CN201881602U CN2010206844504U CN201020684450U CN201881602U CN 201881602 U CN201881602 U CN 201881602U CN 2010206844504 U CN2010206844504 U CN 2010206844504U CN 201020684450 U CN201020684450 U CN 201020684450U CN 201881602 U CN201881602 U CN 201881602U
Authority
CN
China
Prior art keywords
layer
corrosion
steel
layer structure
resistant layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206844504U
Other languages
Chinese (zh)
Inventor
廖永华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Longzhiquan Science & Technology Co., Ltd.
Original Assignee
CHENGDU LONGQUAN ANTI-CORROSION ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU LONGQUAN ANTI-CORROSION ENGINEERING CO LTD filed Critical CHENGDU LONGQUAN ANTI-CORROSION ENGINEERING CO LTD
Priority to CN2010206844504U priority Critical patent/CN201881602U/en
Application granted granted Critical
Publication of CN201881602U publication Critical patent/CN201881602U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a corrosion-resistant layer structure of a steel girder in a spray area of a desulfurization absorption tower, which comprises a supporting girder steel basal body arranged at the innermost layer, a resin flake layer is arranged outside the supporting girder steel base body, a glass steel layer is arranged outside the resin flake layer, and a polypropylene layer is arranged outside the glass steel layer. The vinyl ester resin flake layer with 9-millimeter thick, the glass steel layer and the polypropylene layer are used as the corrosion-resistant layer structure of the steel girder in the spray area, therefore, the corrosion-resistant layer structure can prevent corrosion of acid liquor and scouring of smoke, has been practically used for more than 2 years without the phenomenon of corrosion and leakage caused by problems of self structure of the corrosion-resistant layer, avoids leakage of acid liquor caused by damage of the corrosion-resistant layer for power plants, and further avoids environment pollution.

Description

The anti-corrosion layer structure of a kind of desulfuration absorbing tower spray district girder steel
Technical field
The utility model relates to a kind of anti-corrosion layer structure, the anti-corrosion layer structure of particularly a kind of desulfuration absorbing tower spray district girder steel.
Background technology
A large amount of SO2 are contained from the flue gas of boiler emission in thermal power plant before not setting up desulfurizer, directly the chimney by power plant enters atmosphere, and SO2 combines the formation acid solution with airborne moisture, accumulate over a long period with the form contaminated environment of acid rain, influences the healthy of people.After the power plant desulfurization device was set up, this environmental issue was just solved.The nucleus equipment of desulfurizer is a desulfuration absorbing tower, and it is the cardiac component of desulfurizer, and desulfuration absorbing tower adds that by carbon steel structure rational anti-corrosion layer structure forms, and therefore selects rational anti-corrosion layer structure very important.Because containing the flue gas of a large amount of SO2 passes through from desulfuration absorbing tower; so whole desulfurizing tower inside is sour environment; the corrosion protective covering structure of carrying out desulfurizing tower inside is very important; if it is unreasonable that anti-corrosion layer structure is selected, corrosion protective covering does not play the protection buffer action, and acid solution is passed anti-corrosion layer structure and is penetrated into carbon steel shell; corrosion carbon steel shell and boring a hole; a large amount of acid liquor leakages go out the desulfurizing tower contaminated environment, even cause desulfurizing tower not use, and entire power plant is shut down the serious consequence that can not generate electricity.
In the prior art, a kind of scheme is to utilize the C276 alloy sheets to wrap up girder steel as anticorrosive coat, and its effect is better, but there is the too high weak point of cost in it;
In the prior art, also having a kind of scheme is to utilize rubber slab to do anticorrosive coat parcel girder steel, its antiseptic effect is better, but still have the higher defective of cost, and simultaneously, its wear-resisting poor effect, generally, operation 2-3, the phenomenon that rubber slab is washed away, bores a hole happens occasionally, the corresponding high problem of maintenance cost of bringing.
In the prior art, also having a kind of scheme is to adopt the vinyl ester resin scale to add fiberglass parcel girder steel, favorable anti-corrosion effect, but still there is a higher defective of cost, simultaneously, its wear-resisting weak effect used about 1 year, the phenomenon that anticorrosive coat is washed away perforation is many, the corresponding high problem of maintenance cost of bringing.
The utility model content
Goal of the invention of the present utility model is: at the problem of above-mentioned existence, provide a kind of and can prevent anticorrosive coat acid liquid corrosion and sweep of gases, with low cost.
The technical solution adopted in the utility model is such: the anti-corrosion layer structure of a kind of desulfuration absorbing tower spray district girder steel, comprise the brace summer steel matrix that is arranged at innermost layer, described brace summer steel matrix is outside equipped with the resin scale layer, described resin scale layer is outside equipped with frp layer, and described frp layer is outside equipped with polypropylene layer.
Described resin scale layer is the vinyl ester resin scale layer.
Described polypropylene layer thickness is 5mm.
Described frp layer thickness is 2mm.
Described resin scale layer thickness is 2mm.
In sum, owing to adopted technique scheme, the beneficial effects of the utility model are:
1, the vinyl ester resin scale glass steel that adopts in the utility model adds polypropylene board as spraying district's girder steel anti-corrosion layer structure and comparing as anticorrosive coat with C276, and is corrosion-resistant suitable with wearability, but expense is lower;
2, the vinyl ester resin scale glass steel that adopts in the utility model adds polypropylene board as spraying district's girder steel anti-corrosion layer structure and comparing as anticorrosive coat with rubber layer, and corrosion resistance is suitable, and wearability is better, and expense is lower.
3, than the other technologies scheme, the vinyl ester resin scale glass steel of gross thickness 9 ㎜ adds that polypropylene layer is as spray district girder steel anti-corrosion layer structure, can prevent acid liquid corrosion and sweep of gases, reached more than 2 years through the practice time, no any phenomenon because of anticorrosive coat self structure problem generation corrosion leakage, avoided power plant to damage, acid liquor leakage has taken place, caused environmental pollution problems because of anticorrosive coat.
Description of drawings
Fig. 1 is the cutaway view of the anti-corrosion layer structure of the utility model desulfuration absorbing tower spray district girder steel.
Mark among the figure: 1 is the brace summer steel matrix; 2 is the resin scale layer; 3 is frp layer; 4 is polypropylene layer.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is done detailed explanation.
In order to make the purpose of this utility model, technical scheme and advantage clearer,, the utility model is further elaborated below in conjunction with drawings and Examples.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
As shown in Figure 1, the anti-corrosion layer structure of the utility model desulfuration absorbing tower spray district girder steel, the brace summer steel matrix 1 that comprises innermost layer, promptly in order to the girder steel of its supporting role, the outer setting of brace summer steel matrix 1 has resin scale layer 2, and resin scale layer 2 outer setting have frp layer 3, frp layer 3 outer setting have polypropylene layer 4, preferably, resin scale layer 2 is the vinyl ester resin scale, and gross thickness is 9mm.
Embodiment 1
As a kind of embodiment of the present utility model, the brace summer steel matrix 1 that comprises innermost layer, promptly in order to the girder steel of its supporting role, the outer setting of brace summer steel matrix 1 has resin scale layer 2, resin scale layer 2 outer setting have frp layer 3, and frp layer 3 outer setting have polypropylene layer 4, and are preferred, resin scale layer 2 is the vinyl ester resin scale, and gross thickness is 9mm.Wherein, the thickness of polypropylene layer 4 is 5mm, and preferred, frp layer 3 thickness are 2mm, and resin scale layer 2 thickness are 2mm.
Embodiment 2
As a kind of embodiment of the present utility model, the brace summer steel matrix 1 that comprises innermost layer, promptly in order to the girder steel of its supporting role, the outer setting of brace summer steel matrix 1 has resin scale layer 2, and resin scale layer 2 outer setting have frp layer 3, frp layer 3 outer setting have polypropylene layer 4, preferably, resin scale layer 2 is the vinyl ester resin scale, and wherein frp layer 3 thickness are 2mm, resin scale layer 2 thickness are 2mm, and the thickness of polypropylene layer 4 is provided with as required.
The above only is preferred embodiment of the present utility model; not in order to restriction the utility model; all any modifications of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.

Claims (6)

1. a desulfuration absorbing tower sprays the anti-corrosion layer structure of distinguishing girder steel, comprise the brace summer steel matrix that is arranged at innermost layer, it is characterized in that: described brace summer steel matrix is outside equipped with the resin scale layer, and described resin scale layer is outside equipped with frp layer, and described frp layer is outside equipped with polypropylene layer.
2. the anti-corrosion layer structure of desulfuration absorbing tower spray according to claim 1 district girder steel, it is characterized in that: described resin scale layer is the vinyl ester resin scale layer.
3. the anti-corrosion layer structure of desulfuration absorbing tower spray according to claim 1 and 2 district girder steel, it is characterized in that: described polypropylene layer thickness is 5mm.
4. the anti-corrosion layer structure of desulfuration absorbing tower spray according to claim 1 and 2 district girder steel, it is characterized in that: described frp layer thickness is 2mm.
5. the anti-corrosion layer structure of desulfuration absorbing tower spray according to claim 3 district girder steel, it is characterized in that: described frp layer thickness is 2mm.
6. the anti-corrosion layer structure of desulfuration absorbing tower spray according to claim 5 district girder steel, it is characterized in that: described resin scale layer thickness is 2mm.
CN2010206844504U 2010-12-28 2010-12-28 Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower Expired - Lifetime CN201881602U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206844504U CN201881602U (en) 2010-12-28 2010-12-28 Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206844504U CN201881602U (en) 2010-12-28 2010-12-28 Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower

Publications (1)

Publication Number Publication Date
CN201881602U true CN201881602U (en) 2011-06-29

Family

ID=44179139

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206844504U Expired - Lifetime CN201881602U (en) 2010-12-28 2010-12-28 Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower

Country Status (1)

Country Link
CN (1) CN201881602U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104043319A (en) * 2014-06-24 2014-09-17 宜兴市海纳环境工程有限公司 Heavy anticorrosion reconstruction process and heavy anticorrosion structure of desulfuration spray tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104043319A (en) * 2014-06-24 2014-09-17 宜兴市海纳环境工程有限公司 Heavy anticorrosion reconstruction process and heavy anticorrosion structure of desulfuration spray tower

Similar Documents

Publication Publication Date Title
CN207081647U (en) The weather-proof system safety testing device of corrosion-inhibiting coating under a kind of full weather conditions
CN201881602U (en) Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower
CN107389541A (en) The weather-proof system safety testing device of corrosion-inhibiting coating under full weather conditions
CN205145961U (en) Take desulfurizing tower of rectification increase grid
CN201881603U (en) Corrosion-resistant layer structure of steel girder in spray area of desulfurization absorption tower
CN201880467U (en) Erosion resistant coating structure of desulfuration absorption tower bottom plate
CN201889147U (en) Anti-corrosive layer structure for smoke gas inlet bottom plate of desulfurization absorption tower
CN202021874U (en) Anti-corrosion layer structure of baseplate of desulfurization accident tank
CN2907850Y (en) Wear resistant support of electric power plant desulfure absorption tower
CN202023401U (en) Anti-corrosion layer structure of connecting seam of steel-base-body flue and concrete flue
CN204034516U (en) The anti-corrosion layer structure of a kind of absorption tower girder steel and pipe-support structure
CN205509320U (en) Good box -type substation of ventilation cooling nature
CN202024345U (en) Anticorrosive coating structure used for thermal power plant concrete chimney expansion joint
CN202647810U (en) Corrosion-proof desulfurization chimney
CN208381601U (en) A kind of pipeline anticorrosion device with long service life
CN202546796U (en) Anticorrosive coating structure at desulfurized steel base flue expansion joint
CN206803198U (en) A kind of wet desulphurization antiseepage Anti-corrosive chimney
CN204666481U (en) A kind of atmospheric corrosion behavioral study device of accelerated corrosion carbon steel
CN202032598U (en) Anti-corrosion layer structure for desulfurization chimney corbel
CN204996331U (en) Second grade formula desulfurization absorption tower of turning back
CN201466233U (en) Anti-corrosion resistance reducing module for protecting earth screen
CN205223061U (en) A system's device for preparing formaldehyde
CN206452930U (en) The automatic water-replenishing device of Afforestation Landscape
CN202627220U (en) Anticorrosive layer structure at junction of carbon steel and alloy steel of flue gas inlet of desulfurizing absorption tower
CN204799414U (en) Flue gas equipartition device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHENGDU LONGZHIQUAN SCIENCE + TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: CHENGDU LONGQUAN ANTI-CORROSION ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 610100 No. 353 whale long road, Longquanyi District, Sichuan, Chengdu

Patentee after: Chengdu Longzhiquan Science & Technology Co., Ltd.

Address before: 610100 No. 353 whale long road, Longquanyi District, Sichuan, Chengdu

Patentee before: Chengdu Longquan Anti-Corrosion Engineering Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20110629