206888470U CN201915644U (en) | 2010-12-29 | 2010-12-29 | Trowel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010206888470U CN201915644U (en) | 2010-12-29 | 2010-12-29 | Trowel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201915644U true CN201915644U (en) | 2011-08-03 |
Family
ID=44415447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010206888470U Expired - Fee Related CN201915644U (en) | 2010-12-29 | 2010-12-29 | Trowel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201915644U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835912A (en) * | 2015-04-22 | 2017-06-13 | 袁红 | Muddy water for building starches screeding device |
-
2010
- 2010-12-29 CN CN2010206888470U patent/CN201915644U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835912A (en) * | 2015-04-22 | 2017-06-13 | 袁红 | Muddy water for building starches screeding device |
CN106835912B (en) * | 2015-04-22 | 2019-08-16 | 倡创(上海)咨询管理事务所 | Muddy water for building starches screeding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204609344U (en) | A kind of easy construction crack repairing structure fast | |
CN201915644U (en) | Trowel | |
CN203229044U (en) | Support frame for construction site | |
CN202787307U (en) | Foundation bolt positioning template | |
CN204551172U (en) | A kind of prefabricated road surface of assembled steel reinforced concrete hollow | |
CN204643651U (en) | A kind of construction-site crane | |
CN203654533U (en) | Connecting device of unit curtain walls | |
CN202280216U (en) | Reinforced concrete stair step corner protection device | |
CN202787910U (en) | Plate-type plaster hawk | |
CN205348714U (en) | Fillet outside -corner trowel of adjustable radian | |
CN205637501U (en) | Can carry out plastering unit that plasters with wall keeping parallelism | |
CN203603470U (en) | Special tool for reinforcing independent concrete beam plate formwork | |
CN209760877U (en) | Building wall reinforcing and supporting structure | |
CN204048796U (en) | A kind of work high above the ground stool being applicable to steel pipe pole | |
CN207761261U (en) | A kind of light instrument reinforced for packaged type door frame supporting leg | |
CN202401750U (en) | Building template | |
CN202299145U (en) | Concrete simulated glass fiber reinforced plastic pad | |
CN203961278U (en) | Building operations roof beam structure | |
CN202248774U (en) | Fixing device for waterstone dividing strip | |
CN204040461U (en) | A kind of MST wall construction part | |
CN203270857U (en) | Brick wall and color plate system for steel structure | |
CN202826020U (en) | Steel molding plate of novel special road surface precasting plate | |
CN204517340U (en) | A kind of construction site wire passing device | |
CN203654759U (en) | Film laying device | |
CN204475809U (en) | A kind of laying ceramic tile screeder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110803 Termination date: 20151229 |
|
EXPY | Termination of patent right or utility model |