CN201819848U - Pressure test instrument for water supply branch pipe for construction - Google Patents
Pressure test instrument for water supply branch pipe for construction Download PDFInfo
- Publication number
- CN201819848U CN201819848U CN2010202852997U CN201020285299U CN201819848U CN 201819848 U CN201819848 U CN 201819848U CN 2010202852997 U CN2010202852997 U CN 2010202852997U CN 201020285299 U CN201020285299 U CN 201020285299U CN 201819848 U CN201819848 U CN 201819848U
- Authority
- CN
- China
- Prior art keywords
- pressure testing
- construction
- valve
- branch pipe
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 31
- 238000010276 construction Methods 0.000 title claims abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title abstract 3
- 230000008676 import Effects 0.000 claims abstract description 6
- 238000009434 installation Methods 0.000 abstract 1
- 238000004064 recycling Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
Images
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
The utility model discloses a construction is with feedwater branch pipe pressure testing instrument, the front end that feedwater was responsible for (8) is connected with inlet valve (9), inlet valve (9) be connected with import external thread direct pipe (10), the rear end that feedwater was responsible for (8) be connected with valve (3), valve (3) be connected with manometer (1) feedwater be responsible for (8) on establish ties and have a plurality of tee bend (4), every tee bend (4) be connected with a branch pipe (7), every the tip of branch pipe (7) be equipped with first external thread direct pipe (6). The utility model relates to a be convenient for installation, reuse can make the water supply pipe on every layer of building pressure testing simultaneously and simple structure, reliable performance's water supply branch pipe pressure testing instrument for construction.
Description
Technical field
The utility model relates to a kind of subfeeder pressure testing instrument, particularly relates to a kind of construction subfeeder pressure testing instrument.
Background technology
After feedwater piping installs, need be the subfeeder pressure testing.Every layer of feedwater piping generally all has many arms, and every arm all needs pipeline pressure test (comprising intensive properties test and leak test, is that example needs 3 hours altogether with the PP-R pipe), takies the plenty of time, and the utility model makes the pressure testing simultaneously of every layer of arm, saves time.
The utility model content
Technical problem to be solved in the utility model provides a kind of being convenient to and installs, and reuses, and can make the construction subfeeder pressure testing instrument of the feedwater piping pressure testing simultaneously of every layer of building.
In order to solve the problems of the technologies described above, the construction that the utility model provides subfeeder pressure testing instrument, service main's front end is connected with imported valve, described imported valve is connected with directly pipe of the outer silk of import, described service main's rear end is connected with valve, and described valve is connected with tensimeter, is in series with a plurality of threeways on described service main, each described threeway is connected with an arm, and the end of every described arm is provided with directly pipe of the first outer silk.
Described arm is provided with loose joint.
Described valve is directly managed by the second outer silk and is connected described tensimeter.
Adopt the construction subfeeder pressure testing instrument of technique scheme, connecting branch on the service main, arm quantity is determined according to every layer arm quantity, loose joint is set on arm, be convenient to regulate a length of tube, be connected with the pipeline that needs pressure testing, the direct pipe of silk outside first is set on arm, be connected with the outer wire connection mouth that needs pressure testing with it.Silk is directly managed outside imported valve is connected with import, is connected with manual pressure test pump with it.
The utility model connects each effective service main, and the service main top connects tensimeter, the moving test pump of service main below catcher, can the disposable test pumped well in all arm pipeline pressures, be convenient to install recycling.
In sum, the utility model is that a kind of being convenient to installed, and recycling can make feedwater piping pressure testing simultaneously and the construction subfeeder pressure testing instrument simple in structure, dependable performance of building every layer.
Description of drawings
Fig. 1 is the utility model structural representation.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1, service main 8 front end is connected with imported valve 9, imported valve 9 is connected with directly pipe 10 of the outer silk of import, service main 8 rear end is connected with valve 3, described valve 3 is directly managed 2 by the second outer silk and is connected with tensimeter 1, is in series with 5 threeways 4 on service main 8, and each threeway 4 is connected with an arm 7, arm 7 is provided with loose joint 5, and the end of every arm 7 is provided with directly pipe 6 of the first outer silk.
Referring to Fig. 1, connecting branch 7 on service main 8, arm 7 quantity are determined according to every layer arm quantity, loose joint 5 is set on arm 7, be convenient to regulate arm 7 length and dismounting, be connected with the pipeline that needs pressure testing, the direct pipe 6 of silk outside first is set on arm 7, be connected with the outer wire connection mouth that needs pressure testing with it.Be connected with the direct pipe 10 of silk outside the import at imported valve 9, be connected with manual pressure test pump with it.
The utility model connects service main of each arm 7 usefulness 8, and service main 8 tops connect tensimeter 1, the moving test pump of service main 8 belows catcher, can the disposable test pumped well in all arm pipeline pressures, be convenient to install recycling.
Claims (3)
1. a construction is with subfeeder pressure testing instrument, it is characterized in that: service main's (8) front end is connected with imported valve (9), described imported valve (9) is connected with directly pipe (10) of the outer silk of import, described service main's (8) rear end is connected with valve (3), described valve (3) is connected with tensimeter (1), on described service main (8), be in series with a plurality of threeways (4), each described threeway (4) is connected with an arm (7), and the end of every described arm (7) is provided with directly pipe (6) of the first outer silk.
2. construction according to claim 1 subfeeder pressure testing instrument, it is characterized in that: described arm (7) is provided with loose joint (5).
3. construction according to claim 1 and 2 subfeeder pressure testing instrument is characterized in that: described valve (3) is directly managed (2) by the second outer silk and is connected described tensimeter (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202852997U CN201819848U (en) | 2010-08-09 | 2010-08-09 | Pressure test instrument for water supply branch pipe for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202852997U CN201819848U (en) | 2010-08-09 | 2010-08-09 | Pressure test instrument for water supply branch pipe for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201819848U true CN201819848U (en) | 2011-05-04 |
Family
ID=43917798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202852997U Expired - Fee Related CN201819848U (en) | 2010-08-09 | 2010-08-09 | Pressure test instrument for water supply branch pipe for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201819848U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102507171A (en) * | 2011-10-21 | 2012-06-20 | 浙江宇宙智能设备有限公司 | High-pressure water jet equipment part high-efficiency fatigue test device and test method thereof |
CN102944381A (en) * | 2012-10-17 | 2013-02-27 | 中建三局第一建设工程有限责任公司 | Pressure test device for combined valve component |
CN105841901A (en) * | 2016-05-11 | 2016-08-10 | 江门市南洋船舶工程有限公司 | Pipe pressure testing apparatus |
-
2010
- 2010-08-09 CN CN2010202852997U patent/CN201819848U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102507171A (en) * | 2011-10-21 | 2012-06-20 | 浙江宇宙智能设备有限公司 | High-pressure water jet equipment part high-efficiency fatigue test device and test method thereof |
CN102944381A (en) * | 2012-10-17 | 2013-02-27 | 中建三局第一建设工程有限责任公司 | Pressure test device for combined valve component |
CN105841901A (en) * | 2016-05-11 | 2016-08-10 | 江门市南洋船舶工程有限公司 | Pipe pressure testing apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201819848U (en) | Pressure test instrument for water supply branch pipe for construction | |
CN103091174A (en) | Method for testing pressure of large-diameter extra-long PE pipe | |
CN201225515Y (en) | Drainage device of steam heating system | |
CN205157337U (en) | Polylinker pipeline pressure testing device | |
CN202411055U (en) | Skid-mounted pipeline cleaning send-receive ball cylinder device | |
CN201778995U (en) | Simulative deep well testing pipeline utilizing submersible pump | |
CN107024344A (en) | A kind of complete pressurized equipment performance detection testing bench of secondary water-supply | |
CN201421423Y (en) | Device for testing long-term hydrostatic pressure in glass reinforced plastic pipeline | |
CN207609891U (en) | Oil circuit piecing devices | |
CN202707475U (en) | Novel vertical type water pump inlet and outlet complete device | |
CN205116297U (en) | Variable frequency water supply equipment | |
CN205101703U (en) | Pump mouth connection structure | |
CN203224332U (en) | Novel installing structure for water treating equipment pressure meter | |
CN208254552U (en) | A kind of thermal test flow differential pressure transmitter attachment device | |
CN202066534U (en) | Pressure guiding device of throttling device of standard orifice plate of non-pressure-guiding pipeline | |
CN206683847U (en) | The complete pressurized equipment performance detection testing bench of secondary water-supply | |
CN202469331U (en) | Four-way pipe | |
CN201363094Y (en) | Pipe nipple with filling and temperature-pressure measurement connection pipes | |
CN203363495U (en) | Quick connector allowing pipe body to turn freely | |
CN202360951U (en) | Connecting joint for pipes with different diameters | |
CN208858551U (en) | A kind of pump test pipe-line system | |
CN217006249U (en) | Assembled pipeline leaks quick pressure testing device after water spot maintenance | |
CN110160884A (en) | Bull water pressure test distributor | |
CN201496721U (en) | Instrument connecting device | |
CN213712232U (en) | Metal collapsible tube convenient to dismantle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110504 Termination date: 20140809 |
|
EXPY | Termination of patent right or utility model |