CN201862657U - Coiling laser tracking system - Google Patents

Coiling laser tracking system Download PDF

Info

Publication number
CN201862657U
CN201862657U CN2010206232442U CN201020623244U CN201862657U CN 201862657 U CN201862657 U CN 201862657U CN 2010206232442 U CN2010206232442 U CN 2010206232442U CN 201020623244 U CN201020623244 U CN 201020623244U CN 201862657 U CN201862657 U CN 201862657U
Authority
CN
China
Prior art keywords
tracking system
band steel
laser tracking
laser
strip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206232442U
Other languages
Chinese (zh)
Inventor
张超
宋波
田军利
王安生
李迪
刘杰
董元广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN2010206232442U priority Critical patent/CN201862657U/en
Application granted granted Critical
Publication of CN201862657U publication Critical patent/CN201862657U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

The utility model provides a coiling laser tracking system, which comprises a strip tracking down coiler and a strip tracking system connected with each other. The coiling laser tracking system is characterized by comprising a laser tracking device which is connected with the strip tracking down coiler and disposed on a roller way between a mill tail frame and a pinch roll. By the additional laser tracking device, a positioning procedure is added to the strip conveying process, position of a steel strip, which is calculated by speed, can be corrected to obtain more accurate strip position information, thereby accidents caused by strip position information calculation errors can be avoided, and coiling qualification rate is increased.

Description

Batch laser tracking system
Technical field
The utility model relates to and batches that band is taken the lead during steel, the tracking system of magnetic tape trailer.
Background technology
Batching tracking mainly is that the band steel is followed the tracks of computing module (Strip Tracking Down Coiler, be called for short STDC) and band steel tracking system (Strip Tracking System, be called for short STS), STDC calculates distance, be responsible for following the tracks of to the band steel the pinch roll from milling train end frame, it mainly is to calculate band steel toe portion and the afterbody distance from coiling machine.Specifically can be divided into following 2 steps: 1. after milling train end frame is stung steel and thrown steel, batch record milling train end frame working roll and throw the flashy speed of steel, with this speed as coiling clamp roller, reel, the Velocity Reference of roller-way, the speed after batching all is to change on this basis; 2. real-time tracking batches the prestissimo of top pinch roll and bottom pinch roll, calculates the distance of being with steel toe portion and afterbody to walk by " distance=speed * time " then, to judge band steel toe portion and afterbody residing position on roller-way.STS judges the position that the band steel is positioned by the distance that STDC calculates, and simulates the action that coiling machine should be carried out under this position when actual detected goes wrong, to guarantee production.
Because pinch roll existence wearing and tearing, these wearing and tearing are imponderable, and causing is to go up the speed of pressing from both sides or pressing from both sides down can not guarantee all whether it is in full accord with the speed of band steel on roller-way.Close-coupled band steel is produced (Compact Strip Production, be called for short CSP) be short flow process continuous casting and rolling, and based on rolling thin material, coiling machine is " bottleneck " that the line production capacity is produced in restriction, follows the tracks of importantly unusually, is forbidden if band steel toe portion enters the moment of pinch roll, can influence the short stroke action of flipper guide, serious words can cause roll useless, inaccurate if afterbody enters moment of pinch roll, will influence reel to tail.
The utility model content
The technical problems to be solved in the utility model is: a kind of laser tracking system of batching is provided, and the head of track band steel, afterbody are the optimization to STDC accurately.
The utility model is to solve the problems of the technologies described above the technical scheme of being taked to be: a kind of laser tracking system of batching, the band steel that comprises mutual connection is followed the tracks of computing module and band steel tracking system, it is characterized in that: it also comprises the laser tracking equipment, follow the tracks of computing module with the band steel and connect, be arranged on the roller-way between milling train end frame and the pinch roll.
Press such scheme, the distance between described laser tracking equipment and the described milling train end frame is 61-81m.
Press such scheme, described laser tracking equipment is the grating locator; Described grating locator is made of transmitter, receiver and adapter, wherein transmitter and receiver are symmetricly set on described roller-way both sides, receiver connects with adapter, and adapter connects with transmitter by T type distributor, and described T type distributor also is connected with power supply; The laser beam that produces between transmitter and the receiver constitutes grating, and each laser beam forms an optical signal; Described adapter signal output part is followed the tracks of computing module with described band steel and is connected.
Press such scheme, the useful signal that adopts in the optical signal that described laser beam forms is 10-18.
The course of work of the present utility model is: in the useful signal in the optical signal that laser beam forms, when at least 5 useful signals change, illustrate that band steel toe portion arrives grating locator position, be distance grating locator and milling train last frame between with the actual range between the frame of steel toe portion and milling train end this moment, the grating locator sends signal, pass to the band steel through signal output part and follow the tracks of computing module, actual range between band steel toe portion and the milling train end frame and the band steel toe portion position that band steel tracking computing module calculates are compared correction, this actual range substitution band steel is followed the tracks of continued in the computing module to calculate.Because the distance between grating locator and the pinch roll is shorter, variable factor is few in this segment distance, therefore is with the steel positional information to keep more accurately after the calibration this moment always, thereby reaches the purpose of correction.
The beneficial effects of the utility model are:
1, by increasing the laser tracking equipment, in band steel transport process, increase by one positioning process, can revise by the position that speedometer calculates, be with the steel positional information more accurately the band steel, avoid accident, improve the qualification rate of curling because of being with steel positional information calculation mistake to cause;
2, because the laser tracking equipment that increased is the independent entry device, only need connect with traditional curling tracking system hardware interface, and carry out simple parameters and set and get final product, easy for installation, compatibility by force.
Description of drawings
Fig. 1 is the structure chart of the utility model one embodiment
Fig. 2 is the circuit theory diagrams of laser tracking equipment
The specific embodiment
Fig. 1 is the structure chart of the utility model one embodiment, batch band steel tracking computing module STDC and band steel tracking system STS that laser tracking system comprises mutual connection, also comprise the laser tracking equipment that connects with STDC, be arranged on the roller-way between milling train end frame and the pinch roll, the distance between laser tracking equipment and the milling train end frame is 76 meters.
Described laser tracking equipment is the grating locator, its partial circuit figure as shown in Figure 2, constitute by transmitter, receiver and adapter, wherein transmitter and receiver are symmetricly set on described roller-way both sides, receiver connects with adapter, adapter connects with transmitter by T type distributor, and described T type distributor also is connected with power supply; The laser beam that produces between transmitter and the receiver constitutes grating, and each laser beam forms an optical signal; Described adapter signal output part is followed the tracks of computing module with described band steel and is connected.Adapter among the figure is adapter, and MLG S refers to transmitter, and MLG E is a receiver, and Profibus IN is the adapter input, and Profibus OUT is the adapter output, and Supply is a power supply.
The signal that the grating locator sends sends to SICKMLG_WISCO module among the STDC by hardware interface, one has 16 optical signals can be used and receive, gathered as long as wherein be no less than 5 optical signals, the grating locator is transferred to the band steel with regard to output signal by signal output part and follows the tracks of computing module.
The band steel operates on the roller-way, and the band steel is followed the tracks of computing module and calculated the head of band steel and the distance between the frame of milling train end by speed.When grating locator output signal, if the head of the band steel that band steel tracking computing module calculates and the distance between the frame of milling train end are in 61-81m, then explanation band steel arrives grating locator present position, then the actual range 76m with grating and last frame sends to the distance that the replacement of band steel tracking computing module calculated originally, and continues to calculate.Reach the purpose of the position row correction that the band steel is calculated by speedometer in this way.

Claims (4)

1. one kind is batched laser tracking system, the band steel that comprises mutual connection is followed the tracks of computing module and band steel tracking system, it is characterized in that: it also comprises the laser tracking equipment, follows the tracks of computing module with the band steel and connects, and is arranged on the roller-way between milling train end frame and the pinch roll.
2. the laser tracking system of batching according to claim 1 is characterized in that: the distance between described laser tracking equipment and the described milling train end frame is 61-81m.
3. the laser tracking system of batching according to claim 1 and 2 is characterized in that: described laser tracking equipment is the grating locator; Described grating locator is made of transmitter, receiver and adapter, wherein transmitter and receiver are symmetricly set on described roller-way both sides, receiver connects with adapter, and adapter connects with transmitter by T type distributor, and described T type distributor also is connected with power supply; The laser beam that produces between transmitter and the receiver constitutes grating, and each laser beam forms an optical signal; Described adapter signal output part is followed the tracks of computing module with described band steel and is connected.
4. the laser tracking system of batching according to claim 3 is characterized in that: the useful signal that adopts in the optical signal that described laser beam forms is 10-18.
CN2010206232442U 2010-11-24 2010-11-24 Coiling laser tracking system Expired - Fee Related CN201862657U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206232442U CN201862657U (en) 2010-11-24 2010-11-24 Coiling laser tracking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206232442U CN201862657U (en) 2010-11-24 2010-11-24 Coiling laser tracking system

Publications (1)

Publication Number Publication Date
CN201862657U true CN201862657U (en) 2011-06-15

Family

ID=44133826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206232442U Expired - Fee Related CN201862657U (en) 2010-11-24 2010-11-24 Coiling laser tracking system

Country Status (1)

Country Link
CN (1) CN201862657U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284504A (en) * 2011-08-15 2011-12-21 唐山国丰钢铁有限公司 Control method of reconstruction of lost coiling tracking of hot rolling production line
CN102553958A (en) * 2011-12-30 2012-07-11 中冶南方(武汉)自动化有限公司 Tracking recovery device for strip steel tracking system of continuous processing line to normal mode
CN103143572A (en) * 2013-03-22 2013-06-12 济钢集团有限公司 Altitude air-cooling coiling tracking and coiling control system
CN111618096A (en) * 2020-04-29 2020-09-04 河钢乐亭钢铁有限公司 Method for calculating tracking control of head of hot rolling coiler

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102284504A (en) * 2011-08-15 2011-12-21 唐山国丰钢铁有限公司 Control method of reconstruction of lost coiling tracking of hot rolling production line
CN102284504B (en) * 2011-08-15 2013-06-05 唐山国丰钢铁有限公司 Control method of reconstruction of lost coiling tracking of hot rolling production line
CN102553958A (en) * 2011-12-30 2012-07-11 中冶南方(武汉)自动化有限公司 Tracking recovery device for strip steel tracking system of continuous processing line to normal mode
CN103143572A (en) * 2013-03-22 2013-06-12 济钢集团有限公司 Altitude air-cooling coiling tracking and coiling control system
CN111618096A (en) * 2020-04-29 2020-09-04 河钢乐亭钢铁有限公司 Method for calculating tracking control of head of hot rolling coiler

Similar Documents

Publication Publication Date Title
CN201862657U (en) Coiling laser tracking system
CN104772443B (en) A kind of continuous casting fixed-length length measurement system and method
CN203699687U (en) Device for preventing rail gnawing and correcting synchronously for big wheeled crane
CN201760574U (en) Continuous casting fixed-length detection cutter
US20140117168A1 (en) Estimated train occupancy range determination device, onboard system, and estimated train occupancy range determination method
CN104772344B (en) Hot rolling synchronous mode heavy side press tracking
CN103861877A (en) System and method for tracking and controlling position of steel plate of moderate-thickness plate thermal treatment furnace
CN105251776A (en) Tracking processing method for band steel on cold tandem mill
CN103512503A (en) Apparatus and method for measuring width of steel coil of cold rolling production line
CN101934293A (en) Method for solving problem of loop charging and drifting of production line of pickling-rolling coupled machine
CN103842236A (en) Train control system
CN203484632U (en) Fixed length optimization cutting apparatus for continuous casting tail blank
CN103341499A (en) Device for tracing and detecting interior plate blank head position of fixed width machine
CN103350709A (en) Method for shortening safe distance between trains
CN104504911A (en) Motor vehicle speed measuring device and speed measuring method
CN101934358A (en) Casting flow tracking system of continuous casting machine
CN104249084B (en) A kind of method improving band steel portion's width accuracy end to end when hot continuous rolling is produced
CN102327925A (en) Method for controlling aperture of hot rolling and reeling side guide by using actually-measured width of finished product
CN206108556U (en) FTTX production line auto -stop trades a set system
CN106595549B (en) Continuous casting billet pouring length device for accurately measuring and measurement method
CN113777611B (en) Shuttle mine car positioning monitoring system based on ultrasonic technology
CN108163011A (en) A kind of railroad train self-correcting axle counting method and system
CN102680489B (en) System for on-line detecting holes on surface of strip steel
CN201974223U (en) Three-bending-plate weighing device
CN104527720A (en) Image acquisition control method and device and image acquisition system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110615

Termination date: 20161124

CF01 Termination of patent right due to non-payment of annual fee