CN201850658U - 带转动的钢管连接节点 - Google Patents
带转动的钢管连接节点 Download PDFInfo
- Publication number
- CN201850658U CN201850658U CN2010205977744U CN201020597774U CN201850658U CN 201850658 U CN201850658 U CN 201850658U CN 2010205977744 U CN2010205977744 U CN 2010205977744U CN 201020597774 U CN201020597774 U CN 201020597774U CN 201850658 U CN201850658 U CN 201850658U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- otic placode
- node
- pipe column
- rotates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
本实用新型公开了一种带转动的钢管连接节点,包括钢管柱和连接钢管,钢管柱的外圆周壁上设有第一耳板,连接钢管的一端部设有第二耳板,所述的第二耳板铰接在第一耳板上。利用本实用新型的结构,节点转动灵活,承载能力大,安装方便。<u/>
Description
技术领域
本实用新型涉及建筑方面的节点结构。
背景技术
节点是钢结构设计的灵魂所在,节点构造的好坏,对结构的受力性能、施工工艺、工程造价都有相当大的影响。通常钢管结构采用相贯节点。如中国专利号为200810240329.X申请日为2008.12.17公开日为2009.5.20的专利文献中公开了一种填充不锈钢管构件—不锈钢管焊接连接节点,由一根或一根以上腹杆通过焊接接头连接于弦杆上形成相贯节点,由焊接接头向弦杆传递腹杆的轴向拉压力以及弯矩,这种相贯节点常介于刚性或半刚性性能之间,不能灵活转动,在大跨度斜拉结构体系中,由于拉索预应力的张拉,局部钢管连接处变形大,引起局部钢管相贯节点焊缝的破坏,最终将破坏整个节点结构。
发明内容
本实用新型的目的是提供一种带转动的钢管连接节点,利用本实用新型的结构,节点转动灵活,承载能力大,安装方便。
为达到上述目的,带转动的钢管连接节点,包括钢管柱和连接钢管,钢管柱的外圆周壁上设有第一耳板,连接钢管的一端部设有第二耳板,所述的第二耳板铰接在第一耳板上。
由于第二耳板是铰接在第一耳板上,当受到拉索预应力的张拉时,第二耳板会向受力大的一方旋转,使节点受力均匀,因此,在节点处不会造成局部的变形大而局部损坏节点结构,节点的承载能力大。在安装时,先将第一耳板焊接到钢管柱上,然后,将第二耳板固定连接到连接钢管上,最后,将第二耳板铰接到第一耳板上,铰接过程可以在施工现场完成,而且属于铰接式连接,这样,能够随时调节第一耳板和第二耳板的相对位置,因此,安装方便。
作为改进,与连接钢管连接的第二耳板端部轴向的插接在连接钢管内。这样,第二耳板和连接钢管的连接面积大,而且,不容易产生应力集中,因此,第二耳板和连接钢管的连接强度高,连接牢固、可靠。
作为改进,连接有第二耳板的连接钢管端部设有封口隔板。
作为改进,所述的钢管柱外圆周壁和第一耳板之间焊接有第一加劲板,封口隔板和第二耳板之间焊接有第二加劲板。设置第一加劲板,增强了第一耳板和钢管柱的连接强度;设置第二加劲板,增强了第二耳板和连接钢管的连接强度。
作为改进,所述的钢管柱内设有内环隔板。内环隔板对钢管柱的内壁具有支撑作用,防止钢管柱受力后发生径向的变形,提高钢管柱的结构稳定性。
作为改进,第一耳板上位于铰接点处设有第一耳板加强环;第二耳板上位于铰接点处设有第二耳板加强环。设置第一和第二耳板加强环,提高了第一耳板和第二耳板在铰接点处的强度。
附图说明
图1为本实用新型的立体图。
具体实施方式
下面结合附图和具体实施方式对本实用新型进行进一步详细说明。
如图1所示的带转动的钢管连接节点,包括钢管柱1和连接钢管2。在钢管柱1的外圆周壁上焊接有第一耳板11,第一耳板11上开有轴孔12,在钢管柱1的外圆周壁和第一耳板11之间焊接有径向的第一加劲板13,以增强第一耳板11和钢管柱1之间的连接强度。在连接钢管2的一端部轴向插接有第二耳板21,第二耳板21的另一端安装有轴24,第一耳板11和第二耳板21通过轴和轴孔相铰接;连接有第二耳板21的连接钢管2端部固定有封口隔板22,封口隔板22和第二耳板之间焊接有第二加劲板23,以增强第二耳板21和连接钢管2之间的连接强度。所述的钢管柱1内设有内环隔板,内环隔板对钢管柱的内壁具有支撑作用,防止钢管柱受力后发生径向的变形,提高钢管柱的结构稳定性。第一耳板上位于铰接点处设有第一耳板加强环;第二耳板上位于铰接点处设有第二耳板加强环。设置第一和第二耳板加强环,提高了第一耳板和第二耳板在铰接点处的强度。
本实用新型的节点结构,由于第二耳板21是铰接在第一耳板11上,当受到拉索预应力的张拉时,第二耳板21会向受力大的一方旋转,使节点受力均匀,因此,在节点处不会造成局部的变形大而局部损坏节点结构,节点的承载能力大。
Claims (6)
1.带转动的钢管连接节点,包括钢管柱和连接钢管,其特征在于:钢管柱的外圆周壁上设有第一耳板,连接钢管的一端部设有第二耳板,所述的第二耳板铰接在第一耳板上。
2.根据权利要求1所述的带转动的钢管连接节点,其特征在于:与连接钢管连接的第二耳板端部轴向的插接在连接钢管内。
3.根据权利要求1所述的带转动的钢管连接节点,其特征在于:连接有第二耳板的连接钢管端部设有封口隔板。
4.根据权利要求3所述的带转动的钢管连接节点,其特征在于:所述的钢管柱外圆周壁和第一耳板之间焊接有第一加劲板,封口隔板和第二耳板之间焊接有第二加劲板。
5.根据权利要求1所述的带转动的钢管连接节点,其特征在于:所述的钢管柱内设有内环隔板。
6.根据权利要求1所述的带转动的钢管连接节点,其特征在于:第一耳板上位于铰接点处设有第一耳板加强环;第二耳板上位于铰接点处设有第二耳板加强环。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205977744U CN201850658U (zh) | 2010-11-09 | 2010-11-09 | 带转动的钢管连接节点 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205977744U CN201850658U (zh) | 2010-11-09 | 2010-11-09 | 带转动的钢管连接节点 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201850658U true CN201850658U (zh) | 2011-06-01 |
Family
ID=44093057
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205977744U Expired - Lifetime CN201850658U (zh) | 2010-11-09 | 2010-11-09 | 带转动的钢管连接节点 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201850658U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287009A (zh) * | 2011-07-15 | 2011-12-21 | 上海现代建筑设计(集团)有限公司 | 一种节点装置 |
CN106763037A (zh) * | 2017-01-10 | 2017-05-31 | 山东电力工程咨询院有限公司 | 一种螺纹式套管插板组合节点、方法及钢管塔 |
-
2010
- 2010-11-09 CN CN2010205977744U patent/CN201850658U/zh not_active Expired - Lifetime
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102287009A (zh) * | 2011-07-15 | 2011-12-21 | 上海现代建筑设计(集团)有限公司 | 一种节点装置 |
CN106763037A (zh) * | 2017-01-10 | 2017-05-31 | 山东电力工程咨询院有限公司 | 一种螺纹式套管插板组合节点、方法及钢管塔 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106836489B (zh) | 一种装配式圆形钢管套管纤维混凝土柱连接节点及安装方法 | |
CN105178443A (zh) | 一种适用于矩形钢管单层网壳的螺栓连接节点 | |
CN104074265B (zh) | 一种桁架式铝合金双层空间网格结构 | |
CN210140830U (zh) | 一种灌注桩后压浆注浆用快速接头 | |
CN203639005U (zh) | 一种塔吊的加固装置 | |
CN201850658U (zh) | 带转动的钢管连接节点 | |
CN102966185B (zh) | 新型钢管混凝土连接节点及其施工方法 | |
CN204199443U (zh) | 混合式钢管连接节点 | |
CN205779500U (zh) | 一种带内外筒壁连接结构的复式风机塔筒段及塔筒 | |
CN107725281B (zh) | 一种分片装配式t型钢内加劲风力机钢筒塔段 | |
CN101864727B (zh) | 拱桥主拱多次竖转施工中上、下拱肋的连接方法及中间铰 | |
CN201330900Y (zh) | 万向球窝接头 | |
CN201560584U (zh) | 泵送顶升浇筑混凝土可周转快速连接接头 | |
CN110671279B (zh) | 一种反向平衡法兰连接节点及其制作方法和应用 | |
CN201850653U (zh) | 大跨度斜拉结构塔柱板式拉索节点 | |
CN107270111A (zh) | 一种同心双管结构 | |
CN211525000U (zh) | 一种反向平衡法兰连接节点 | |
CN213479454U (zh) | 一种管道连接装置 | |
CN210714725U (zh) | 折叠式波纹钢结构 | |
CN207583874U (zh) | 可拆装联轴器 | |
CN202755982U (zh) | 一种铰接式针梁 | |
CN206988799U (zh) | 一种同心双管结构 | |
CN207695952U (zh) | 一种平面法兰-钢管焊接扶正器 | |
CN203877351U (zh) | 一种斗轮机轮体的连接结构 | |
CN111335139A (zh) | 一种钢管拱圈节段临时连接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20110601 |
|
CX01 | Expiry of patent term |