CN201866921U - Gas-fired tea bathing stove - Google Patents

Gas-fired tea bathing stove Download PDF

Info

Publication number
CN201866921U
CN201866921U CN2010206137772U CN201020613777U CN201866921U CN 201866921 U CN201866921 U CN 201866921U CN 2010206137772 U CN2010206137772 U CN 2010206137772U CN 201020613777 U CN201020613777 U CN 201020613777U CN 201866921 U CN201866921 U CN 201866921U
Authority
CN
China
Prior art keywords
cavity
chamber
heating
stove
heater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206137772U
Other languages
Chinese (zh)
Inventor
王文茂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010206137772U priority Critical patent/CN201866921U/en
Application granted granted Critical
Publication of CN201866921U publication Critical patent/CN201866921U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model relates to a tea bathing stove, in particular to a gas-fired tea bathing stove, which solves the problems that the existing tea bathing stove is not energy-saving, a large amount of soot is discharged, pollution can be easily caused, and the thermal efficiency is low. The tea bathing stove comprises a stove body and a base arranged at the bottom of the stove body; the middle part of the stove body is provided with a transfer cavity, the cavity of the stove body comprises a heating cavity and a preheating cavity, and the heating cavity and the preheating cavity are separated by the transfer cavity; a burner is arranged in the cavity of the base; a heating tube is arranged in the heating cavity; the two ends of the heating tube are respectively communicated with the cavity of the base and the inside of the transfer cavity; a waste gas channel and an exhaust tube are arranged in the preheating cavity, the two ends of the waste gas channel are respectively communicated with the inside of the transfer cavity and the outside of the stove body; and the two ends of the exhaust tube are respectively communicated with the upper part of the heating cavity and the upper part of the preheating cavity. The gas-fired tea bathing stove effectively solves the problems that the existing tea bathing stove is not energy-saving, a large amount of soot is discharged, pollution can be easily caused, and the thermal efficiency is low. Moreover, the gas-fired tea bathing stove is suitable for hot water supply, bathing, heating, cooking and the like.

Description

The combustion gas tea-bath furnace
Technical field
The utility model relates to tea-bath furnace, specifically is a kind of combustion gas tea-bath furnace.
Background technology
Tea-bath furnace is widely used in aspects such as boiling water supply, shower, heating, cooking; Existing tea-bath furnace adopts electricity to drive more or water pump drives, because self structure is limit the existing shortcoming that the tea-bath furnace ubiquity is not energy-conservation, smoke discharge amount greatly, easily pollutes and the thermal efficiency is low; Be necessary to invent for this reason a kind of energy-conservation, can not pollute and novel tea-bath furnace that the thermal efficiency is high.
Summary of the invention
The utility model provides a kind of combustion gas tea-bath furnace in order to solve the existing problem that tea-bath furnace is not energy-conservation, smoke discharge amount greatly, easily pollutes and the thermal efficiency is low.
The utility model is to adopt following technical scheme to realize: combustion gas tea-bath furnace, the base that comprises body of heater and be installed in bottom of furnace body; The body of heater middle part is provided with transfer chamber, and the body of heater inner chamber comprises heating chamber and the preheating cavity that is separated by transfer chamber; Base intracavity is provided with burner; Be provided with heating tube in the heating chamber; The heating tube two ends are communicated with base intracavity and transfer chamber inner chamber respectively; Be provided with flue and blast pipe in the preheating cavity; The flue two ends respectively with transfer chamber inner chamber and body of heater external communications; The blast pipe two ends are communicated with heating chamber top and preheating cavity top respectively; Furnace body outer wall is provided with tube connector; The tube connector two ends are communicated with the heating chamber bottom with the preheating cavity bottom respectively; The preheating cavity upper face has water injection hole; Control valve is installed on the tube connector, and the heating chamber lower surface has apopore; The number and the arrangement mode of the shape of described transfer chamber, the structure of burner, heating tube all are decided according to the actual requirements; Described burner is the structure that those skilled in the art realize easily, and multiple malformation can be arranged.
During work, by water injection hole water filling in preheating cavity; Opening controlling valve makes that the water in the preheating cavity enters heating chamber through tube connector, starts the burner of base intracavity this moment, medium in the burner burns and produces waste gas, waste gas arrives transfer chamber by heating tube, and enters flue through transfer chamber, finally outside flue is discharged to body of heater; The heat that waste gas carries then conducts to heating chamber and preheating cavity by heating tube, transfer chamber, flue respectively, when the water in the heating chamber is heated, also the water in the preheating cavity is carried out preheating; The steam that produces after water in the heating chamber is heated then enters preheating cavity by blast pipe, and the water in the preheating cavity is carried out further preheating; After heating was finished, the water in the heating chamber was drawn outside the body of heater by apopore and is used as boiling water; When the water shortage in the heating chamber, water in the preheating cavity can be supplemented to heating chamber by opening controlling valve; Compare with existing tea-bath furnace, combustion gas tea-bath furnace described in the utility model has adopted brand-new thermal cycle structure, can the heat that burner combustion produced be utilized to greatest extent, it is not only energy-conservation, and smoke discharge amount is little, can not pollute, compare with existing tea-bath furnace simultaneously, the thermal efficiency of combustion gas tea-bath furnace described in the utility model has had significantly raising.
The utility model efficiently solves the existing problem that tea-bath furnace is not energy-conservation, smoke discharge amount greatly, easily pollutes and the thermal efficiency is low, is applicable to boiling water supply, shower, heating, cooking etc.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is the structural representation of burner of the present utility model.
Among the figure: 1-body of heater, 2-base, 3-transfer chamber, 4-heating chamber, 5-preheating cavity, 6-burner, the 7-heating tube, 8-flue, 9-blast pipe, 10-tube connector, 11-water injection hole, 12-control valve, 13-apopore, 14-burn the seat, 15-combustion chamber, 16-air intake duct, the combustion-supporting hole of 17-.
The specific embodiment
The combustion gas tea-bath furnace, the base 2 that comprises body of heater 1 and be installed in body of heater 1 bottom; Body of heater 1 middle part is provided with transfer chamber 3, and body of heater 1 inner chamber comprises heating chamber 4 and the preheating cavity 5 that is separated by transfer chamber 3; Base 2 inner chambers are provided with burner 6; Be provided with heating tube 7 in the heating chamber 4; Heating tube 7 two ends are communicated with base 2 inner chambers and transfer chamber 3 inner chambers respectively; Be provided with flue 8 and blast pipe 9 in the preheating cavity 5; Flue 8 two ends respectively with transfer chamber 3 inner chambers and body of heater 1 external communications; Blast pipe 9 two ends are communicated with heating chamber 4 tops and preheating cavity 5 tops respectively; Body of heater 1 outer wall is provided with tube connector 10; Tube connector 10 two ends are communicated with heating chamber 4 bottoms with preheating cavity 5 bottoms respectively; Preheating cavity 5 upper faces have water injection hole 11; Control valve 12 is installed on the tube connector 10, and heating chamber 4 lower surface have apopore 13;
Described burner 6 comprises burning seat 14, combustion chamber 15 and air intake duct 16; Wherein, burning seat 14 marginal surfaces have combustion-supporting hole 17, and in burning seat 14 tops, air intake duct 16 is communicated with combustion chamber 15 combustion chamber 15 by stent support; Burning seat 14 is fixed with base 2 inwalls; During work, combustion medium enters combustion chamber by air intake duct and burns in combustion chamber, fresh air is gone into combustion chamber by combustion-supporting orifice flow and is carried out combustion-supportingly, and the waste gas that burning produces enters base intracavity by the upper end open of combustion chamber, and enters heating tube through base intracavity; During concrete enforcement, transfer chamber 3 be shaped as the loudspeaker round; Burner 6 adopts gas burner or neat gas burner, and the number of heating tube 7 is six, and six heating tubes are evenly distributed around the axis of loudspeaker round transfer chamber.

Claims (2)

1. combustion gas tea-bath furnace, the base (2) that comprises body of heater (1) and be installed in body of heater (1) bottom; It is characterized in that: body of heater (1) middle part is provided with transfer chamber (3), and body of heater (1) inner chamber comprises heating chamber (4) and the preheating cavity (5) that is separated by transfer chamber (3); Base (2) inner chamber is provided with burner (6); Be provided with heating tube (7) in the heating chamber (4); Heating tube (7) two ends are communicated with base (2) inner chamber and transfer chamber (3) inner chamber respectively; Be provided with flue (8) and blast pipe (9) in the preheating cavity (5); Flue (8) two ends respectively with transfer chamber (3) inner chamber and body of heater (1) external communications; Blast pipe (9) two ends are communicated with heating chamber (4) top and preheating cavity (5) top respectively; Body of heater (1) outer wall is provided with tube connector (10); Tube connector (10) two ends are communicated with heating chamber (4) bottom with preheating cavity (5) bottom respectively; Preheating cavity (5) upper face has water injection hole (11); Control valve (12) is installed on the tube connector (10); Heating chamber (4) lower surface has apopore (13).
2. combustion gas tea-bath furnace according to claim 1 is characterized in that: described burner (6) comprises burning seat (14), combustion chamber (15) and air intake duct (16); Wherein, burning seat (14) marginal surface has combustion-supporting hole (17), and in burning seat (14) top, air intake duct (16) is communicated with combustion chamber (15) combustion chamber (15) by stent support; Burning seat (14) is fixed with base (2) inwall.
CN2010206137772U 2010-11-19 2010-11-19 Gas-fired tea bathing stove Expired - Fee Related CN201866921U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206137772U CN201866921U (en) 2010-11-19 2010-11-19 Gas-fired tea bathing stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206137772U CN201866921U (en) 2010-11-19 2010-11-19 Gas-fired tea bathing stove

Publications (1)

Publication Number Publication Date
CN201866921U true CN201866921U (en) 2011-06-15

Family

ID=44138074

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206137772U Expired - Fee Related CN201866921U (en) 2010-11-19 2010-11-19 Gas-fired tea bathing stove

Country Status (1)

Country Link
CN (1) CN201866921U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968262A (en) * 2010-11-19 2011-02-09 王文茂 Gas boiling water furnace

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101968262A (en) * 2010-11-19 2011-02-09 王文茂 Gas boiling water furnace

Similar Documents

Publication Publication Date Title
CN201866921U (en) Gas-fired tea bathing stove
CN205482343U (en) High -efficient heat accumulation formula non ferrous metal melting furnace
CN214949776U (en) Sleeve type condensation wall-mounted furnace
CN205606639U (en) Heating cooking stove with interlayer water jacket
CN201866920U (en) Gas heating boiler without power, noise, smoke tube and pollution
CN204043188U (en) A kind of New type detachable Multi-purpose energy-saving boiler
CN101968262A (en) Gas boiling water furnace
CN201740220U (en) Inner water liner upright downdraft boiler
CN201155856Y (en) Efficient energy-saving convection chamber of heating stove
CN201964607U (en) Normal pressure hot-water energy-saving boiler
CN201163093Y (en) High-efficiency energy-saving air-heating furnace
CN201828015U (en) High-efficiency composite energy-saving boiler
CN204787216U (en) Horizontal gasification is returned and is burnt boiler with flue gas postcombustion function
CN204478463U (en) Energy-conservation easy to clean divided boiler
CN102980212B (en) A kind of energy-saving gas cooker of band rotary heat-exchange device
CN208312708U (en) A kind of inner-tube structure of energy-saving hot water stove
CN201779703U (en) High-efficiency energy-saving air return type two-purpose stove with ventilation oxygen absorbing cylinder
CN201688446U (en) Return-air hot-water honeycomb briquette stove
CN201443879U (en) Hearth of heat transfer oil carrier furnace
CN201836861U (en) Environment-friendly energy-saving wine-making steam boiler
CN2906337Y (en) High-efficiency coal furnace
CN208735891U (en) A kind of wall-hung boiler of scale removal easy to clean
CN211782809U (en) Core rod preheating system utilizing waste heat
CN207865690U (en) Horizontal three return-stroke constant pressure boiler
CN205939692U (en) Organic heat transfer material heater of dust removal function

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20121119