CN201838922U - Link rod - Google Patents

Link rod Download PDF

Info

Publication number
CN201838922U
CN201838922U CN2010205590248U CN201020559024U CN201838922U CN 201838922 U CN201838922 U CN 201838922U CN 2010205590248 U CN2010205590248 U CN 2010205590248U CN 201020559024 U CN201020559024 U CN 201020559024U CN 201838922 U CN201838922 U CN 201838922U
Authority
CN
China
Prior art keywords
electroscope
link rod
head
insulating bar
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010205590248U
Other languages
Chinese (zh)
Inventor
虞旭
王健
殷远东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YANGZHOU JIANGDU POWER SUPPLY COMPANY JIANGSU ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Yangzhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
JIANGDU POWER SUPPLY CORP JIANGSU POWER CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGDU POWER SUPPLY CORP JIANGSU POWER CORP filed Critical JIANGDU POWER SUPPLY CORP JIANGSU POWER CORP
Priority to CN2010205590248U priority Critical patent/CN201838922U/en
Application granted granted Critical
Publication of CN201838922U publication Critical patent/CN201838922U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model provides a link rod and relates to the structural improvement of a link rod in power construction. The link rod has the functions of electrometry and switching, thereby being capable of reducing a working procedure for transferring the tool between the operating personnel on a tower and the operating personnel under the tower. The link rod comprises an insulating rod, a work head, a top seat, an electroscope and a hinging seat, wherein the electroscope comprises an electroscope head and a tail screw head; the top seat is U-shaped, the bottom surface of the top seat is fixedly connected with the top end surface of the insulating rod, a side plate at one side of the top seat is fixedly connected with the work head, and another side plate at the other side is fixedly connected with an elastic clamping seat; and the hinging seat comprises a screw sleeve and a vertical sleeve, the vertical sleeve is vertical to the axes of the insulating rod to be connected with the surface of the insulating rod, the screw sleeve is hinged with the vertical sleeve, the screw sleeve is provided with a threaded hole, and the tail screw head of the electroscope is connected with the threaded hole. The link rod reduces the working procedure for transferring the tool between the operating personnel on the tower and the operating personnel under the tower, and can immediately perform the switching (switching off/on) operation after the electrometry, thereby greatly saving the maintenance time and improving the work efficiency.

Description

Link rod
Technical field
The utility model relates to the improvement to the instrument link rod structure in the power construction.
Background technology
In the inspection of distribution fortune, the cutter that draws, closes a floodgate is very frequent action.Since plug-in strip can not on-load operation, all circuit must be had a power failure earlier before each operation, just can operate after identifying true no-voltage again.At present, normally between 0.7m to 1.5M, the length of link rod is between the 3-6m to the galvanoscopic insulating bar working length of the 10KV of use, need change electroscope, link rod during plug-in strip on staff's operation post, is adjusted at the position of shaft tower operation.
Common working method has two kinds:
1, under the situation that no low-voltage circuit is joint used, the staff carries electroscope and steps on bar, arrives certain height, with electroscope circuit is carried out electrical verification, after identify not have pressing, do not drop to certain altitude again, the ground handling personnel pass to link rod that the operating personnel carries out grid switching operation on the bar;
2, as if under the situation that has low-voltage circuit to joint use, the staff climbs shaft tower earlier, in the time of apart from the certain safe distance of lower floor's circuit, by the ground handling personnel with the electroscope colligation on link rod, pass to that operating personnel carry out electrical verification on the bar, identify true no-voltage after, then instrument is passed to the ground staff, the ground handling personnel untie electroscope, once more link rod are passed to operating personnel on the bar, carry out grid switching operation.We find that the principal element that influences the electrical verification operating efficiency is the time of electrical verification, operation.Existing electrical verification method of operation is carried out conscientious analysis, set this movable target,, improve the purpose of operational efficiency to reach the shortening interruption duration for improving plug-in strip electrical verification operation rate on the post.
That is to say that operating personnel need use two kinds of instruments to finish two actions.Like this, issue an order to electrical verification, complete operation again from the licensor, whole process need is about 10 minutes.Interruption duration is long like this, not only influences power supply reliability, causes the loss of big volume and electricity, and present supply network complexity, makes the probability that the electric situation of misdelivery takes place become big, and circuit is charged, causes pernicious misoperation.How to improve on the post plug-in strip electrical verification grid switching operation efficient and be exactly our emphasis to be solved.
The utility model content
The utility model provides a kind of and has had electrical verification, two kinds of functions of back brake concurrently at above problem, thereby can reduce the link rod of delivery program on one tower, under the tower.
The technical solution of the utility model is: comprise insulating bar and working head, it also comprises footstock, electroscope and hinged seat; Described electroscope comprises electrical verification head and tail portion spiral shell head; Described footstock takes the shape of the letter U, and the bottom surface is fixedly connected on the top end face of described insulating bar, is fixedly connected with described working head on the side side plate of footstock, and the opposite side side plate is provided with elastic clamp seat; Described hinged seat comprises swivel nut and upright cover, and described upright cover is connected the insulating bar surface perpendicular to the insulating bar axis, and described swivel nut is hinged with upright cover, and described swivel nut is provided with screwed hole, and described galvanoscopic afterbody spiral shell head connects described screwed hole.
Described upright cover is connected the surface of described insulating bar rotationally.
The utility model is set up an electroscope in the link rod end, and electroscope can be with respect to the link rod translation-angle, and detachable.When not needing electrical verification, can be by the effectively fixing electroscope of elastic clamp seat; Elastic clamp seat preferable alloy electric conducting material, footstock also are the metallic conduction material, and all metal partss at insulating bar top all can be as detecting conductor like this.Less as the test point area, also be easy to the electrical verification head is separated directly aim detecting point electrical verification from elastic clamp seat.The utility model has reduced the instrument on the tower, under the tower between the operating personnel and has sent operation, after the electrical verification, carries out back brake (divide, close a floodgate) operation immediately, has saved maintenance time greatly, has improved operating efficiency.
Description of drawings
Fig. 1 is a structural representation of the present utility model
1 is insulating bar among the figure, the 2nd, and upright cover, the 3rd, hinge pin, the 4th, swivel nut, the 5th, spiral shell head, the 6th, electroscope, the 7th, electrical verification head, the 8th, elastic clamp seat, the 9th, footstock, the 10th, working head.
Fig. 2 is the utility model user mode reference diagram
Embodiment
The utility model comprises insulating bar 1 and working head 10 as shown in Figure 1, and it also comprises footstock 9, electroscope 6 and hinged seat; Described electroscope 6 comprises electrical verification 7 and afterbody spiral shell head 5; Described footstock 9 takes the shape of the letter U, and the bottom surface is fixedly connected on the top end face of described insulating bar 1, is fixedly connected with described working head 10 on the side side plate of footstock 9, and the opposite side side plate is provided with elastic clamp seat 8; Described hinged seat comprises swivel nut 4 and upright cover 2, described upright cover 2 is connected the surface of insulating bar 1 perpendicular to insulating bar 1 axis, described swivel nut 4 is hinged by hinge pin 3 and upright cover 2, and described swivel nut 4 is provided with screwed hole, and the afterbody spiral shell head 5 of described electroscope 6 connects described screwed hole.
Described upright cover 2 is connected the surface of described insulating bar 1 rotationally.Be that between is provided with a damping tumbler, can realize that so omnibearing angle changes.
The trial-production example: link rod is installed a homemade nylon hinge apart from top 15mm place, hinge is made up of upright cover 2, swivel nut 4 two parts, the upright cover 2 of hinge lower end is fixed (also can be according to aforementioned optimal way, both are flexibly connected) on the insulating bar 1 of link rod, upper end swivel nut 4 has screw thread to revolve mouth for rotating part and top, be connected with the metal spiral shell head 5 of electroscope 6, as the pedestal of electroscope 6.Partly weld a metal jump ring (elastic clamp seat 8) in the link rod top metal, be used to block the conducting position (electrical verification 7) of electroscope 6.
Effect: make the electroscope fixation, current-carrying part connects reliable.Behind the end of operation, but electroscope, and it is not fragile just to make electroscope and link rod separate keeping.
Galvanoscopic electrical verification effect.After electroscope and the reliable combination of link rod, in the metal spring card that galvanoscopic conducting position just is fixed, spring is welded on the link rod insulating bar top metal parts.When the link rod metallic conduction partly contacted testee, electroscope just can identify whether there is voltage.
Secure context: spring chuck be connected the back side that hinge all is installed in the link rod working head, and electroscope is fixedly secured up and down.When link rod carried out grid switching operation, the electroscope position can at will not moved, and can not influence the operation of link rod.Behind the grid switching operation, can not get to electroscope when plug-in strip hangs from above yet, damage electroscope.
Practicality is stronger, and it is more convenient to operate, in electrical verification work, should use very soon, than original saving of time a lot; During operation, electrical verification has constantly further improved the fail safe that electrical verification is operated, and has improved operational management efficient.
Electroscope is with after link rod reliably is connected, and when the link rod metal partly touched electrified body, electroscope just sent sound, light is pointed out.If circuit is owing to other reason is charged, novel link rod can send sound, light indication in the very first time, the fail safe of grid switching operation is further strengthened.
When drawing, closing a floodgate cutter, circuit can not on-load, needs earlier plug-in strip epimere switch to be disconnected, and treat that plug-in strip identifies not have to press, and after the operation, recovers the power supply of epimere switch.After using novel link rod, simplify job step, shortened interruption duration, reduced the loss of electric weight.Loss electric weight S=P stops * and t stops.

Claims (2)

1. link rod comprises insulating bar and working head, it is characterized in that, it also comprises footstock, electroscope and hinged seat; Described electroscope comprises electrical verification head and tail portion spiral shell head; Described footstock takes the shape of the letter U, and the bottom surface is fixedly connected on the top end face of described insulating bar, is fixedly connected with described working head on the side side plate of footstock, and the opposite side side plate is provided with elastic clamp seat; Described hinged seat comprises swivel nut and upright cover, and described upright cover is connected the insulating bar surface perpendicular to the insulating bar axis, and described swivel nut is hinged with upright cover, and described swivel nut is provided with screwed hole, and described galvanoscopic afterbody spiral shell head connects described screwed hole.
2. link rod according to claim 1 is characterized in that described upright cover is connected the surface of described insulating bar rotationally.
CN2010205590248U 2010-09-30 2010-09-30 Link rod Expired - Fee Related CN201838922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205590248U CN201838922U (en) 2010-09-30 2010-09-30 Link rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205590248U CN201838922U (en) 2010-09-30 2010-09-30 Link rod

Publications (1)

Publication Number Publication Date
CN201838922U true CN201838922U (en) 2011-05-18

Family

ID=44009022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205590248U Expired - Fee Related CN201838922U (en) 2010-09-30 2010-09-30 Link rod

Country Status (1)

Country Link
CN (1) CN201838922U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104157530A (en) * 2014-08-06 2014-11-19 国家电网公司 Insulation rod used for fixing fusion tube

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104157530A (en) * 2014-08-06 2014-11-19 国家电网公司 Insulation rod used for fixing fusion tube

Similar Documents

Publication Publication Date Title
CN201750204U (en) Direct current double-power-supply intelligent switching device
CN107404070A (en) Anti-misoperation type measurent wiring box device
CN202839331U (en) 10kV multifunctional insulated operating rod
CN202735457U (en) Device for detecting state of temporary ground wire
CN201838922U (en) Link rod
CN203037724U (en) High-voltage electroscope
CN203760864U (en) Automatic distribution-network pole-mounted switch cabinet capable of remote monitoring
CN212275837U (en) High-voltage alternating current electricity testing device and grounding device
CN204680986U (en) Feed line automatization terminal control panel on a kind of bell-type post
CN208255270U (en) Novel multifunctional insulating rod operating rod
CN205157712U (en) Insulating telescopic link detection device is put in combined electrical apparatus office
CN102447223A (en) Operating rod
CN208254544U (en) Intelligent network distribution transformer monitoring device
CN101763758B (en) Relay protection wiring comprehensive operation training system
CN206832898U (en) A kind of power switch cabinet core is to dolly
CN206211063U (en) Smart grounding wire clamp
CN215681798U (en) Voltage parallel device capable of automatically switching states
CN201716364U (en) Combined high voltage electroscope
CN207573068U (en) A kind of circuit resistance tester supplies electric installation
CN208939663U (en) A kind of intelligent micro-grid control device
CN203895982U (en) Live-line load transfer system for distribution network circuit
CN206710584U (en) A kind of 10kV switch cabinet current transformers test fixture
CN203800200U (en) Portable ground wire
CN202712719U (en) Electricity testing and switching operation integration device
CN201897861U (en) Automatic electricity induction voice alarm device for grounding wires

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JIANGSU ELECTRIC POWER COMPANY, YANGZHOU JIANGDU P

Free format text: FORMER OWNER: JIANGDU POWER SUPPLY CORP. JIANGSU POWER CORP.

Effective date: 20121113

Owner name: YANGZHOU POWER SUPPLY CO., JIANGSU PROV ELECTRIC P

Effective date: 20121113

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20121113

Address after: 225200 No. 38 East worker peasant Road, Jiangdu District, Jiangsu, Yangzhou

Patentee after: Yangzhou Jiangdu Power Supply Company, Jiangsu Electric Power Company

Patentee after: Yangzhou Power Supply Company of Jiangsu Electric Power Company

Patentee after: Jiangsu Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 225200 No. 38 East worker peasant Road, Jiangdu City, Jiangsu Province

Patentee before: Jiangdu Power Supply Corp. Jiangsu Power Corp.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110518

Termination date: 20170930

CF01 Termination of patent right due to non-payment of annual fee