CN201913611U - Lifting beam chord assembling tool - Google Patents

Lifting beam chord assembling tool Download PDF

Info

Publication number
CN201913611U
CN201913611U CN 201120101179 CN201120101179U CN201913611U CN 201913611 U CN201913611 U CN 201913611U CN 201120101179 CN201120101179 CN 201120101179 CN 201120101179 U CN201120101179 U CN 201120101179U CN 201913611 U CN201913611 U CN 201913611U
Authority
CN
China
Prior art keywords
workbench
boom
chord
top boom
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201120101179
Other languages
Chinese (zh)
Inventor
张春
黄伟
刘敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Engineering Industry Co Ltd
Original Assignee
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Engineering Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Engineering Industry Co Ltd filed Critical Chongqing Construction Engineering Group Co Ltd
Priority to CN 201120101179 priority Critical patent/CN201913611U/en
Application granted granted Critical
Publication of CN201913611U publication Critical patent/CN201913611U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a lifting beam chord assembling tool which belongs to the technical field of workpiece clamping and comprises a top chord tool and a bottom chord tool. The top chord tool comprises a top chord workbench; the top chord workbench is supported through an underframe; a bracket, a single top chord connector and a double top chord connector are arranged on the upper surface of the top chord workbench; the distance between the double top chord connector and the single top chord connector is matched with the length of a top chord; and the hoisting point connector is further arranged on the side surface of the top chord workbench in the position corresponding to a top chord hoisting point. The bottom chord rod tool comprises a bottom chord rod workbench; the bottom chord rod workbench is supported through an underframe; a plurality of bottom chord connector are arranged on the upper surface of the bottom chord workbench; and the distance between every two adjacent bottom chord connectors is matched with the length of a bottom chord. The lifting beam chord assembling tool has the advantages as follows: the interchangeability is good, the lifting beam chord assembling tool is suitable for volume production, material waste and manufacturing cost are reduced, and the space is saved.

Description

Crane arm chord member assembled tool
Technical field
The utility model belongs to the technical field of piece-holder, relates in particular to a kind of crane arm chord member assembled tool.
Background technology
Crane arm is the main components and the stressed member of tower crane, wherein, crane arm is connected to form successively by a plurality of single-unit crane arms, each single-unit crane arm all comprises a top boom and two lower booms, top boom adopts the ears plate to cooperate, and fix by bearing pin, lower boom adopts the monaural plate to cooperate, and also is to fix by bearing pin.What present chord member adopted is to join the formula frock, can only guarantee the accurate location of single-unit crane arm one end, and the other end can only cooperate making, causes product not have interchangeability, is inconvenient to deliver and keep in repair, and efficient is on the low side, can not volume production; All can there be the tower crane of different model in each company at present, the specification of the upper and lower chord member of crane arm will be different, the frock that the upper and lower chord member of crane arm is adopted is also just different, need a plurality of frocks just can meet the demands, caused the waste of material, not only increase manufacturing cost, also taken a large amount of spaces.
The utility model content
The technical problems to be solved in the utility model provides the crane arm chord member assembled tool of a kind of suitable different model top boom and lower boom.
In order to solve the problems of the technologies described above, the utility model provides following technical scheme: a kind of crane arm chord member assembled tool, comprise top boom frock and lower boom frock, described top boom frock comprises the top boom workbench, described top boom workbench supports by underframe, the upper surface of top boom workbench is provided with carriage, single top boom joint and two top boom joint, wherein, distance between two top boom joints and the single top boom joint is complementary with the length of top boom, and the position of the corresponding top boom suspension centre in the side of described top boom workbench also is provided with the suspension centre joint; Described lower boom frock comprises the lower boom workbench, and described lower boom workbench supports by underframe, and the upper surface of lower boom workbench is provided with a plurality of lower boom joints, and wherein, the distance between two lower boom joints is complementary with the length of lower boom.
Further, in order rationally to utilize the space of top boom workbench, an end of described top boom workbench is provided with single top boom joint.
Further, in order rationally to utilize the space of lower boom workbench, an end of described lower boom workbench is provided with the lower boom joint.
Further, install for convenience and maintenance, the connected mode of the described pair of top boom joint and top boom workbench, lower boom joint and lower boom workbench is flexible connection.
Compared with prior art, advantage of the present utility model is: 1, the ears board component is fixed by single top boom joint and two top boom joint, the monaural board component is fixed by the lower boom joint, the suspension centre otic placode is fixed by the suspension centre joint, make accurate positioning, guaranteed the tolerance of product, interchangeability is good, is suitable for volume production.2, be suitable for different model top boom and lower boom, do not need a plurality of frocks, reduced the waste and the manufacturing cost of material, also saved a large amount of spaces.
Description of drawings
Below in conjunction with drawings and Examples technical solutions of the utility model are further specified:
Fig. 1 is the structural representation of a kind of embodiment of the utility model crane arm chord member assembled tool top boom frock;
Fig. 2 is the profile of a kind of embodiment of the utility model crane arm chord member assembled tool list top boom joint;
Fig. 3 is the profile of the two a kind of embodiment of top boom joint of the utility model crane arm chord member assembled tool;
Fig. 4 is the profile of a kind of embodiment of the utility model crane arm chord member assembled tool suspension centre joint;
Fig. 5 is the structural representation of a kind of embodiment of the utility model crane arm chord member assembled tool lower boom frock;
The specific embodiment
As Fig. 1, Fig. 2, Fig. 3, Fig. 4 and shown in Figure 5, a kind of crane arm chord member of the utility model assembled tool, comprise top boom frock and lower boom frock, described top boom frock comprises top boom workbench 1, described top boom workbench 1 supports by underframe, the upper surface of top boom workbench 1 is provided with carriage, single top boom joint 2 and two top boom joint 3, wherein, distance between two top boom joints 3 and the single top boom joint 2 is complementary with the length of top boom, and the position of the corresponding top boom suspension centre in the two sides of described top boom workbench 1 also is provided with suspension centre joint 4; Described lower boom frock comprises lower boom workbench 5, and described lower boom workbench 5 supports by underframe, and the upper surface of lower boom workbench 5 is provided with a plurality of lower boom joints 6, and wherein, the distance between two lower boom joints 6 is complementary with the length of lower boom.
In the present embodiment, in order rationally to utilize the space of top boom workbench 1, an end of described top boom workbench 1 is provided with single top boom joint 2.In order rationally to utilize the space of lower boom workbench, an end of described lower boom workbench 5 is provided with lower boom joint 6.Install for convenience and maintenance, described pair of top boom joint 3 is flexible connection with top boom workbench 1, lower boom joint 6 with the connected mode of lower boom workbench 5.
When carrying out the top boom assembling, top boom and ears board component are placed on the top boom workbench 1, install the single top boom joint 2 and the two top boom joint 3 that are complementary with top boom length, and the ears board component packed in the through hole of corresponding single top boom joint 2 and two top boom joints 3, and fix by bearing pin, again the suspension centre otic placode is passed suspension centre joint 4 through holes, fix, at last ears board component and suspension centre otic placode are welded on the top boom by bearing pin.
When carrying out the lower boom assembling, lower boom and monaural board component are placed on the lower boom workbench 5, install the lower boom joint 6 that is complementary with lower boom length, and the monaural board component packed in the through hole of corresponding lower boom joint 6, and fix by bearing pin, at last the monaural board component is welded on the lower boom.
For a person skilled in the art; under the prerequisite that does not break away from the utility model structure; can also make some distortion and improvement, these also should be considered as protection domain of the present utility model, and these can not influence effect and practical applicability that the utility model is implemented.

Claims (4)

1. a crane arm chord member assembled tool comprises top boom frock and lower boom frock, it is characterized in that:
Described top boom frock comprises the top boom workbench, described top boom workbench supports by underframe, the upper surface of top boom workbench is provided with carriage, single top boom joint and two top boom joint, wherein, distance between two top boom joints and the single top boom joint is complementary with the length of top boom, and the position of the corresponding top boom suspension centre in the side of described top boom workbench also is provided with the suspension centre joint;
Described lower boom frock comprises the lower boom workbench, and described lower boom workbench supports by underframe, and the upper surface of lower boom workbench is provided with a plurality of lower boom joints, and wherein, the distance between two lower boom joints is complementary with the length of lower boom.
2. crane arm chord member assembled tool as claimed in claim 1 is characterized in that: an end of described top boom workbench is provided with single top boom joint.
3. crane arm chord member assembled tool as claimed in claim 1 is characterized in that: an end of described lower boom workbench is provided with the lower boom joint.
4. crane arm chord member assembled tool as claimed in claim 1 is characterized in that: the connected mode of the described pair of top boom joint and top boom workbench, lower boom joint and lower boom workbench is flexible connection.
CN 201120101179 2011-04-08 2011-04-08 Lifting beam chord assembling tool Expired - Fee Related CN201913611U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201120101179 CN201913611U (en) 2011-04-08 2011-04-08 Lifting beam chord assembling tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201120101179 CN201913611U (en) 2011-04-08 2011-04-08 Lifting beam chord assembling tool

Publications (1)

Publication Number Publication Date
CN201913611U true CN201913611U (en) 2011-08-03

Family

ID=44413426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201120101179 Expired - Fee Related CN201913611U (en) 2011-04-08 2011-04-08 Lifting beam chord assembling tool

Country Status (1)

Country Link
CN (1) CN201913611U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103071958A (en) * 2013-01-23 2013-05-01 中联重科股份有限公司 Welding fixture for upper chord and bi-lug plate of cargo boom and single-section molding method for cargo boom
CN108857290A (en) * 2018-08-23 2018-11-23 浙江中建路桥设备有限公司 A kind of production method of Bridge Erector nose girder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103071958A (en) * 2013-01-23 2013-05-01 中联重科股份有限公司 Welding fixture for upper chord and bi-lug plate of cargo boom and single-section molding method for cargo boom
CN108857290A (en) * 2018-08-23 2018-11-23 浙江中建路桥设备有限公司 A kind of production method of Bridge Erector nose girder
CN108857290B (en) * 2018-08-23 2020-06-19 浙江中建路桥设备有限公司 Production method of bridge girder erection machine guide beam

Similar Documents

Publication Publication Date Title
CN201913611U (en) Lifting beam chord assembling tool
CN202726365U (en) Connecting lug installing and welding device for rack section of derrick
CN202245671U (en) Lifting cross beam of evaporator component
CN202447841U (en) Tool for fixing winch connecting plates for marine crane
CN202577688U (en) Articulated cross beam-free metal plate curtain wall
CN201628054U (en) Base-type mounting structure for electrical apparatus of dredger
CN203640058U (en) Steel structure connecting piece
CN203740791U (en) Elevator speed limiter connecting support
CN203440744U (en) Truss of detachable steel bridge
CN204988489U (en) Bridge overlap joint formula reinforced concrete weighing platform
CN202571684U (en) Integral welding tool for tower crane trolleys
CN204125043U (en) A kind of mono beam overhead crane girder and end carriage connecting device
CN203696564U (en) Piece push device for hinge piece inlaying machine
CN202357908U (en) Hanging post device for in-tunnel contact system
CN203319582U (en) Platform structure of tower crane
CN202193541U (en) Main gantry structure of crane
CN202271550U (en) Upper beam reinforcing mechanism for crane beam
CN204917676U (en) End beam connection structure for hoist
CN202465913U (en) Reinforced cathode plate for wet metallurgy
CN201714312U (en) Drilling rig derrick
CN201744935U (en) Assembly tool for knuckle arm of tower crane boom
CN202913710U (en) Quick-assembling mould for workshop steel structure roof truss
CN202658637U (en) Land leveller front frame with assembly platform
CN202785482U (en) Supporting arm connecting structure on double-column lifting equipment
CN204823737U (en) Bridge crane girder and end beam connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110803

Termination date: 20160408

CF01 Termination of patent right due to non-payment of annual fee