CN201864462U - 整体火道墙的吊运装置 - Google Patents

整体火道墙的吊运装置 Download PDF

Info

Publication number
CN201864462U
CN201864462U CN2010202411161U CN201020241116U CN201864462U CN 201864462 U CN201864462 U CN 201864462U CN 2010202411161 U CN2010202411161 U CN 2010202411161U CN 201020241116 U CN201020241116 U CN 201020241116U CN 201864462 U CN201864462 U CN 201864462U
Authority
CN
China
Prior art keywords
overhead hoist
path wall
whole
hoist
whole flame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202411161U
Other languages
English (en)
Inventor
齐忠昱
方明勋
王林华
王书宝
卢延峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Original Assignee
Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd filed Critical Shenyang Aluminum and Magnesium Engineering and Research Institute Co Ltd
Priority to CN2010202411161U priority Critical patent/CN201864462U/zh
Application granted granted Critical
Publication of CN201864462U publication Critical patent/CN201864462U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

本实用新型涉及一种火道墙的吊运装置,尤其涉及一种炭素焙烧炉用整体火道墙的吊运装置。整体火道墙的吊运装置,由下述结构构成:两个提升框架,每个提升框架的上梁及下梁设有上固定孔和下固定孔,下固定孔的内侧设有嵌入体,在提升框架的上梁的中部设有吊装孔。本实用新型的优点效果:本实用新型结构简单、占地面积小,使用方便且成本低廉,能一次吊运整体火道墙,减轻了工人的劳动强度。

Description

整体火道墙的吊运装置
技术领域
本实用新型涉及一种火道墙的吊运装置,尤其涉及一种炭素焙烧炉用整体火道墙的吊运装置。 
背景技术
炭素焙烧炉的火道墙是极易受损的部位,需经常更换重新砌筑。目前采用的办法是人工在焙烧炉里砌筑,由于焙烧炉里的余温高通风条件差,作业空间极其狭窄,工人的劳动强度大环境恶劣等因素,使工作效率低下严重制约了炭素焙烧炉的高效生产。 
实用新型内容
本实用新型就是为了解决上述问题而提供的一种整体火道墙的吊运装置,目的是使用方便,结构简单、成本低廉、占地面积少且容易操作,能在炉外砌筑整体火道墙并整体吊运到炭素焙烧炉内。 
为达到上述目的本实用新型整体火道墙的吊运装置,由下述结构构成:两个提升框架,每个提升框架的上梁及下梁设有上固定孔和下固定孔,下固定孔的内侧设有嵌入体,在提升框架的上梁的中部设有吊装孔。 
所述的上梁及下梁的两端之间设有立柱,上梁及下梁的中部之间设有米字形支撑架。 
所述的米字形支撑架与立柱之间设有加强杆。 
所述的嵌入体为半圆体。 
本实用新型的优点效果:本实用新型结构简单、占地面积小,使用方便且成本低廉,能一次吊运整体火道墙,减轻了工人的劳动强度。 
附图说明
图1是本实用新型的结构示意图。 
图2是图1的A-A剖视图。 
图中:1、吊装孔;2、提升框架;3、紧固件;4、嵌入体;5、异型砖;6、耐火砖;7、上梁;8、下梁;9、立柱;10、支撑架;11、加强杆;12、上固定孔、13、下固定孔。 
具体实施方式
下面对本实用新型的的实施例结合附图加以详细描述,但本实用新型的的保护范围不受实施例所限。 
如图所示本实用新型整体火道墙的吊运装置,由下述结构构成:两个提升框架2,每个提升框架2的上梁7及下梁8设有上固定孔12和下固定孔13,下固定孔13的内侧设有嵌入体4,在提升框架2的上梁7的中部设有吊装孔1,上梁7及下梁8的两端之间设有立柱9,上梁7及下梁8的中部之间设有米字形支撑架10,米字形支撑架10与立柱9之间设有加强杆11;嵌入体4为半圆体。 
本实用新型的工作原理:将两个提升框架2分别固定在整体火道墙的两侧,整体火道墙的顶层和底层为带有与嵌入体4相匹配凹槽的异型砖5,将嵌入体4插入到凹槽内,紧固件3穿过上固定孔12、下固定孔13、嵌入体4和异型砖5后固定,最后通过吊装孔1进行吊运,吊运到指定位置后打开紧固件3取出两片提升框架2,即完成了整体火道墙的砌筑和吊运。 

Claims (4)

1.整体火道墙的吊运装置,其特征在于由下述结构构成:两个提升框架,每个提升框架的上梁及下梁设有上固定孔和下固定孔,下固定孔的内侧设有嵌入体,在提升框架的上梁的中部设有吊装孔。
2.根据权利要求1所述的整体火道墙的吊运装置,其特征在于所述的上梁及下梁的两端之间设有立柱,上梁及下梁的中部之间设有米字形支撑架。
3.根据权利要求2所述的整体火道墙的吊运装置,其特征在于所述的米字形支撑架与立柱之间设有加强杆。
4.根据权利要求1所述的整体火道墙的吊运装置,其特征在于所述的嵌入体为半圆体。 
CN2010202411161U 2010-06-29 2010-06-29 整体火道墙的吊运装置 Expired - Lifetime CN201864462U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202411161U CN201864462U (zh) 2010-06-29 2010-06-29 整体火道墙的吊运装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202411161U CN201864462U (zh) 2010-06-29 2010-06-29 整体火道墙的吊运装置

Publications (1)

Publication Number Publication Date
CN201864462U true CN201864462U (zh) 2011-06-15

Family

ID=44135624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202411161U Expired - Lifetime CN201864462U (zh) 2010-06-29 2010-06-29 整体火道墙的吊运装置

Country Status (1)

Country Link
CN (1) CN201864462U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102311043A (zh) * 2010-06-29 2012-01-11 沈阳铝镁设计研究院有限公司 整体火道墙的吊运装置及方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102311043A (zh) * 2010-06-29 2012-01-11 沈阳铝镁设计研究院有限公司 整体火道墙的吊运装置及方法

Similar Documents

Publication Publication Date Title
CN201809961U (zh) 电梯井筒三角斜撑操作平台
CN202596184U (zh) 一种装配式大墙板的吊装节点
CN201864462U (zh) 整体火道墙的吊运装置
CN102311043A (zh) 整体火道墙的吊运装置及方法
CN203891442U (zh) 高层电梯井筒模板支设平台
CN204040440U (zh) 一种工具式电梯井操作平台
CN203961142U (zh) 一种预制屋面
CN203924411U (zh) 预制装配式防火墙
CN203393721U (zh) 内支撑主围檩部件
CN207645633U (zh) 一种用于矩形隧道复合式管片的翻转吊具
CN202969631U (zh) 全组装整体灌注复合式墙体
CN203174883U (zh) 一种带有检查通道的钢结构柱体
CN202018201U (zh) 石墨化炉用预制耐火墙板
CN204286098U (zh) 一种吊挂砖
CN201535627U (zh) 火道墙吊具
CN202945731U (zh) 一种轻型建筑砌块
CN203654536U (zh) 一种全玻幕墙大尺寸玻璃面板安装夹具连接件
CN202734544U (zh) 一种新型窑炉窑顶构件
CN203145495U (zh) 活动房屋
CN214169634U (zh) 一种弧形构件装配式建筑
CN202450620U (zh) 一种预制件之多功能吊装结构
CN202787581U (zh) 防碎裂高层石材幕墙
CN202007087U (zh) 超低电动葫芦门式起重机
CN201406788Y (zh) 一种新型的复合建筑结构板材
CN102759274B (zh) 一种窑炉窑顶构件

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110615