CN201834982U - Integrated pre-tightening air cylinder device - Google Patents

Integrated pre-tightening air cylinder device Download PDF

Info

Publication number
CN201834982U
CN201834982U CN2010205922012U CN201020592201U CN201834982U CN 201834982 U CN201834982 U CN 201834982U CN 2010205922012 U CN2010205922012 U CN 2010205922012U CN 201020592201 U CN201020592201 U CN 201020592201U CN 201834982 U CN201834982 U CN 201834982U
Authority
CN
China
Prior art keywords
air cylinder
piston
nut
cylinder device
piston rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205922012U
Other languages
Chinese (zh)
Inventor
唐锋
段晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010205922012U priority Critical patent/CN201834982U/en
Application granted granted Critical
Publication of CN201834982U publication Critical patent/CN201834982U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an integrated pre-tightening air cylinder device. A sliding baffle (7) and a spring assembly (8) are externally sleeved on a hollow shaft (1) which is sleeved on a piston rod (14); the left end of the hollow shaft (1) is connected with a round nut (2); an end cover (4), a cylinder body (9) and an air cylinder cover (12) are connected with a nut (6) through a screw (5); a piston (11) is arranged on the piston rod (14); a buffer (13) is arranged on the piston (11); and a mounting screw (15) and a mounting nut (16) are arranged on the air cylinder cover (12). A limiting casing (10) is welded on the end cover (4) which is provided with an adjusting bolt (3). The integrated pre-tightening air cylinder device is compact and has large and adjustable pre-tightening force and can reliably realize the compactness of an aluminum guide rod and a bus and the stretching of a clamp in an anode bus lifting framework.

Description

Integrated form pretension air cylinder device
Technical field
This practicality relates to the integrated form power set in the operating process of a kind of aluminum electrolysis industry positive bar lift frame.
Background technology
The effect of the positive bar lift frame that potroom uses is the anchor clamps on the cylinder ventilation promotion piston rod drive positive bar lift frame that makes on it, make aluminium guide bar compress bus, clamp the capsule anchor clamps of aluminium guide bar then with tool to open, at last to lift energising beginning to promote bus.In the process that bus promotes, because the reactive force of anchor clamps upper cylinder, aluminium guide bar and bus are in fit-state all the time.After the bus lifting puts in place, tighten the capsule anchor clamps with instrument, aluminium guide bar and bus are fit together closely.Afterwards, close source of the gas, make anchor clamps be in relaxed state, at last the positive bar lift frame is hung electrolyzer, finish bus and promote action by return spring.If positive bar lift frame supply gas pressure in operating process is not enough or die, then to fit bad between aluminium guide bar and the bus or break away from, this will cause ordinary production and have a strong impact on.
Summary of the invention
The technical problem that this practicality will solve is, a kind of integrated form pretension air cylinder device is provided, this device utilizes the preliminary tension of power set medi-spring self to make aluminium guide bar be adjacent to bus by the anchor clamps in the positive bar lift frame when the positive bar lift frame is operated, and make opening of anchor clamps in the piston rod pulling positive bar lift frame by the cylinder air feed, fit bad between aluminium guide bar that prior art exists and the bus or break away to overcome, have a strong impact on the deficiency of production.
This practicality is by the following technical solutions: slide damper and spring assembly are enclosed within on the tubular shaft outward, hollow shaft sleeve is on piston rod, the tubular shaft left end is connected with round nut, end cap, cylinder body and cylinder head link into an integrated entity by screw rod and nut, piston is arranged on piston rod, snubber is arranged on piston, the installation screw rod is arranged on cylinder head.
On end cap, be welded with spacing collar, with the stroke of limited piston bar, piston.
The adjustment bolt is arranged on end cap.Between slide damper and the end cap, can be by adjusting the effect of bolt, both are reclined mutually or do not recline, to adjust the preliminary tension of spring assembly.
This utility structure compactness, preliminary tension is big and adjustable, can reliably realize aluminium guide bar and bus compress and the positive bar lift frame in the opening of anchor clamps.
Description of drawings
Fig. 1 is this practical structural representation;
Fig. 2 is this practical piston rod construction synoptic diagram.
Embodiment
The embodiment that this is practical: as shown in Figure 1, the formation of this practicality mainly is made up of tubular shaft 1, round nut 2, adjustment bolt 3, end cap 4, screw rod 5, nut 6, slide damper 7, spring assembly 8, cylinder body 9, spacing collar 10, piston 11, cylinder head 12, snubber 13, piston rod 14, installation screw rod 15, installation nut 16 etc.Slide damper 7 and spring assembly 8 outer being enclosed within on the tubular shaft 1, tubular shaft 1 is enclosed within on the piston rod 14, tubular shaft 1 left end is connected with round nut 2, end cap 4, cylinder body 9 and cylinder head 12 are connected to become integral body by screw rod 5 and nut 6, piston 11 is arranged on piston rod 14, snubber 13 is arranged on piston 11, the screw rod of installation 15 is arranged on cylinder head 12 and nut 16 is installed.
Slide damper 7 and spring assembly 8 and tubular shaft 1 assembling, slide damper 7 can slide on tubular shaft 1, play the effect of compression spring and guiding, tubular shaft 1 left end has been attacked screw thread, cooperate with round nut 2, end cap 4, cylinder body 9 and cylinder head 12 are an integral body by screw rod 5 and nut 6 with sealings such as slide damper 7, spring assembly 8 and pistons 11.Spacing collar 10 plays the effect of limited piston stroke, and snubber 13 is avoided piston 11 and cylinder head 12 rigid shocks, and adjustment bolt 3 is used for the adjustment to this device preliminary tension, screw rod 15 is installed with installation nut 16 this device and mounting plate is fixed.
Piston rod construction as schematically shown in Figure 2.Because piston rod 14 right-hand members link to each other with mounting plate, be not easy to air inlet, so piston rod 14 left ends have been attacked internal thread M1 and had air inlet port d2, d4, pressurized gas enters the right chamber of cylinder by M1, d2 and d4, promote piston rod 14 certain distance that moves to left, piston rod 14 drives tubular shaft 1 and moves to left, and rotational circle nut 2 cuts off source of the gas up to compressing slide damper 7, tighten then and adjust bolt 3, thereby realize adjustment this device preliminary tension.The piston rod right-hand member has outside screw M2, is used to connect piston.

Claims (3)

1. integrated form pretension air cylinder device, it is characterized in that: slide damper (7) and spring assembly (8) are outer to be enclosed within on the tubular shaft (1), tubular shaft (1) is enclosed within on the piston rod (14), tubular shaft (1) left end is connected with round nut (2), end cap (4), cylinder body (9) and cylinder head (12) link into an integrated entity by screw rod (5) and nut (6), piston (11) is arranged on piston rod (14), snubber (13) is arranged on piston (11), installation screw rod (15) is arranged on cylinder head (12).
2. integrated form pretension air cylinder device according to claim 1 is characterized in that: be welded with spacing collar (10) on end cap (4).
3. integrated form pretension air cylinder device according to claim 1 is characterized in that: adjustment bolt (3) is arranged on end cap (4).
CN2010205922012U 2010-11-05 2010-11-05 Integrated pre-tightening air cylinder device Expired - Lifetime CN201834982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205922012U CN201834982U (en) 2010-11-05 2010-11-05 Integrated pre-tightening air cylinder device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205922012U CN201834982U (en) 2010-11-05 2010-11-05 Integrated pre-tightening air cylinder device

Publications (1)

Publication Number Publication Date
CN201834982U true CN201834982U (en) 2011-05-18

Family

ID=44005087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205922012U Expired - Lifetime CN201834982U (en) 2010-11-05 2010-11-05 Integrated pre-tightening air cylinder device

Country Status (1)

Country Link
CN (1) CN201834982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465316A (en) * 2010-11-05 2012-05-23 贵阳铝镁设计研究院有限公司 Integrated preloading cylinder device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102465316A (en) * 2010-11-05 2012-05-23 贵阳铝镁设计研究院有限公司 Integrated preloading cylinder device
CN102465316B (en) * 2010-11-05 2014-05-28 贵阳铝镁设计研究院有限公司 Integrated preloading cylinder device

Similar Documents

Publication Publication Date Title
CN202140369U (en) Single-acting cylinder
CN207523372U (en) A kind of Portable integrated tyre bead breaker
CN201834982U (en) Integrated pre-tightening air cylinder device
CN201420662Y (en) Flange-thread connected tightening cross head
CN201834984U (en) Pre-tightening air cylinder device
CN201834981U (en) Spring pre-tightening cylinder device
CN102465316B (en) Integrated preloading cylinder device
CN102465318B (en) Spring preloading air cylinder device
CN102465319B (en) Preloaded cylinder device
CN208442104U (en) A kind of times strength cylinder
CN202468036U (en) Novel gas exhaust braking valve and automobile adopting same
CN206054432U (en) Single action thin cylinder
CN201669506U (en) Platoon welding machine
CN213478814U (en) Hydraulic cylinder convenient to dismantle and maintain
CN208716362U (en) A kind of cutting machine automation material grabbing mechanism
CN201834986U (en) Single-acting cylinder
CN102465317B (en) Preloading mechanism with adjustable spring
CN201128132Y (en) Special pin puller
CN104454762B (en) Nitrogen spring restored cylinder with pantograph two-stage pistons
CN209648075U (en) Valve core nut fitting machine
CN201834983U (en) Adjustable spring pre-tightening mechanism
CN208996707U (en) A kind of balancing device for hydraulic pumping unit
CN202894717U (en) Assembling fixture for gas inlet assembly
CN202212743U (en) Novel booster-type pin disassembly device of hinge-type cubic anvil press
CN202193860U (en) Self-locking pressure shell cylinder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550003 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

AV01 Patent right actively abandoned

Granted publication date: 20110518

Effective date of abandoning: 20140528

RGAV Abandon patent right to avoid regrant