CN201898371U - Intelligent power distribution switch - Google Patents

Intelligent power distribution switch Download PDF

Info

Publication number
CN201898371U
CN201898371U CN2010206679757U CN201020667975U CN201898371U CN 201898371 U CN201898371 U CN 201898371U CN 2010206679757 U CN2010206679757 U CN 2010206679757U CN 201020667975 U CN201020667975 U CN 201020667975U CN 201898371 U CN201898371 U CN 201898371U
Authority
CN
China
Prior art keywords
electronic switch
switch
user
energy
power distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206679757U
Other languages
Chinese (zh)
Inventor
郭鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Clou Electronics Co Ltd
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN2010206679757U priority Critical patent/CN201898371U/en
Application granted granted Critical
Publication of CN201898371U publication Critical patent/CN201898371U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The utility model discloses an intelligent power distribution switch. The intelligent power distribution switch comprises a first electronic switch, a second electronic switch, a third electronic switch and an intelligent controller, wherein one end of the first electronic switch is connected with a mains supply, and the other end of the first electronic switch is connected with a user; one end of the second electronic switch is connected with a photovoltaic module or a photovoltaic device, and the other end of the second electronic switch is connected with the user; one end of the third electronic switch is connected with an energy storage battery, and the other end of the third electronic switch is connected with the user; and the intelligent controller controls the work of the first electronic switch, the second electronic switch and the third electronic switch. In the intelligent power distribution switch, normal power consumption of the user is not interfered after the photovoltaic and the energy storage battery are connected, and the aims of saving energy and bringing convenience to the power consumption of the user are fulfilled.

Description

A kind of intelligent power distribution switch
Technical field
The utility model relates to panel switches.
Background technology
In present most electricity consumption; only be electrically connected by distribution box or block terminal with the city; and in electricity consumption; the electricity charge can appear usually cheap the time and the electricity charge expensive the time; be referred to as the paddy electricity price when electricity charge are cheap; be referred to as the peak electricity price when electricity charge are expensive; when the paddy electricity price; understand some electric weight to too many or too much for use and cause waste, and when the peak electricity price, then electric weight is under-supply; therefore; caused great inconvenience for user's use, in order to overcome the contradiction of above-mentioned paddy electricity price and peak electricity price, people use photovoltaic and to user's power supply or when the paddy electricity price electric weight are stored; Deng when peak electricity price or dispatch from foreign news agency are stopped power supply; electric weight in the energy storage device is discharged, still, be with above-mentioned civil power; photovoltaic and energy storage device organically couple together; and the work relationship between the better controlled three; depend the requirement that distribution box or block terminal can't reach use alone, therefore, invent a kind of novel panel switches and necessitate.
Summary of the invention
The purpose of this utility model provides a kind of intelligent power distribution switch, and technical problem to be solved is the not normal electricity consumption of interference user after inserting photovoltaic and energy-storage battery, and can reach energy-conservation and make things convenient for the purpose of user power utilization.
For achieving the above object, a kind of intelligent power distribution switch comprises first electronic switch, second electronic switch, the 3rd electronic switch and intelligent controller; One end of described first electronic switch is electrically connected with the city, and the other end is connected with the user; One end of described second electronic switch is connected with photovoltaic, and the other end is connected with the user; One end of described the 3rd electronic switch is connected with energy-storage battery, and the other end is connected with the user; Described intelligent controller is controlled the work of first electronic switch, second electronic switch and the 3rd electronic switch.
As improvement, be in series with first current transformer between first electronic switch and the user; Be in series with second current transformer between second electronic switch and the user; Be in series with the 3rd current transformer between the 3rd electronic switch and the user.
As improvement, be in series with first air switch between described first current transformer and the user; Be in series with second air switch between second current transformer and the user; Be in series with the 3rd air switch between the 3rd current transformer and the user; Described intelligent controller is controlled the work of first air switch, second air switch and the 3rd air switch.
As improvement, be in series with the primary air switch between the civil power and first electronic switch; The work of described intelligent controller control primary air switch.
The beneficial effects of the utility model are: (1) is because intelligent controller is controlled first electronic switch, the work of second electronic switch and the 3rd electronic switch, and intelligent controller can manually be set the point of electricity consumption electricity price, the peak, flat, the paddy period, detect civil power, the electric current of photovoltaic or energy-storage battery, and calculating actual load, principle according to reliable power supply and economic electricity consumption, automatically determine when energy storage, inversion or use civil power, like this, when the time, the user had load by day, by preferential second electronic switch of connecting of the control of intelligent controller, when electric energy can not satisfy the load needs, connect the 3rd electronic switch by energy-storage battery power supply or connect first electronic switch by mains-supplied, when the user is zero load, then connects the 3rd electronic switch, and store the photovoltaic electric energy by intelligent controller instruction energy-storage battery.For energy-storage battery, in the paddy electricity price period, intelligent controller is connected the 3rd electronic switch and is instructed the energy-storage battery energy storage; In the peak electricity price period, then intelligent controller is controlled the disconnection of first electronic switch, is connected the 3rd electronic switch, instruction energy-storage battery inversion power supply; In other periods, intelligent controller is controlled the 3rd electronic switch and is connected power supply then according to customer charge situation and energy storage surplus; Under complete power down mode, then disconnect first electronic switch, connect the 3rd electronic switch, instruction energy-storage battery inversion power supply.When in the ordinary telegram period, control first electronic switch at intelligent controller and connect, preferentially select mains-supplied, therefore, normal electricity consumption that not only can interference user after inserting photovoltaic and energy-storage battery, and can reach energy-conservation and make things convenient for the purpose of user power utilization.(2) owing to be provided with first, second, third current transformer, therefore, can change the size of electric current and the type of electricity according to the requirement of electricity consumption.(3) owing to be provided with first, second, third air switch, therefore, can better protect the safety of user power utilization.(4) owing to be provided with the primary air switch, therefore, can not only protect the safety of user power utilization, and be convenient to control the supply of civil power.
Description of drawings
Fig. 1 is a schematic diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments the utility model is further elaborated.
Intelligent power distribution switch as shown in Figure 1 comprises first electronic switch 1, second electronic switch 2, the 3rd electronic switch 3, intelligent controller 4, first current transformer 5, second current transformer 6, the 3rd current transformer 7, first air switch 8, second air switch 9, the 3rd air switch 10, primary air switch 11; Civil power 12, primary air switch 11, first electronic switch 1, first current transformer 5, first air switch 8 and user 15 are connected in series successively; Photovoltaic 13, second electronic switch 2, second current transformer 6, second air switch 9 and user 15 are connected in series successively; Energy-storage battery 14, the 3rd electronic switch 3, the 3rd current transformer 7, the 3rd air switch 10 and user are connected in series successively; The work of described intelligent controller 4 control first electronic switch 1, second electronic switch 2 and the 3rd electronic switch 3, first air switch 8, second air switch 9 and the 3rd air switches 10.Described intelligent controller 4 can manually be set point, peak, flat, the paddy period of electricity consumption electricity price, detect the electric current of civil power, photovoltaic or energy-storage battery, and the calculating actual load according to the principle of reliable power supply and economic electricity consumption, determines when energy storage, inversion automatically or uses civil power.
The operation principle of the intelligent power distribution switch of present embodiment is: when the time, the user had load by day, by preferential second electronic switch 2 of connecting of the control of intelligent controller 4, when electric energy can not satisfy the load needs, connect the 3rd electronic switch 3 by energy-storage battery 14 power supply or connect first electronic switch 1 by civil power 12 power supplies, when the user is zero load, then connect the 3rd electronic switch 3, and store the photovoltaic electric energy by intelligent controller 4 instruction energy-storage batteries 14.For energy-storage battery 14, in the paddy electricity price period, intelligent controller 4 is connected the 3rd electronic switch 3 and is instructed the energy-storage battery energy storage; In the peak electricity price period, then intelligent controller 4 controls first electronic switch 1 disconnects, connects the 3rd electronic switch 3, instruction energy-storage battery 14 inversions power supply; In other periods, 4 of intelligent controllers are controlled the 3rd electronic switch 3 and are connected power supply according to customer charge situation and energy storage surplus; Under complete power down mode, then disconnect first electronic switch 1, connect the 3rd electronic switch 3, instruction energy-storage battery 14 inversions power supply.When in the ordinary telegram period, connect at intelligent controller 4 controls first electronic switch 1, preferentially select civil power 12 power supplies, therefore, normal electricity consumption that not only can interference user after inserting photovoltaic and energy-storage battery, and can reach energy-conservation and make things convenient for the purpose of user power utilization.

Claims (4)

1. an intelligent power distribution switch is characterized in that: comprise first electronic switch, second electronic switch, the 3rd electronic switch and intelligent controller; One end of described first electronic switch is electrically connected with the city, and the other end is connected with the user; One end of described second electronic switch is connected with photovoltaic, and the other end is connected with the user; One end of described the 3rd electronic switch is connected with energy-storage battery, and the other end is connected with the user; Described intelligent controller is controlled the work of first electronic switch, second electronic switch and the 3rd electronic switch.
2. intelligent power distribution switch according to claim 1 is characterized in that: be in series with first current transformer between first electronic switch and the user; Be in series with second current transformer between second electronic switch and the user; Be in series with the 3rd current transformer between the 3rd electronic switch and the user.
3. intelligent power distribution switch according to claim 2 is characterized in that: be in series with first air switch between described first current transformer and the user; Be in series with second air switch between second current transformer and the user; Be in series with the 3rd air switch between the 3rd current transformer and the user; Described intelligent controller is controlled the work of first air switch, second air switch and the 3rd air switch.
4. intelligent power distribution switch according to claim 1 is characterized in that: be in series with the primary air switch between the civil power and first electronic switch; The work of described intelligent controller control primary air switch.
CN2010206679757U 2010-12-20 2010-12-20 Intelligent power distribution switch Expired - Lifetime CN201898371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206679757U CN201898371U (en) 2010-12-20 2010-12-20 Intelligent power distribution switch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206679757U CN201898371U (en) 2010-12-20 2010-12-20 Intelligent power distribution switch

Publications (1)

Publication Number Publication Date
CN201898371U true CN201898371U (en) 2011-07-13

Family

ID=44256255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206679757U Expired - Lifetime CN201898371U (en) 2010-12-20 2010-12-20 Intelligent power distribution switch

Country Status (1)

Country Link
CN (1) CN201898371U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110932332A (en) * 2019-12-28 2020-03-27 广东南控电力有限公司 Distributed regulation and control type solar power generation system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110932332A (en) * 2019-12-28 2020-03-27 广东南控电力有限公司 Distributed regulation and control type solar power generation system

Similar Documents

Publication Publication Date Title
CN103178553B (en) A kind of family expenses mixed power supply system
CN203339769U (en) Online energy storage power supply for photovoltaic and mains supply complementary input
CN104092236A (en) Hybrid renewable energy and energy storage system power supply system and control method thereof
CN103633727A (en) Hybrid electric photovoltaic accumulation system inversion control all-in-one machine
CN105262158A (en) Household energy storage control circuit
CN202904280U (en) Control circuit approaching to zero standby power consumption
CN103401297A (en) Power utilization energy-saving device with uninterruptible power and low cost
CN204205617U (en) A kind of power conversion is generated electricity by way of merging two or more grid systems electric power system
CN102122830B (en) Charging mechanism for electric vehicles
CN202210696U (en) Household solar energy charge and discharge system
CN204741333U (en) Family is from power generation system
CN204349473U (en) A kind of power supply system of DC source
CN201898371U (en) Intelligent power distribution switch
CN203151120U (en) Household hybrid power supply system
CN202408488U (en) Chargeable water dispenser
CN202872455U (en) Solar smart home supply power system
CN201138763Y (en) Peak-and-valley electric energy exchangers
CN203800689U (en) Rechargeable air conditioner
CN203104036U (en) Intelligent household new energy power supply system
CN204089691U (en) Portable multi-voltage grade alternating current-direct current exports sun-generated electric power case
CN201877877U (en) Solar energy power supply control device for communication base station of high-speed railway
CN203562825U (en) An off-grid solar energy storage complementary power supply system
CN203490511U (en) Power supply system
CN206432769U (en) A kind of utilization solar power generation evades the generating equipment of peak of power consumption
CN206709201U (en) Electric heating boiler control assembly can be set in a kind of working time, peak-trough electricity

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20110713

CX01 Expiry of patent term